121 BP Phase 1-LR 991103 GEOTFCHNICAL ANE; J~ I=:;J r-1 I I
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 115
P.O. Box 802047 REG PROJECT NO. 5607
Dallas~ Texas 75380-2047 SAMPLE DATE: 11-03-99
ATTN: Mr. John Walsh TECHNICIAN: F. Steadman
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number j Location J Quantity Represented
1 Paving: 45'N. 35'E of SE Corner of Bldg. #5 50/400
2 Paving: 125'S, 40'E of NE Corner of Bldg. #5 170/400
3 Paving: 50'N. 50'E of NE Corner of Bldg. #5 250/400
4 Paving: 50'N, 10'W of NW Corner of Bldg. #5 370/400
Design Information
JSource of Concrete J Mix Identification J Specified Strength p.s.i.
Lattimore 42 4000
Test Results
set J Cy,inder J j ^oee j Tota,,oad Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 9535 10-11-99 7 110850 3920
9535 12-01-99 28 138840 4910
9535 12-01-99 28 138420 4900 4910
9535 Hold
2 9536 10-11-99 7 106210 3760
9536 12-01-99 28 134990 4770
9536 12-01-99 28 136530 4830 4800
9536 Hold
3 9537 10-11-99 7 102440 3620
9537 12-01-99 28 127540 4510
9537 12-01-99 28 124470 4400 4460
9537 Hold
4 9538 10-11-99 7 118040 4180
9538 12-01-99 28 138000 4880
9538 12-01-99 28 144930 5130 5010
9538 Hold
2424 STUTZ DR SUITE 42'*, · DALLAS TX 75225 · TEL i2!z] 356 5E33 · FAX ]2'4~ 35C
Cylinder Data
N0i' ':': i::tD i:i::.1' SlumP:':: ::i:.Sample AirTemp. '1 Temp. . E:.ntrainment:.I "Numbe~;
1 9535 4.75 8:50 AM 48 57 6.2 6110659
2 9536 5.25 10:25 AM 58 65 6.6 6110681
3 9537 5.00 11:35 AM 66 68 6.0 6110696
4 9538 5.00 1:05 PM 66 67 6.1 7079397
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(1) i-he Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
GEOTECHNICAL AI~.~, I~ I~ I'--1 I I
ENV,RONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 115
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 11-03-99
ATTN: Mr. John Walsh TECHNICIAN: F. Steadrnan
CONTRACTOR: Westcliffe, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 45'N. 35'E of SE Corner of Bldg. #5 50/400
2 Paving: 125'S. 40'E of NE Corner of Bldg. #5 170/400
3 Paving: 50'N. 50'E of NE Corner of Bldg. #5 250/400
4 Paving: 50'N. 10'W of NW Corner of Bldg. #5 370/400
Design Information
Source of Concrete t Mix Identification Specified Strength p.s.i.
Lattimore 42 4000
Test Results
Set I Cylinder1 I Age@ ITotal Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p,s.i, p.s.i.
1 9535 10-11-99 7 110850 3920
9535 12-01-99 28
9535 12-01-99 28
9535 Hold
2 9536 10-11-99 7 106210 3760
9536 12-01-99 28
9536 ! 2-01-99 28
9536 Hold
3 9537 10-11-99 7 102440 3620
9537 12~01-99 28
9537 12-01-99 28
9537 Hold
4 9538 10-11-99 7 118040 4180
9538 12-01-99 28
9538 12-01-99 28
9538 Hold
2424 ST:JTZ DR SUITE 4C6 · DALLAS. 'rx 75235 · TEL ~2'4] 3.~Z- ~'~ZZ · F;~X ~2;,:~ 3EZ ZZ'[-
Cylinder Data
'-~.~Set [:: Cy!!nde~::~:i:ll ..... ~.l:~::::Time:of- ' '."l~iCOncrete:t'~:i::::::' Ai~:~:.: : -
':'No. .:::ID .:~:' I S!umP;:~;:~l!:::-::sampie:. t AirTemp- 1 Temp. ......... -t:-:'E~itrainhient !:1 -Number:::'"Ticket:'
I 9535 4.75 8:50 AM 48 57 6.2 6110659
2 9536 5.25 10:25 AM 58 65 6.6 6110681
3 9537 5.00 11:35 AM 66 68 6.0 6110696
4 9538 5.00 1:05 PM 66 67 6.1 7079397
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger