Loading...
121 BP Phase 1-LR 991028 GEOTECHNICAL AND I~ R I"-1 I I FTM ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B & D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 112 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-28-99 A'I'TN: Mr. John Welsh TECHNICIAN: S. Holiday CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented I Footing C-10.9, Bldg #2 2/2 Design Information ! Source of Concrete I Mix Identification I Specified Strength p.s.i. I Lattimore 46 3000 Test Results Set I CylinderI Agel~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 9382 11-01-99 3 72900 2580 9382 11-04-99 7 89990 3180 2880 9382 11-25-99 28 123400 4370 i 9382 11-25-99 28 120080 4250 4310 Cylinder Data Set I Cylinder I Time of I Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 9382 5.00 5:10 PM 80 82 N/A 7079198 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ ,DR · SU'TE 400 · DA_-AS TX 7522,5 · TE_ 12',4] 25.~ !~---- · =AX ~2'-'-~ .~-~ 3:~'~- GEOTECHNIC~L AND ~ F=I r-i U F::3 ENV ~ONt4ENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 111 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 10-28-99 ATTN: Mr. John Walsh TECHNICIAN' J, Baradziej CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 75'S. 150'W of SE Corner of Bldg. "C" 90/500 2 Paving: 50'S. 120'W of SE Corner of Bldg. "C" 170/500 3 Paving: 60'S. 60'W of SE Corner of Bldg. "C" 230/500 4 Paving: 40'S. 20'E of SW Corner of Bldg. "D" 330/500 5 Paving: 70'S. 80'E of SW Corner of Bldg."D" 420/500 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. I Lattimore 42 4000 Test Results Set CylinderI Age~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 9331 11-04-99 7 105330 3730 9331 11-25-99 28 128020 4530 9331 11-25-99 28 136230 4820 4680 9331 Hold 2 9332 11-04-99 7 102230 3620 9332 11-25-99 28 126360 4470 9332 11-25-99 28 127750 4520 4500 9332 Hold 3 9333 11-04-99 7 95440 3380 9333 11-25-99 28 123350 4360 9333 11-25-99 28 123970 4390 4380 9333 Hold 4 9334 11-04-99 7 91370 3230 9334 11-25-99 28 117390 4150 9334 11-25-99 28 115280 4080 4120 9334 Hold 5 9335 11-04-99 7 90800 3210 9335 11-25-99 28 114840 4060 9335 11-25-99 28 114310 4050 4060 9335 Hold 2424 S-riTZ DR SU'TE 4:_* · CALLAS '~X -~Z3~ · TE_ ;£'4' 3._=,_* ~=53£, · FAX ~2'4~ 35.'_' 33'9 Cylinder Data SlumP;'i'l:::samp!e . AirTemp. Temp. I'.Entrainment-' 'Nu'mber 1 9331 5.00 4:15 AM 58 73 4.25 3093960 2 9332 5.00 5:00 AM 58 75 5.0 3093966 3 9333 5.00 5:50 AM 58 75 4.25 3093972 4 9334 5.00 7:00 AM 55 75 4.5 3093983 5 9335 5.00 9:00 AM 63 75 5.0 3094001 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger GEGTECHNICAL AND ~ F:;I I-"1 ENV-RONMENTAL CONSULTAI~TS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 112 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 10-28-99 ATTN: Mr. John Walsh TECHNICIAN: S. Holiday CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Footing C-10.9. Bldg #2 2/2 Design Information i Source of Concrete I Mix Identification Specified Strength p.s.i. i Lattimore 46 3000 Test Results Set I Cylinder I Age ~ Total Load Compressive Average Strength No.I ID I Date Tested Test lbs. Strength p.s.i, p.s.i. 1 9382 11-01-99 3 72900 2580 9382 11-04-99 7 89990 3180 2880 9382 11-25-99 28 9382 11-25-99 28 Cylinder Data Set I Cylinder Time of I Concrete I Air ! Ticket No. ID Slump Sample Air Temp. Temp. Entrainment i Number 1 9382 5.00 5:10 PM 80 82 N/A 7079198 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construcbon/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR SUITE zOO · DA:-'-AS TX 75';35 · TE_ [214] .~'.'fi ~6ZZ · =;'.X [2'4[ 35: Zi'E- GEOTECHNICALAND ~ ~ r-~ I I i~z ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 111 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-28-99 ATTN: Mr. John Walsh TECHNICIAN: J. Baradziej CONTRACTOR: Westcliffe, Inc. Location of Sample 1 Paving: 75'S, 150'W of SE Corner of Bldg. "C" 90~500 2 Paving: 50'S, 120'W of SE Corner of Bldg. "C" 170/500 3 Paving: 60'S, 60'W of SE Comer of Bldg. "C" 230/500 4 Paving: 40'S, 20'E of SW Corner of Bldg. "D" 330/500 5 Paving: 70'S, 80'E of SW Comer of Bldg."D' 420/500 Design Information I Lattimore 42 4000 Test Results , 1 9331 11-04-99 7 105330 3730 9331 11-25-99 28 9331 11-25-99 28 9331 Hold 2 9332 11-04-99 7 102230 3620 9332 11-25-99 28 9332 11-25-99 28 9332 Hold 3 9333 11-04-99 7 95440 3380 9333 11-25-99 28 9333 11-25-99 28 9333 Hold 4 9334 11-04-99 7 91370 3230 9334 11-25-99 28 9334 11-25-99 28 9334 Hold 5 9335 11-04-99 7 90800 3210 ~ 9335 11-25-99 28 '" 9335 11-25-99 28 9335 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 ~linder Data 1 9331 5.00 4:15 AM 58 73 4.25 3093960 2 9332 5.00 5:00 AM 58 75 5.0 3093966 3 9333 5.00 5:50 AM 58 75 4.25 3093972 4 9334 5.00 7:00 AM 55 75 4.5 3093983 5 9335 5.00 9:00 AM 63 75 5.0 3094001 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of CoppelllBuilding Inspections (1) City of CoppelllEngineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger