Loading...
Northlake 635(5)-LR 991222WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 12/22/99 85229000 Transwestem Property Company 12221 Merit Drive, g450 Dallas, Texas 75251 Building pad Report No.: Project No.: Project: General Contractor: Injector: 9934217 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Butler Construction Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at thi~ site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Sud~.nt added to each load. X Injection pressure 50 to 200 psi at m~nifol& X Injection downwarc[ in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximnm X In. jection to refi~! at each location. X Comments: South half of pad. Technician: D. phillips T. Smith (1) Transwestem Propmty Company (1) 01~lea & Assoc~es (1) Technistructures, Inc. (1) euUer ConstrucUon Started: 6:30 a.m (1) Cib/of Coppell (1) City of Coppell Stopped: 5:30 p.m_ ~ Eaghaeerh~, Inc. Paul D. Smith, P. E. Senior Project Engineer GOcr This report is exclusively for the use of the client indicated above and shall not bo relxoduc~d in full w#hout written approval of HBC Engineer