Loading...
121 BP Phase 1-LR 991019 GEOTECNNICAL AND ~ F=J r'-i U ~ ENV~P, ONHENTAL CONSULTANTS , REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 82 P.O. Box 802047 REPORT DATE: 10-19-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-21-99 TECHNICIAN: C. Tipps PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Building 2 (751 Canyon Drive): Panels 12, 14 18, 19, 22 21, 23, 25, 26, 28, 29, 31, 32, 34, 36, 35, 1 and 3 I Reference Plans or Notes Used: t Structural drawings. [ List Deviations Noted: I 1) Panel 14:4 # 4 bar missing. 2) Panel 22: 4# 4 bar missing. 3) Panel 32:2 # 5 corner bars at bottom of panel missing. 4) Panel 36:2 # 5 corner bars at bottom of panel missing. The noted deviations were reported to: Superintendent X IThe noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ AE/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ~-424 STUTZ ~R. · Sb -E 430 · ~ALLAS. TX 75235 · TEL ]214] 350 5600 · FAX [214] 350 0019 j GEOTECHNICAL AND J~ I~ rTM LJ ~ ENVIRONMENTAL CONSULTANTS , REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 83 P.O. Box 802047 REPORT DATE: 10-19-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-27-99 TECHNICIAN: B. Ray PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Building 3 (701 Canyon Drive) panels: 1, 2, 4, 5, 6, $, 9, 11, 12, 13, 14, 16, 44, 45, 47, 46, 50, 51, 52, 54, 55, 58 and 59. Reference Plans or Notes Used: I Structural drawings I List Deviations Noted: I Missing slab dowels are scheduled to be placed during concrete placement. X IThe noted deviations are scheduled to be corrected during concrete placement. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ AE/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 S-UTZ DR. · S,;ITE 400 · DAL_AS TX 75235 · -EL '2!4,'. 350 5¢.00 · =AX [214] 350 0019 GEOTECHNICAL AND ! I~ F=I r-1 I I F==- ENVIP, ONMENTAL CONSULTANTS I REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 87 P.O. Box 802047 REPORT DATE: 10-19-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-04-99 TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Fire lane, northside of buildings 3 and 4. Reference Plans or Notes Used: I Civil drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, lNG. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2'~2'~ STJTZ DR. · SUITE '~00 · DALLAS. -X 75235 · TEL [2 4] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND G J==J I--1 I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 88 P.O. Box 802047 REPORT DATE: 10-19-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 10-07-99 TECHNICIAN: E. Rico PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Paving: 60'-140'S and 650'-820'W from NE property corner. J Reference Plans or Notes Used: J Sheet SC-2 J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-~--I STUTZ DP, * SUITE 400 · DA..AS. TX 75235 · TE- [)-14] 350 5600 · FAX ?.14] 350 0019