121 BP Phase 1-LR 991015 GEOTECHN~CAL *h,.~ ~ F=:;I r~ I I p
ENV:RONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 94
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 10-15-99
ATTN: Mr. John Walsh TECHNICIAN: R. Bullion
CONTRACTOR: Westc!iffe. Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Panels #46. 345, #44. Bldg. ~4 10/150
2 Panels #60. #61, #62. Bldg. #4 110/150
Design Information
Source of Concrete ] Mix Identification I Specified Strength p.s.i.
Lattimroe 17 3500
Test Results
Set I CylinderI I Age@ ITotal Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8896 10-22-99 7 107910 3820
8896 11-12-99 28 140390 4970
8896 11-12-99 28 134460 4760 4870
8896 Hold
2 8897 10-22-99 7 98870 3500
8897 11-12-99 28 129070 4570
8897 11-12-99 28 129500 4580 4580
8897 Hold
Cylinder Data
Set I Cylinder I Timeof I Concrete I Air i Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 8896 5.50 10:00 AM 76 83 N/A 078612
2 8897 5.00 12:40 PM 83 83 N/A 093097
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/
Mr. Bennett Foster REED ENGINEERING GROUP, INC.
(1) Westcliffe. Inc./Mr. Charlie Johnson
(1) The Industrial Group/ Original Signed By
Mr. Mac McClure
(1) Campbell Associates/ Keith E. Atkins
Mr. Randy Pliler
(1) City of Coppell/Building Inspections KEA/sa/rt
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2-:24 STLTZ D-~ SU--E 433 · DALLAS -X zE235 · TEL ~214] 3F. 2 5~-~CC * FAX [2"4] 2.=.2 CCi~
GEOTECHNICAL AND ~ ~ r-'l U F~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 93
P.O. Box 802047 REG PROJECT NO. 5607
Dallas. Texas 75380-2047 SAMPLE DATE: 10-15-99
ATTN: Mr. John Welsh TECHNICIAN: R. Bullion
CONTRACTOR: Westcliffe, !nc.
Location of Sample
Set Number I Location I Quantity Represented
1 Bldg. #4 Slab, Gridline B.5 x 14 30/130
2 Bldg. #-4 Slab. Gridline D x 14 110/130
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
Lattimroe 18 4000
Test Results
Set I CylinderI Age~ Total Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8898 10-22-99 7 109610 3880
8898 11-12-99 28 138700 4910
8898 11-12-99 28 136500 4830 4870
8898 Hold
2 8899 10-22-99 7 108810 3850
8899 11-12-99 28 138460 4900
8899 11-12-99 28 143560 5080 4990
8899 Hold
Cylinder Data
setI Cylinder I Tirneo, I Concrete I Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 8898 4.75 7:50 AM 68 77 N/A 685177
2 8899 4.50 8:40 AM 70 80 N/A 685191
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Welsh
(1) Gromatzky Dupree & Associates/
Mr. Bennett Foster REED ENGINEERING GROUP, INC.
(1) Westcliffe. Inc./Mr. Charlie Johnson
(1) The Industrial Group/ Original Signed By
Mr. Mac McClure
(1) Campbell Associates/ Keith E. Atkins
Mr. Randy Pliler
(1) City of Coppell/Building Inspections KEA/sa/rt
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank
2424 S-UTZ DR SLIT;_ z2.2, · DALL-'S TX 75235 · TEL ;21z~ 2~: 5~C,; · PAX [2~4' 3F; CCI?
GECTECHN!CAL -'.NZ, I~ F~ I~3 I I ~
EI~V RONMENTAL CONSL;L~,NTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 94
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 10-15-99
ATTN: Mr. John Walsh TECHNICIAN: R. Bullion
CONTRACTOR: Westc!iffe. !nc.
Location of Sample
Set Number I Location I Quantity Represented
1 Panels #46, 345. #44, Bldg. ¢4 10/150
2 Panels #60, #61. #62, Bldg. #4 110/150
Design Information
I Source of Concrete I Mix Identification Specified Strength p.s.i.
Lattimroe 17 3500
Test Results
Set CylinderI I Age @ I Total Load Compressive I Average Strength
No.. ID DateTested Test lbs. Strength p.s.i, p.s.i.
1 8896 10-22-99 7 107910 3820
8896 11-12-99 28
8896 11-12-99 28
8896 Hold
2 8897 10-22-99 7 98870 3500
8897 11-12-99 28
8897 11-12-99 28
8897 Hold
Cylinder Data
Set Cylinder I Time of I Concrete Air Ticket
No. ID I Slump Sample Air Temp.I Temp. Entrainment Number
1 8896 5.50 10:00 AM 76 83 N/A 078612
2 8897 5.00 12:40 PM 83 83 N/A 093097
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/
REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson
(1) The Industrial Group/ Original Signed By
Mr. Mac McClure
(1) Campbell Associates/ Keith E. Atkins
Mr. Randy Pliler
(1) City of Coppell/Building Inspections KEA/sa
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger ........
GEOTECHNIC~L ANC I~ F:;I r-1 I I F~
ENV'RONMENTAL CONSULT~ I',T$
CONCRETE CYLINDER TEST REPORT
121 Business Park- Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 93
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 10-15-99
ATTN: Mr. John Walsh TECHNICIAN: R. Bullion
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number I Location t Quantity Represented
1 Bldg. #4 Slab. Gridline B.5 x 14 301130
2 Bldg. #4 Slab. Gridline D x 14 110/130
Design Information
i Source of Concrete [ Mix Identification Specified Strength p.s.i.
Lattimroe 18 4000
Test Results
Set CylinderI I Age~ Total Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8898 10-22-99 7 109610 3880
8898 11-12-99 28
8898 11-12-99 28
8898 Hold
2 8899 10-22-99 7 108810 3850
8899 11-12-99 28
8899 11-12-99 28
8899 Hold
Cylinder Data
Set Cylinder I Time of I Concrete I Air i Ticket
No. ID Slump Sample , Air Temp. Temp. Entrainment Number
1 8898 4.75 7:50 AM 68 77 N/A 685177
2 8899 4.50 8:40 AM 70 80 N/A 685191
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/
REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson
(,1) The Industrial Group/ Original Signed By
Mr. Mac McClure
(1) Campbell Associates/ Keith E. Atkins
Mr. Randy Pliler
(1) City of Coppell/Building Inspections KEA/sa
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank ..............
£~_-' S-J:Z DR SUII'E -"::'£ · C-~--~',S TX 752~ · ~£~ i£'4~ $:;.:', ~-~'-2 · :-AX ~2~-:] 353
GEOTECHNICAL AND [~; F::;I I-'1 I I p
ENVIRONMENTAL CONSULTANTSi
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 84
P.O. Box 802047 REPORT DATE: 10-15-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 09-30-99
TECHNICIAN: O. Thornton
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: ] Building 3 (701 Canyon Drive) panels: 16, 17, 19, 20, 21
24, 27, 28, 29, 30, 31,33, 35, 36, 37, 39, 40, 42, 43,
and 44.
Reference Plans or Notes Used: I Structural drawings.
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ AE/je
Mr. Randy Pillar
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2~2-' STJ?Z ~)~,. · SUITE 400 · DALLAS. -X 7.~2,~S · Tr._ [7_14] 359 5600 · FAX Z21~] 3S0 0019