Loading...
121 BP Phase 1-LR 991015 GEOTECHN~CAL *h,.~ ~ F=:;I r~ I I p ENV:RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 94 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-15-99 ATTN: Mr. John Walsh TECHNICIAN: R. Bullion CONTRACTOR: Westc!iffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Panels #46. 345, #44. Bldg. ~4 10/150 2 Panels #60. #61, #62. Bldg. #4 110/150 Design Information Source of Concrete ] Mix Identification I Specified Strength p.s.i. Lattimroe 17 3500 Test Results Set I CylinderI I Age@ ITotal Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8896 10-22-99 7 107910 3820 8896 11-12-99 28 140390 4970 8896 11-12-99 28 134460 4760 4870 8896 Hold 2 8897 10-22-99 7 98870 3500 8897 11-12-99 28 129070 4570 8897 11-12-99 28 129500 4580 4580 8897 Hold Cylinder Data Set I Cylinder I Timeof I Concrete I Air i Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8896 5.50 10:00 AM 76 83 N/A 078612 2 8897 5.00 12:40 PM 83 83 N/A 093097 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe. Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-:24 STLTZ D-~ SU--E 433 · DALLAS -X zE235 · TEL ~214] 3F. 2 5~-~CC * FAX [2"4] 2.=.2 CCi~ GEOTECHNICAL AND ~ ~ r-'l U F~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 93 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 10-15-99 ATTN: Mr. John Welsh TECHNICIAN: R. Bullion CONTRACTOR: Westcliffe, !nc. Location of Sample Set Number I Location I Quantity Represented 1 Bldg. #4 Slab, Gridline B.5 x 14 30/130 2 Bldg. #-4 Slab. Gridline D x 14 110/130 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimroe 18 4000 Test Results Set I CylinderI Age~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8898 10-22-99 7 109610 3880 8898 11-12-99 28 138700 4910 8898 11-12-99 28 136500 4830 4870 8898 Hold 2 8899 10-22-99 7 108810 3850 8899 11-12-99 28 138460 4900 8899 11-12-99 28 143560 5080 4990 8899 Hold Cylinder Data setI Cylinder I Tirneo, I Concrete I Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8898 4.75 7:50 AM 68 77 N/A 685177 2 8899 4.50 8:40 AM 70 80 N/A 685191 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Welsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe. Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank 2424 S-UTZ DR SLIT;_ z2.2, · DALL-'S TX 75235 · TEL ;21z~ 2~: 5~C,; · PAX [2~4' 3F; CCI? GECTECHN!CAL -'.NZ, I~ F~ I~3 I I ~ EI~V RONMENTAL CONSL;L~,NTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 94 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-15-99 ATTN: Mr. John Walsh TECHNICIAN: R. Bullion CONTRACTOR: Westc!iffe. !nc. Location of Sample Set Number I Location I Quantity Represented 1 Panels #46, 345. #44, Bldg. ¢4 10/150 2 Panels #60, #61. #62, Bldg. #4 110/150 Design Information I Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimroe 17 3500 Test Results Set CylinderI I Age @ I Total Load Compressive I Average Strength No.. ID DateTested Test lbs. Strength p.s.i, p.s.i. 1 8896 10-22-99 7 107910 3820 8896 11-12-99 28 8896 11-12-99 28 8896 Hold 2 8897 10-22-99 7 98870 3500 8897 11-12-99 28 8897 11-12-99 28 8897 Hold Cylinder Data Set Cylinder I Time of I Concrete Air Ticket No. ID I Slump Sample Air Temp.I Temp. Entrainment Number 1 8896 5.50 10:00 AM 76 83 N/A 078612 2 8897 5.00 12:40 PM 83 83 N/A 093097 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ........ GEOTECHNIC~L ANC I~ F:;I r-1 I I F~ ENV'RONMENTAL CONSULT~ I',T$ CONCRETE CYLINDER TEST REPORT 121 Business Park- Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 93 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-15-99 ATTN: Mr. John Walsh TECHNICIAN: R. Bullion CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location t Quantity Represented 1 Bldg. #4 Slab. Gridline B.5 x 14 301130 2 Bldg. #4 Slab. Gridline D x 14 110/130 Design Information i Source of Concrete [ Mix Identification Specified Strength p.s.i. Lattimroe 18 4000 Test Results Set CylinderI I Age~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8898 10-22-99 7 109610 3880 8898 11-12-99 28 8898 11-12-99 28 8898 Hold 2 8899 10-22-99 7 108810 3850 8899 11-12-99 28 8899 11-12-99 28 8899 Hold Cylinder Data Set Cylinder I Time of I Concrete I Air i Ticket No. ID Slump Sample , Air Temp. Temp. Entrainment Number 1 8898 4.75 7:50 AM 68 77 N/A 685177 2 8899 4.50 8:40 AM 70 80 N/A 685191 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson (,1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank .............. £~_-' S-J:Z DR SUII'E -"::'£ · C-~--~',S TX 752~ · ~£~ i£'4~ $:;.:', ~-~'-2 · :-AX ~2~-:] 353 GEOTECHNICAL AND [~; F::;I I-'1 I I p ENVIRONMENTAL CONSULTANTSi REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 84 P.O. Box 802047 REPORT DATE: 10-15-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-30-99 TECHNICIAN: O. Thornton PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: ] Building 3 (701 Canyon Drive) panels: 16, 17, 19, 20, 21 24, 27, 28, 29, 30, 31,33, 35, 36, 37, 39, 40, 42, 43, and 44. Reference Plans or Notes Used: I Structural drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ AE/je Mr. Randy Pillar (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2~2-' STJ?Z ~)~,. · SUITE 400 · DALLAS. -X 7.~2,~S · Tr._ [7_14] 359 5600 · FAX Z21~] 3S0 0019