Loading...
Northlake 635(5)-LR000103/iRHI ORT OF CONCRI i --]%- vSTRENGTH VALIf ION 8901 Carpent~ Frwy., Suitz #1~ Date of Service: 01/03/2001 Report No.: 0019415F Report Date 01/03/2001 Client No.: 85229000 949914~ Client: Transwestem Property Company Atto: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell Commerce 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Review the concrete compressive strength test compliance with project plans and specifications. ~termine overall FINDINGS After reviewing the Concrete Compressive Strength Statistical Analysis for the concrete placed in this project, it is oU~ ~iOn that s&id co~rete did~eet or exceed the required compressive strength whenevaluated in accordance with project specifications and ACI 318. Technician: Eugene Harbour Report Distribution: (1) Transwcstcrn Prope~y Company (1) O'Sriea a Associates ( 1 ) Techaistngam~, ~ac. (1) Butler Coas~ction (1) City of Coppell (1) City of Copper Vice President 9~S This report is exclusively for the use of the client indicated abOve and shall not be reproduced except in full without the written approval of HBC l~necsing, Inc. Pa~e 1 of I WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 01/03/00 85229000 Transwestern Property Company 12221 Merit Drive, ~/450 Dallas, Texas 75251 Report No.: Project No.: Project: Building pad General Contactor: ~ Injector: 0001087 9499145'/ Coppell Commerce Center 1234 Lakeahore (Bldg. B) Coppelk Texas Buffer Construction Procedure: On this date, a representative ofHBC En~eering, Inc. observed the injection ofwater at th;~ site. During the injection process, the following observations were recorded~ Pass No.: 6th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No NIA Su_~_,mt added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downw~d in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maxim.m_ X InjeOi_'on to re6~l at each loc~_t_ion. X Comments: South half of pad. Technician: D. Phillips T. Smith (1) Tmmn~m Property Company (1) O'Brien & Associates (1) Tectmistrucbxes, Inc. (1) SuUer coflstmct~ mm,a: See Report/~0001066 (1) c~y of copp~i O) cib, of cop~, Engineering, Inc. Paul D. Smith, P. E. 9edp This report is exclusively for the use of the client indicated above and shall not be reproduced in full without v~itten apjxo~l of HBC Englnoedng, WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 01/03/00 85229000 Transwestem Property Company 12221 Merit Drive, fi450 Dallas, Texas 75251 Building pad Report No.: Project No,: Project: General Contactor: Injector: OO01066 94991457 Copper Conmunce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Butler Construction Procedure: On this date, a representative of HBC Engineering, Inc. observed the injextion of water at this site. During the injection process, the following observations were recorde& Pass No.: 5th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No N/A Surfa_~_.-t added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X SpaclnE of injection was 5 feet msxlmnm X Inj~tio~ to refi!~ql at each loc~_fion. X Comments: South half ofpad. Technician: D. Phi!lys T. Smith Report omflbmlom (1) Tmnswestmn Property Company (1) O'Brlen & Associates (1) Technistructures, Inc. (1) Butler Constructi~ s~med: 7:00 a.m (1) City of Coppall (1) Cry of Coppe~ stopp~: 5:30 p.m Paul D. Smith, P. E. s~aior ~ ~r gl;adp Thie report ie e~clusively for the use of the client indicated above and shall not bo reproduced in full vdllmut v~tten aplxoval ef I'IBC Engineering, Inc. IN-PLACE DENSITY )STING Date of Service: 12/21/1999 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: Project No.: I i 9934107 94991457 8901 Carpenter lrrwy., SuRe #100 DaRes, T~zaa 7~a47 iii Report Date 01/03/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description PROJECT DATA Laboratory Test Method: ASTM D-698 Moisture % I Lt brown and tan shaley clay 22.0 Maximum Density pef 98.5 Field Test Method: ASTM D2922 ASTM D3017 Prelect Requireramtts Moisture Density -1/+3% 95% FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE LIFT/ M/D DEPTH ELEV No. MOISTURE DRY DENSITY DENSITY (%) (P~0 (% max) Storm Sewer, Line A I Station 10+50 2 Station 10+50 3 Station 10+50 4 Station 8+00 5 Station 8+00 6 Station 8+00 1st 1 22.8 93.8 95 2nd 1 23.0 94.6 96 3rd 1 23.3 93.7 95 1st 1 23.0 93.0 94 2nd 1 22.8 93.4 95 3rd l 22.5 93.7 95 Test results on this report meet project specification. Technician: Roy Montgomery Report Distribution: (1) Transwestem Property Company (I) O'Brien & Associates (I) Technistmctures, Inc. (I) Butler Construction Started: 1:309 (i) City of Copp~H ( I ) City of Coppcll Finished: 3:00p Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval ofHBC Engincerin$, Inc. 07SDS Page I of I