Loading...
Northlake 635(5)-LR000828CONCRETE COMPRE IVE STRENGTH Date of Service: 07/26/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0019415 Project No.: 94991457 ReImrt Date 08/2812000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples 'of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CO~rRACTOm Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA M~X ~.: 9351 PLACEMENT DATE: 07126/2000 BATCH TIME: 5:50am TIME SAMPLED: 6:40am sY: Greg Dimock WEATHER COIVOmoNs: TEMPERATURE (F) - AIR TRUCK~O: 1031 Am co~_.t~rr (,~): 4.3 Clear 79 F CONC~r~: 88 TIc~'r NO: 650776 UNIT WEIGffr (l~f): N/A PLACEMENT LOCATION: Sidewalks- W, N and E side of building A Sampled from Iruck. SAMPLE LOCATION: 100' N of SW corner of bldg. A REPORT OF TESTS ACCUMULATIV~ YARl~: 10 CYLINDER MARKED SET NO. 1 1 I 2 1 3 I 4 MEASURED MAXIMUM SLUMP DATE AGE LOAD (Inches) TESTED (days) Obs. for~) 6.25 08/02/2000 7 89770 6.25 08/02/2000 7 90740 Average 6.25 08/23/2000 28 118630 6.25 08/23/2000 28 122400 Average COMPRESSIVE STRENGTH 3170 3210 3190 4200 4330 4270 TYPE Teclmkian: Greg Dimock Report Dim-ibution: (1) Transwestern Property Compauy (1) O'Bdeu & Associates (I) T~:hn~tures, (1) Butl~ C~ou Started: 5:00am (1) City of Coppeil (I) City of Coppell Finished: 10:30am Vice President This report is exclusively for the use of rite client indicated above and sh~ll not be reproduced except in full without the wfit2n ~ of HBC Engineering. Inc. 0ILL Page I of 1