Loading...
Northlake 635(5)-LR000814' CONCRETE COMPI SIVE STRENGTH 8901 Carpente~ Fr~., Suite #10 Date of Service: 07/13/2000 Client No.: 85229000 Report No.: 0018260 Project No.: 94991457 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 08114/2000 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CO~.ACrOlC' Butler Construction CONCRETE SUPPLIER: Pioneer pLANT: 29 SPECIFICATION REQUIREMENTS STRENaT~: 4000 psi @ 28 Days 5.0" max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MlX LD.: 9351 PLACEMENT DATE: 07/1312000 BATCH TErm: 4:00am TIME SAMPLED: 4':45am BY: Greg Dimock WEATHER CONOmONS: TEMPERATURE (F). AIR TRUCK NO: 103 AIR CONTENT (%): 4.1 PLACEMENT LOCATION: Clear 85 l~ CO~CR~-TE: 94 F TICKET ~o: 612070 u~rrr WEmtrr (pc0: N/A Paving- Building B loading dock area- Pour g2 Sampled from pump. REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. Cmehes) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.75 07/20/2000 7 85300 3020 1 2 5.75 07/20/2000 7 90110 3190 Average 3110 I 3 5.75 08/10/2000 28 111460 3940 I 4 5.75 08/10/2000 28 120090 4250 Average 4100 Sample location: 5' West of E joint and 10' N of N wall, south wing of building 0ILL This report is exclusively for the use oft. he client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. Page I of 4 CONCRETE COMP SSIVE STRENGTH a division of'l~arr~::m 8901 Carpenter grwy., Suite #10 Date of Service: 07/13/2000 '- Client No.: 85229000 Report No.: 0018260 Project No.: 94991457 Report Date 08/14/2000 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: COh~RnCTOR: Butler Construction CONCRETE SUPPLIER: Pioneer P~Wn 29 SPECIFICATION REQUIREMENTS STRESGTH: 4000 psi @ 28 Days 5.0" max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX LD.: 9351 PLaCEMeNT OATE: 0711312000 BATCH Tn~m: 5:25am TIME SAMPLED: 6!20am BY: G-reg Dimock WEA~R CONOrrIONS: Clear TEMPERATURE (F). Am 85 F CONCRETE: 93 TRUCK NO: 725 TICrm'r NO: 612078 AIR CONTENT (%): 4.4 utvrr WEIGltT {i~): N/A PLACEMENT LOCATION: Seepage ! Sampled from pump. REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (taches) TESTED (days) Obs. force) (p~i) 2 1 5.50 07/20/2000 7 91910 3250 2 2 5.50 07/20/2000 7 96180 3400 Average 3330 2 3 5.50 08/10/2000 28 112430 3980 2 4 5.50 08/10/2000 28 117170 4140 Average 4060 Sample location: 20' W of E joint and 40' N of N wall, south wing of building T~PE 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac. Page 2 of 4 CONCRETE COMPI SIVE STRENGTH TI T ENC~q~I~,II~ a diWs~on of ~ 8901 Carpent~- Frwy., Suite #10 Date of Service: 07/13/2000 Client No,: 85229000 Report No.: Project No.: 0018260 94991457 Report Date 08/1412000 Client: Transwestem Property Company Project: Attn: James Oaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) COppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer Pcnwr: 29 SPECIFICATION REQUIREMENTS s'r~N~;TH: 4000 psi @ 28 Days 5.0" max 3-5% ASTM C- 143 ASTM C- 172 ASTM C-39 SAMELE LOCATION: See below PROJECT DATA MIX£D.: 9351 PLACEMENT DATE: 07113/2000 BATCH TE~m: 7:05am TIME SAMPLED: 8:00am BY: GregDimock Sampled from pump. REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUM~ DATE AGE LOAD STRENGTH FRACTURE SET NO. (aw. hca) TESTED (days) 01~ force) (~l) TYPE 3 I 5.25 07/20/2000 7 93990 3320 3 2 5.25 07/20/2000 7 92880 3280 Average 3300 3 3 5.25 08/10/2000 28 124730 4410 3 4 5.25 08/10/2000 28 127190 4500 Average 4460 Sample location: 65' North of N wall, south wing and 40' W of E joint 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 4 CONCRETE COMPI SSIVE STRENGTH a ~vu~ of'l~r~:m 8901 Carlmaer ltr~., ~ #1~ Date of Service: 07/13/2000 Client No.: 85229000 Report No.: Project No.: 0018260 94991457 Report Date 08/14f2000 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, 0450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLAbrr: 29 Sr~cnqc~T~ON REQUn~MEWrs SXm~G~: 4000 psi @ 28 Days 5.0" max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA M~X I~O,: 9351 PLACEMENT DATE: 0711312000 BATCH TIME: 7:50am TIME SAMPLED: 9:00am BY: Cneg Dimock WEATHERCON~moNs: Clear TEMPERATURE (F)- AIR 85 r CONCRETE: 93 r TRUCK NO: 33 TICKer NO: 649905 AIR CONTENT (%): 3.8 u~rr w~iGrrr 0m'): N/A PLACEMENT LOCATION: Sampled from pump. REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MARKED SET NO. MEASURED MAXIMUM COMP~IVE SLUMP DATE AGE LOAD STRENGTII (iadm) Tr_~rgD (~y~) 0~ force) (mi) 4 1 6.00 07/20/2000 7 92920 3290 4 2 6.00 07/20/2000 7 97040 3430 Average 3360 4 3 6.00 08/10/2000 28 118930 4210 4 4 6.00 08/10/2000 28 114350 4040 Average 4130 Sample location: 35' S of S wall, north wing, 40' W of E joint Technician: Greg Dimock Report Distribution: (1) Transwestem Prope~ Company (1) O'Brien & Associatc~ (l) Technistructurcs, Inc. Started: 3:00am (1) City of Coppell (1) City of Coppell F'mmhed: 10:30am ~ Engineeri Eugene Harbour Vice President (I) Butler Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writlen approval of HBC Eagineering, Inc. OILL Page 4 of 4