Loading...
Northlake 635(5)-LR000804CONCRETE COMPRE ' IVE STRENGTH TES ) 8901 Carpenter Frwy~ Suite #100 Dallm, Texas 75247 Date of Service: Client No.: Client: 07/06/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0017568 Project No.: 94991457 Report Date 08/04/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUM~: AIR: TEST METHOD: CO~O~.t, CrOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: · See below PROJECT DATA MIX LD.: 9351 PLACEMENT DATE: TIME SAMPLED: 5:45am WEATHER CONDITIONS: TEMPERATURE (F). AiR TRUCKNO: 118 AiR CONTF. aNT (%): 4.6 07/06/2000 BATCH Tram: N/A BY: Greg Dimock Clear 78 r CONCRETE: 86 r · rlcm~TNo: 611645 VNn' WEKmT (pc0: N/A PLACEMENT LOCATION: Paving-Building "B" track dock loading area- first pour of two (See attached sketch) Sampled from truck. REPORT OF TESTS ACCUMULATIVE YARD~: 10 CYLINDER MARKED SET NO. MAXIMUM COMPRF~SIVE MEASURED SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.00 07/13/2000 7 106800 3780 1 2 6.00 07/13/2000 7 100300 3550 Average 3670 I 3 6.00 08/03/2000 28 128900 4560 1 4 6.00 08/03/2000 28 128620 4550 Average 4560 Sample location: 5' West of E joint & 10' N of S wing, N wall 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except tn full wtthout the written approval of HBC Engmeen'nL~~ Page 1 of 4 CONCRETE COMPRE IVE STRENGTH TES 8~1 C~enter irr~ Suite #1~ ~ Toots 75~,47 Date of Service: 07/06/2000 Report No.: 0017568 Client No.: 85229000 Project No.: 94991457 Client: Transwestem Property Company Atto: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report Date 08/04/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of flesh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTP~CTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA MiX ED.: 9351 PLACEMENT DATE: TIME SAMPLED: 6:20am WEATHER CONDITIONS: TEMPERATURE (F)- Am TRUCKNO: 1880 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: See page 1 07/06/2000 BATCH TIME: 5:45am BY: Oreg Dimock Clear 78 ir CONCRETE: 87 ir TICrmT NO: 611651 uto'r w~mirr (oeO: N/A Sampled from ffuck. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MEASURED MARKED SLUMP SET NO. (inchts) 2 1 5.75 2 2 5.75 2 3 5.75 2 4 5.75 Sample location: 30' DATE TESTED MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) 0b~ force) (l~i) 07/13/2000 7 07/13/2000 7 08/03/2000 28 08/03/2000 28 W of E joint and 30' N of N wall, 114500 110690 Average 115120 116470 Average S wing 4050 3910 3980 4070 4120 4100 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 4 CONCRETE COMPRE IVE STRENGTH TEb 8901 Carpenter Fr~. Suite #100 ~ T~as 75247 Date of Service: 07/06/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0017568 Project No.: 94991457 Report Date 08104/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: cowr~,CTOR: Butler Construction CONCRETE SUPPLIER: Pioneer pLAWr: 29 SPECIYICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA M~X I~).: 9351 PLACEMENT DATE: TIME SAMPLED: 7:20am WEATHER CONDrrlONS: TEMPERATURE (F) - AIR TRUCK NO: 37 AIR CON'I~ (%): 4.6 PLACEMENT LOCATION: See page I 07/06/2000 BATCH TIME: 6:35am BY: Greg Dimock Clear 80 F CONCRETe: 88 v TIC~T NO: 611659 trsrr w~mnT (tm'J: N/A Sampled from truck. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 6.25 3 2 6.25 3 3 6.25 3 4 6.25 Sample location: 50' N DATE TESTED MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) Obs. force) (psi) 07/13/2000 7 07/13/2000 7 08103/2000 28 08/0312000 28 of N wall & 50' W of E joint 99820 94690 Average 115890 117320 Average 3530 3350 3440 4100 4150 4130 TYPE 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 4 CONCRETE COMPRE IVE STRENGTH TES a divirlon of l~iV'dl~l~ll 8901 Carpenter Frwy., Suite #100 Dall~ Trams 7S247 Date of Service: 07/06/2000 Report No.: 0017568 Client No.: 85229000 Project No.: 94991457 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report Date 08/04f2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA lmXl.O.: 9351 PLACEMENT DATE: 07/06/2000 BATCH TIM~: 7:52am TIME SAMPLED: 8:30am aY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 42 AIR CONTENT (%): 4.8 PLACEMENT LOCATION: See page 1 Clear 82 r CONCRETE: 88 TICKET NO: 509739 tusrr w~lorrr (pc0: N/A Sampled from truck. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 4 1 6.25 4 2 6.25 MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 07/13/2000 7 100990 07/13/2000 7 105390 Average COMPRESSIVE STRENGTH 3570 3730 3650 FRACTURE 4 3 6.25 4 4 6.25 08/03/2000 28 125800 08/03/2000 28 128910 Average 4450 4560 4510 Sample location: 30' S of Technician: Greg Dimock Report Distribution: (1) Trauswcsteru Property C. xaupauy (1) O'Brien & Associates (I) Technistructures, Inc. S wall, N wing & 50' W of E joint Started: 3:00am (1) City of Coppell (1) City of Coppell Finished: lO:OOam I-~ Engineer' ,~I~ Eugene l~/arbour Vice President (1) Butler Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Eugim~ing, Inc. 0ILL Page 4 of 4