Northlake 635(5)-LR000803CONCRETE COMPRE IVE STRENGTH TES
8901 Carpenter Frwy., Suite #100
Dallm, Texas 75247
Date of Service:
Client No.:
Client:
07/26/2000
85229000
Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, 0450
Dallas TX 75251
Report No.: 0019415
Project No.: 94991457
Report Date
08/03/2000
Project:
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
STRENGTH:
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 22
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
MIX LD.: 9351
PLACEMENT DATE: 07/2612000 BATCH X~,~: 5:50am
TIMESAlVlPLED: 6:40am BY: Greg Dimock
WEATHER CONDITIONS:
TE_MPERATURE (F) - AIR
TRUCK NO: 1031
AIR CONTENT (%): 4.3
Clear
79 F CONCRETE: 88
TICKET NO: 650776
tmrr WEialrr (~a~: N/A
PLACEMENT LOCATION:
Sidewalks- W, N and E side of building A
Sampled from truck.
SAMPLE LOCATION:
100'N of SW comer of bldg. A
REPORT OF TESTS
ACCUI'~~YARI~: 10
CYLINDER
MARKED
NO.
1
2
1 3
I 4
MEASURED MAXIMUM
SLUMP DATE AGE LOAD
(inches) TESTED (days) 0be- force)
6.25 08/02/2000 7 89770
6.25 08/02/2000 7 90740
Average
6.25 08/2312000 28
6.25 08/2312000 28
COMP~lVE
STRENGTH
3170
3210
3190
Technician: Greg Dimock
Report Distribution:
(1) Transwestem Property Company
(!) O'Brien & Associates
(1) Tochnistrnctures, Inc.
(1) Buffer Construction
Started: 5:00am
(1) City of Coppell
(1) City of Coppcll
Finished: 10:30am
I-~ Engin~ ,~Jne~
Eugene Harbour
Vice President
This rcl~rt is exclusively for thc usc of the client indicated above and shall not be rcprodnccd except in full without thc written approval of HBC Engineering, Inc.
0ILL Page I of I