Loading...
Northlake 635(5)-LR000724CONCRETE COMPRE IVE STRENGTH TES ENG--, II~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 752A7 Date of Service: 07/13/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0018260 Project No.: 94991457 Report Date 07/24/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" max 3-5% ASTM C- !43 ASTM C-172 ASTM C-39 PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/13/2000 nATCH T~ME: 4:00am TIME SAMPLED: 4:45am nY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUCK NO: 103 AIR CONTENT (%): 4.1 Clear 85 F CONCRETV-: 94 F TICKET NO: 612070 UNIT WEIGHT (peO: N/A PLACEMENT LOCATION: Paving- Building B loading dock area- Pour #2 Sampled from pump. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0b~ force) (psi) TYPE 1 1 5.75 07/20/2000 7 85300 3020 ! 2 5.75 07/20/2000 7 90110 3190 Average 3110 1 3 5.75 08/10/2000 28 I 4 5.75 08/10/2000 28 Sample location: 5' West of E joint and 10' N of N wall, south wing of building 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 1 of 4 CONCRETE COMPR IVE STRENGTH TES a division of'lfntt-~nn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/13/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0018260 Project No.: 94991457 Report Date 07/24/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 5.0" max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA MIX I.D.: 9351 PLACEMENT DATE: 07/13/2000 BATCHTIME: 5:25am TIME SAMPLED: 6:20am BY: Greg Dimock WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 85 F CONCRETE: 93 TRUCK NO: 725 TICKET NO: 612078 AIR CONTENT (%): 4.4 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: See page I Sampled from pump. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. foree) (pal) 2 1 5.50 07/20/2000 7 91910 3250 2 2 5.50 07/20/2000 7 96180 3400 Average 3330 2 3 5.50 08/10/2000 28 2 4 5.50 08/10/2000 28 Sample location: 20' W of E joint and 40' N of N wall, south wing of building FRACTURE TYPE 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 2 of 4 CONCRETE COMPRI IVE STRENGTH TES Date of Service: 07/13/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0018260 Project No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas a division of'lfnwamn 8901 Carpenter Frwy., Suite #1~0 Dallas, Texas 75547 Report Date 07/24/2000 Services: SLUMP: AIR: TEST METHOD: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. Butler Construction Pioneer 29 CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA MLX I.D.: 9351 PLACEMENT DATE: 07/13/2000 BATCH TIME: 7:05am TIME SAMPLED: 8:00am BY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 652 AIR CONTENT (%): 4.5 PLACEMENT LOCATION: See page I Clear 83 F CONCRETE: 97 F TICKETNO: 612091 UNIT WEIGHT (pc0: N/A Sampled from pump. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (lbs. force) (l~i) ~ 3 1 5.25 07/20/2000 7 93990 3320 3 2 5.25 07/20/2000 7 92880 3280 Average 3300 3 3 5.25 08/10/2000 28 3 4 5.25 08/10/2000 28 Sample location: 65' North of N wall, south wing and 40' W of E joint 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page 3 of 4 CONCRETE COMPR IVE STRENGTH TES( ENGINEERI~, INC. a division of 'lfetraz:tm 8901 Carpenter Frwy., Suite #100 Report Date Date of Service: 07/13/2000 Report No.: 0018260 07/24/2000 Client No.: 85229000 Project No.: 94991457 Client: Transwestern Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT-DATA MIX ~.O.: 9351 PLACEMENT DATE: 07/13/2000 BATCH T~ME: 7:50am TIME SAMPLED: 9:00am BY: Greg Dimock WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 33 AIR CONTENT (%): 3.8 PLACEMENT LOCATION: See page 1 Clear 85 F CONCRETE: 93 F TICKET NO: 649905 UNIT WEIGHT (pet3: N/A Sampled from pump. REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. (inches) TESTED (days) ~ far~) 4 1 6.00 07/20/2000 7 92920 4 2 6.00 07/20/2000 7 97040 Average COMPRESSIVE STRENGTH 3290 3430 3360 4 3 6.00 08/10/2000 28 4 4 6.00 08/10/2000 28 Sample location: 35' S of S wall, north wing, 40' W of E joint Technician: Greg Dimock Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technisiructures, Inc. (1) Butler Construction Started: 3:00am (l) City of Coppell (1) City of Coppeil Finished: 10:30am I-nC Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4