Northlake 635(5)-LR000714 ONCRETE COMPRE IVE STRENGTH TES
Date of Service:
Client No.:
Client:
07/0612000
85229000
Transwestern Property Company
Attn: lames Gaspard
12221 Merit Drive, ~450
Dallas TX 75251
Report No.: 0017568
Project No.: 94991457
a dMs~on of~
8901 C_,m'pe~m~r grwy., Suite
, , ~ T~m~ 7~4.7
Report Date
07114/2000
Project: Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION REQUIREMENTS
STRE~.'I~: 4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C- 172
ASTM C-39
PROJECT DATA
M~X LD.: 9351
PLACEMENT DATE:
TIME SAMPLED: 5:45am
WEATHER CONDITIONS:
TF, MPERATURE (F) - AIR
TRUCKNO: 118
AIR CONTF2qT (%): 4.6
0710612000 BATCH TIME: N/A
BY: Greg Dimock
Clear
78 F CONCRrrE: 86 V
TICKer NO: 611645
unTr w~rr (~0: N/A
PLACEMENT LOCATION:
Paving-Building "B" truck dock loading area- first pour of two
Sampled from truck.
SAMPLE LOCATION:
See below
REPORT OF TESTS
ACCUMULATIV~ YARDS: 10
CYLINDER MEASURED
M/~Pdr~D SLUMP
SET NO. (inches)
1 1 6.00
1 2 6.00
MAXIMUM COMERF..SSIVE
DATE AGE LOAD STRENGTH FRACTURE
TESTED (days) Obs. r(a, ce) (pi) TYPE
0711312000 7 106800 3780
0711312000 7 100300 3550
Average 3670
I 3 6.00 08103/2000 28
1 4 6.00 08/03/2000 28
Sample location: 5'
sketch).
West of E joint & 10' N of S wing, N wall, (See attached
OILL
This rep°fl is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~n ~oval of HBC EngJueering, Inc.
Page I of 4
CONCRETE COMPRE IVE STRENGTH TES
8901 Caqmaer Fr~., Saite #lO0
Date of Service:
Client No.:
07/06/2000
85229000
Report No.: 0017568
Project No,: 94991457
Client: Transwestern Property Company project:
Attn: James Gaspard
12221 Merit Drive, 0450
Dallas TX 75251
Services:
Report Date
07/14/2000
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION REQUIREMENTS
SXR~_~(~a'~: 4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
MiX la).: 9351
PLACEMENT DATE: 07106/2000 RAxctl Tnvm: 5:45am
TIME SAMPLED: 6:20am BY: Greg Dimock
WEATIt~R CONnlTIONS:
TEMPERATURE (F) - AIR
TRUCK NO: 1880
AIR COmY_.NT (%): 4.5
PLACEMENT LOCATION:
Clear
78 F concr~'r~: 87 F
TIc~m"r NO: 611651
trnrr w~mtrr Cma'): N/A
Sampled from uuck.
REPORT OF TESTS
ACCUMULATIVEYARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRKIqGTlt FRACTURE
SET NO. (inches) TESTED (days) ~ f~ree) (IM) TYPE
2 1 5.75 07/13/2000 7 114500 4050
2 2 5.75 07/13/2000 7 110690 3910
Avernge 3980
2 3 5.75 08/0312000 28
2 4 5.75 08/03/2000 28
Sample location: 30' W of E joint and 30' N of N wall, S wing
0ILL
This report is exclusively for the use of the client indicated above and shall no~ be ~produced except in full without Ih~ writlen al~ of HBC F..n~ng, inc.
Pa~e 2 o~ 4
CONCRETE COMPR IVE STRENGTH
Date of Service: 07106/2000 Report No.: 0017568
Client No.: 85229000 Project No.: 94991457
Client:
Services:
Report Date
07114/2000
Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Project:
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
co~raAcroa: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION m~QUIm~MvNrs
SXRENCT~: 4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
PROJECT DATA
MIX ID.: 9351
PLACEMENT DATE: 07106/2000 SATCH T~E: 6:35am
TIME SAMPLED: 7:20am aY: Greg Dimock
WEATIIER CONDmONS:
TEMPERATURE (F). Am
TRUCK NO: 37
Am CONTENT (~): 4.6
PLACEMENT LOCATION:
Clear
80 F coNca~m: 88
~cr~-r No: 611659
· UNiT w~mirr (~t): N/A
Sampled from truck.
REPORT OF TESTS
ACCUM~JI~TIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COM~
MARKED SLUMP DATE AGE LOAD b~E2~'TH FRACTUR~
SET NO. (incl.) TESTED (d~y~) 01~. forum) (l~i) TYPE
3 1 6.25 07113/2000 7 99820 3530
3 2 6.25 07/13/2000 7 94690 3350
Average 3440
3 3 6.25 0810312000 28
3 4 6.25 08/03/2000 28
Sample location: 50' N of N wall & 50' W of E joint
0ILL
This r~port is exclusively for the usc of the client indicated above and shall not bc re~ except in full wilhout thc writ~u q~oval of HBC Patgine~ng, Inc.
Page3 of 4
CONCRETE COMPRI IVE STRENGTH TES
8901 Carpenter Frwy., Suite
T~ 7~A7
Date of Service:
Client No.:
07/06/2000
85229000
Report No.: 0017568
Project No.: 94991457
Report Date
07/14/2000
Client:
Transwestem Property Company
Atto: James Gaspard
12221 Merit Drive,//450
Dallas TX 75251
Project: Coppell Commerce Center
1234 Lakeshore (Bldg. B)
' CoppelL Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:
AIR:
TF_~T METHOD:
CONTRACTOR: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLANT: 29
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi @ 28 Days
5.0" Max
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
See below
PROJECT DATA
MLX LO.: 9351
PLACEMENT DATE: 07/06/2000 BATCH TIME: 7:52am
TIME SAMPLED: 8:30am Bt': Greg Dimock
W~R co~mo~: Clear
TEMPERA~RE (!~- Am 82 F CONCRETE: 88 F
TRVCKNO: 42 TIc~"r NO: _ 509739
AIR CONTENT (%): 4.8 u~rr WEIGHT (pc0: N/A '
PLACEMENT LOCATION:
See page 1
Sampled from truck.
REPORT OF TESTS
ACCUMULk~ YARDS: 10
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 1 6.25 '07/13/2000
4 2 6.25 07/13/2000
AGE LOAD. STRENGTH
(days) Obs. torte)
7 100990 3570
7 105390 3730
Avernge 3650
4 3 6.25 08/03/2000 28
4 4 6.25 08/03/2000 28
Sample location: 30' S of S wall, N wing & 50' W of E joint
Technician: Greg Dimock
Report Distribution:
(!) Transwestem Profeny Company
(1) O'Brien & Associates
( I ) Technistructure$, Inc.
(D Butler Omstmaioa
Staffed: 3:00am
(1) City of Cop~ll
O) City of Coop~n
Finished: lO:OOam
Vice President
This report is exclusively for Ihe use of the client indicated above and shall not be reproduced except in full without tie eiten q~pmval of HBC Engineering, Inc.
0ILL
Page 4 of 4