Loading...
Northlake 635(5)-LR000714 ONCRETE COMPRE IVE STRENGTH TES Date of Service: Client No.: Client: 07/0612000 85229000 Transwestern Property Company Attn: lames Gaspard 12221 Merit Drive, ~450 Dallas TX 75251 Report No.: 0017568 Project No.: 94991457 a dMs~on of~ 8901 C_,m'pe~m~r grwy., Suite , , ~ T~m~ 7~4.7 Report Date 07114/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRE~.'I~: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 PROJECT DATA M~X LD.: 9351 PLACEMENT DATE: TIME SAMPLED: 5:45am WEATHER CONDITIONS: TF, MPERATURE (F) - AIR TRUCKNO: 118 AIR CONTF2qT (%): 4.6 0710612000 BATCH TIME: N/A BY: Greg Dimock Clear 78 F CONCRrrE: 86 V TICKer NO: 611645 unTr w~rr (~0: N/A PLACEMENT LOCATION: Paving-Building "B" truck dock loading area- first pour of two Sampled from truck. SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIV~ YARDS: 10 CYLINDER MEASURED M/~Pdr~D SLUMP SET NO. (inches) 1 1 6.00 1 2 6.00 MAXIMUM COMERF..SSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) Obs. r(a, ce) (pi) TYPE 0711312000 7 106800 3780 0711312000 7 100300 3550 Average 3670 I 3 6.00 08103/2000 28 1 4 6.00 08/03/2000 28 Sample location: 5' sketch). West of E joint & 10' N of S wing, N wall, (See attached OILL This rep°fl is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~n ~oval of HBC EngJueering, Inc. Page I of 4 CONCRETE COMPRE IVE STRENGTH TES 8901 Caqmaer Fr~., Saite #lO0 Date of Service: Client No.: 07/06/2000 85229000 Report No.: 0017568 Project No,: 94991457 Client: Transwestern Property Company project: Attn: James Gaspard 12221 Merit Drive, 0450 Dallas TX 75251 Services: Report Date 07/14/2000 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS SXR~_~(~a'~: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MiX la).: 9351 PLACEMENT DATE: 07106/2000 RAxctl Tnvm: 5:45am TIME SAMPLED: 6:20am BY: Greg Dimock WEATIt~R CONnlTIONS: TEMPERATURE (F) - AIR TRUCK NO: 1880 AIR COmY_.NT (%): 4.5 PLACEMENT LOCATION: Clear 78 F concr~'r~: 87 F TIc~m"r NO: 611651 trnrr w~mtrr Cma'): N/A Sampled from uuck. REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRKIqGTlt FRACTURE SET NO. (inches) TESTED (days) ~ f~ree) (IM) TYPE 2 1 5.75 07/13/2000 7 114500 4050 2 2 5.75 07/13/2000 7 110690 3910 Avernge 3980 2 3 5.75 08/0312000 28 2 4 5.75 08/03/2000 28 Sample location: 30' W of E joint and 30' N of N wall, S wing 0ILL This report is exclusively for the use of the client indicated above and shall no~ be ~produced except in full without Ih~ writlen al~ of HBC F..n~ng, inc. Pa~e 2 o~ 4 CONCRETE COMPR IVE STRENGTH Date of Service: 07106/2000 Report No.: 0017568 Client No.: 85229000 Project No.: 94991457 Client: Services: Report Date 07114/2000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: co~raAcroa: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION m~QUIm~MvNrs SXRENCT~: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MIX ID.: 9351 PLACEMENT DATE: 07106/2000 SATCH T~E: 6:35am TIME SAMPLED: 7:20am aY: Greg Dimock WEATIIER CONDmONS: TEMPERATURE (F). Am TRUCK NO: 37 Am CONTENT (~): 4.6 PLACEMENT LOCATION: Clear 80 F coNca~m: 88 ~cr~-r No: 611659 · UNiT w~mirr (~t): N/A Sampled from truck. REPORT OF TESTS ACCUM~JI~TIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COM~ MARKED SLUMP DATE AGE LOAD b~E2~'TH FRACTUR~ SET NO. (incl.) TESTED (d~y~) 01~. forum) (l~i) TYPE 3 1 6.25 07113/2000 7 99820 3530 3 2 6.25 07/13/2000 7 94690 3350 Average 3440 3 3 6.25 0810312000 28 3 4 6.25 08/03/2000 28 Sample location: 50' N of N wall & 50' W of E joint 0ILL This r~port is exclusively for the usc of the client indicated above and shall not bc re~ except in full wilhout thc writ~u q~oval of HBC Patgine~ng, Inc. Page3 of 4 CONCRETE COMPRI IVE STRENGTH TES 8901 Carpenter Frwy., Suite T~ 7~A7 Date of Service: Client No.: 07/06/2000 85229000 Report No.: 0017568 Project No.: 94991457 Report Date 07/14/2000 Client: Transwestem Property Company Atto: James Gaspard 12221 Merit Drive,//450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) ' CoppelL Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TF_~T METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 29 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA MLX LO.: 9351 PLACEMENT DATE: 07/06/2000 BATCH TIME: 7:52am TIME SAMPLED: 8:30am Bt': Greg Dimock W~R co~mo~: Clear TEMPERA~RE (!~- Am 82 F CONCRETE: 88 F TRVCKNO: 42 TIc~"r NO: _ 509739 AIR CONTENT (%): 4.8 u~rr WEIGHT (pc0: N/A ' PLACEMENT LOCATION: See page 1 Sampled from truck. REPORT OF TESTS ACCUMULk~ YARDS: 10 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 1 6.25 '07/13/2000 4 2 6.25 07/13/2000 AGE LOAD. STRENGTH (days) Obs. torte) 7 100990 3570 7 105390 3730 Avernge 3650 4 3 6.25 08/03/2000 28 4 4 6.25 08/03/2000 28 Sample location: 30' S of S wall, N wing & 50' W of E joint Technician: Greg Dimock Report Distribution: (!) Transwestem Profeny Company (1) O'Brien & Associates ( I ) Technistructure$, Inc. (D Butler Omstmaioa Staffed: 3:00am (1) City of Cop~ll O) City of Coop~n Finished: lO:OOam Vice President This report is exclusively for Ihe use of the client indicated above and shall not be reproduced except in full without tie eiten q~pmval of HBC Engineering, Inc. 0ILL Page 4 of 4