Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(5)-LR000615
DALLY ROOFING INSTALLATION INSPECTION ~ 'reaa~ Date of Service: Client No.: Client: I I 06/15/00 85229000 Transwestem Property Company 12221 Merit Drive Suite 450 Dallas, Texas 75251 ' Report No.: Project No.: Project: Page No.: II I i I I iii if II I 0017104 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas 1 of 2 ROOFING CONTRAC'FOR: I-[EC Roofing ROOFING MATERIAL STORED AT SITE: Yes MATERIALS SHEET AVAILABLE AT SITE: Yes MATERIALS REJECTED: No IF YES, REASON FOR REJECTION: CREW SIZE: 10 SITE INFORMATION FOREMAN: LABELS An'ACHED: MATERIALS STORED PROPERLY: WEATHER CONDITIONS: AMBIENT TEMPERATURES: Juan Dominquez Yes Sunny and hot 74°F to 86°F HOURS WORKED: 8:00 a.m. to 12:00 p.m. FORECAST FOR THE NEXT nAY: Sunny and hot MATERIAL TEMPERATURES !.a_%~h. alt Ke,_n.~: 500 + 25 remper-_v_,re: 500 Temperature: 450 Point of Deposit: 450 :t: 25 Time: 9:00 am Time: 9:20 am MANUFACTURER OF SYSTEM: Johns/Manville DECK IN$PECTION: Yes, metal deck CRICKETS INSTALLED: No L~:A'm~ OF m.~¢EM£NT VH~n OATE: West wall, south end, Building B OPERATIONS INSPECTED On this date, approximately 70 squares were placed. Placement was specifiCations. Perlite, cant strips and felts were installed. in general accordance with project This rclx~t is exclusively for the use o~ the client iadicated above aad dudl e°~ be relxxxka~ed ia ~1 ~t ~ ~ ~ ~ ~' ~' , © DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: I 06115/00 85229000 Transwestem Property Company 12221 Merit Drive, Suite 450 Dallas, Texas 75251 Report No.: Project No.: Project: Page No.: DalIa~ Testa 75247 0017104 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas 2 of 2 DEFICIENCIES NOTED: ROOF SKETCH ATTACHED: DEBRIS REMOVED FROM ROOF SURFACE: Yes No Yes REPORTED TO: PHOTOGRAPHS TAKEN: No ADDITIONAL COMMENTS Technician: C. Williams Report Distribution: (1) Tmnswestem Property Company (1) O'Brien & Associates (1) Techntstructures, Inc. (1) Butler Construction Started: 8:00 a.m. (1) C~y of Coppe, (1) City of copp~ stopp~: 12:00 p.m. ~ Engineering, Inc. Vice President This reix~ is exclusively fro' Ibc use of ~e client indicaled above and shall n~ be reproduced in ~ ~ ~ ~ ~ ~ ~ ~'