DALLY ROOFING INSTALLATION INSPECTION
Date of Service:
Client No.:
Client:
06/07/00
85229000
Transwestem Property Company
12221 Merit Drive Suite 450
Dallas, Texas 75251
ROOFING CONTRACTOR:
ROOFING MATERIAL STORED AT SITE:
MATERIALS SHEET AVAILABLE AT SITE:
MATERIALS REJECTED:
IF YES, REASON FOR REJECTION:
CREW SIZE:
SITE INFORMATION
HEC Roofing
Yes
Yes
No
10
o H]C
s~Oi Caq, aa~ Fr~.. Sui~ ioo
D~las. T,~u 75247
Report No.: 0017103
Project No.: 94991457
P~oject: Coppell Commerce Center
1234 Lakeshore.(Bldg. B)
Coppell, Texas
Page No.: 1 of 2
Juan Dominquez
Yes
Yes
Clear and windy
70°F to 84°F
FOREMAN:
LABELS ATrACHED:
MATERIALS STORED PROPERLY:
WEATHER CONDITIONS:
AMBIENT TEMPERATURES:
HOURS WORKED: 1:00 p.m. to 2:00 p.m.
FORECAST FOR THE NEXT DAY: Clear and Windy
MATERIAL TEMPERATURES
SPEO. FIED TEMPERATURES I°F} DAILY TEMPERATURES (°F} POINT OF DEPOSIT
&' SC"hr ''"-~ Ke-'*? 500 + 25 Temperature: 5 l0 Temperature: 460
Point of Deposit: 450:1:25 Time: 1:30 pm Time: 2:00 p.m.
MANUFACTURER OF SYSTEM: Johns/Manville
DECK INSPECTION: Yes, metal deck
CRICKETS INSTALLED: NO
LOCATION OF PLACEMENT THIS DATE: South wall, center roof
OPERATIONS INSPECTED
On this date, approximately 140 squares were placed. Placement was
specifications. Perlite and fiberglass felts were installed.
in general accordance
with
project
This rqxxt is exclusively for the use of the client indicated above end shall not be reproduced in full without ~ ~n-oVai of HBC F~neoring, Inc.
" O
DALLY ROOFING INSTALLATION INSPECTION
Date of Service:
Client No.:
Client:
I I I
06/07/00
85229000
Transwestem Property Company
12221 Merit Drive, Suite 450
Dallas, Texas 75251
I IHI
Report No.:
Project No.:
~xqect:
Page No.:
8901 C~peam' F.n,q,.. $~it~ 100
DMim. Te, xM 75247
0017103
94991457
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
2 of 2
DEFICIENCIES NOTED:
ROOF SKETCH ATTACHED:
DEBRIS REMOVED FROM ROOF SURFACE:
YCS
Yes
REPORTED TO:
PHOTOGRAPHS TAKEN:
No
ADDITIONAL COMMENTS
Technician: C. Williams
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Techr~truc~ure~, Irc.
(1) BuYer Construction
St,ned: 1:00 p.m. Stoppad: 5:00 p.m.
(1) City of Coppall
(1) City of Coprml
~ Engjneerin I
Vice Preaident
This report is exclusively for the use of thc client indicated above and shall not b(: ~ in full without written approval of HBC F~win~Wil~ Inc.
REPORT OF STRUCT L STEEL INSPECT N
Date of Service: 06/01/2000
Client No.: 85229000
Report No.: 0014423
Project No.: 94991457
Report Date
06/07/2000
Client: Transwestem Property Company
AUn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Project: Coppell Commerce Center
1234 Lake, shore (Bldg. B)
Coppell, T~a~as
Services: Structural steel inspection.
On this date, an HBC Engineering representative arrived at the above referenced
jobsite as scheduled for structural steel inspection. A visual inspection was
conducted 'on Building B, Roof Level Framing between lines H.5 to M and 5 to 11.5
as noted below.
1. Reinspection item, metal deck installation, puddle
welds were now determined to be compliant.
Tedankian: Randy Wakker
Reim~t Distribution:
(1) Tran.v~estem Property Company
(I) O'Brien & As.~Aates
(l) Technistmctures, Inc.
(1) Butler Construction
(!) City of Coppeil
(1) City of Coppe]i
H~ Engineering, Inc.
Eugene Harbour
Vice President
This report is exclusively for thc use of ~he client indicated above and shall not be r~___,cefl_ _ except in full without the wri~m approval of HDC F-~r. in~.
Pat, e 1 of I