Loading...
Northlake 635(5)-LR000607, DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: 06/07/00 85229000 Transwestem Property Company 12221 Merit Drive Suite 450 Dallas, Texas 75251 ROOFING CONTRACTOR: ROOFING MATERIAL STORED AT SITE: MATERIALS SHEET AVAILABLE AT SITE: MATERIALS REJECTED: IF YES, REASON FOR REJECTION: CREW SIZE: SITE INFORMATION HEC Roofing Yes Yes No 10 o H]C s~Oi Caq, aa~ Fr~.. Sui~ ioo D~las. T,~u 75247 Report No.: 0017103 Project No.: 94991457 P~oject: Coppell Commerce Center 1234 Lakeshore.(Bldg. B) Coppell, Texas Page No.: 1 of 2 Juan Dominquez Yes Yes Clear and windy 70°F to 84°F FOREMAN: LABELS ATrACHED: MATERIALS STORED PROPERLY: WEATHER CONDITIONS: AMBIENT TEMPERATURES: HOURS WORKED: 1:00 p.m. to 2:00 p.m. FORECAST FOR THE NEXT DAY: Clear and Windy MATERIAL TEMPERATURES SPEO. FIED TEMPERATURES I°F} DAILY TEMPERATURES (°F} POINT OF DEPOSIT &' SC"hr ''"-~ Ke-'*? 500 + 25 Temperature: 5 l0 Temperature: 460 Point of Deposit: 450:1:25 Time: 1:30 pm Time: 2:00 p.m. MANUFACTURER OF SYSTEM: Johns/Manville DECK INSPECTION: Yes, metal deck CRICKETS INSTALLED: NO LOCATION OF PLACEMENT THIS DATE: South wall, center roof OPERATIONS INSPECTED On this date, approximately 140 squares were placed. Placement was specifications. Perlite and fiberglass felts were installed. in general accordance with project This rqxxt is exclusively for the use of the client indicated above end shall not be reproduced in full without ~ ~n-oVai of HBC F~neoring, Inc. " O DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: I I I 06/07/00 85229000 Transwestem Property Company 12221 Merit Drive, Suite 450 Dallas, Texas 75251 I IHI Report No.: Project No.: ~xqect: Page No.: 8901 C~peam' F.n,q,.. $~it~ 100 DMim. Te, xM 75247 0017103 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas 2 of 2 DEFICIENCIES NOTED: ROOF SKETCH ATTACHED: DEBRIS REMOVED FROM ROOF SURFACE: YCS Yes REPORTED TO: PHOTOGRAPHS TAKEN: No ADDITIONAL COMMENTS Technician: C. Williams Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Techr~truc~ure~, Irc. (1) BuYer Construction St,ned: 1:00 p.m. Stoppad: 5:00 p.m. (1) City of Coppall (1) City of Coprml ~ Engjneerin I Vice Preaident This report is exclusively for the use of thc client indicated above and shall not b(: ~ in full without written approval of HBC F~win~Wil~ Inc. REPORT OF STRUCT L STEEL INSPECT N Date of Service: 06/01/2000 Client No.: 85229000 Report No.: 0014423 Project No.: 94991457 Report Date 06/07/2000 Client: Transwestem Property Company AUn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lake, shore (Bldg. B) Coppell, T~a~as Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted 'on Building B, Roof Level Framing between lines H.5 to M and 5 to 11.5 as noted below. 1. Reinspection item, metal deck installation, puddle welds were now determined to be compliant. Tedankian: Randy Wakker Reim~t Distribution: (1) Tran.v~estem Property Company (I) O'Brien & As.~Aates (l) Technistmctures, Inc. (1) Butler Construction (!) City of Coppeil (1) City of Coppe]i H~ Engineering, Inc. Eugene Harbour Vice President This report is exclusively for thc use of ~he client indicated above and shall not be r~___,cefl_ _ except in full without the wri~m approval of HDC F-~r. in~. Pat, e 1 of I II