Loading...
Northlake 635(5)-LR000602DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: 06/02/00 85229000 Transwestem Property Company 12221 Merit Drive Suite 450 Dallas, Texas 75251 III I Report No.: Project No.: Project: Page No.: 8901 ~ Fr~., 0017102 94991457 Coppell Commerce Center 1234 Lakeshore .(Bldg. B) Coppell, TeXas 1 of 2 SITE INFORMATION ROOFING CONTRACTOR: HEC Roofing ROOFING MATERIAL STORED AT SITE: Yes MATERIALS SHEET AVAILABLE AT SITE: Yes MATERIALS REJECTED: · No IF YES, REASON FOR REJECTION: CREW SIZE: 10 FOREMAN: LABELS ATI'ACHED: MATERIALS STORED PROPERLY: WEATHER CONDITIONS: AMBIENT TEMPERATURES: HOURS WORKED: Juan Dominquez Yes Ye~ Sunny 71°F to 92°F 9:00 a.m. to 11:00 a.m. MATERIAL TEMPERATURES SPECIF!E_n TEMPERATURES I'F) DAILY T;MPERATU~, S {°F) PqlNT OF DEPOSIT {'F} A_%~alt Kettle: 500 ± 25 Temperature: 500 reml~erature,. 450 Point of _r~4=ll: 450 ± 25 Time: 9:30 am rlme: 9:45 am, MANUFACTURER OF SYSTEM: Johns/Manville DECK iNSPECTION: Yes, metal deck CRICKETS INSTALLED: NO LOCATION OF PLACEMENT THIS DATE: West wall, north end, Building B OPERATIONS INSPECTED On this date, approximately 80 squares were placed. Placement was specifications. Felts, perlite and skylights were installed. in general accordance with project This report is exclusively for the use of Itg client indicatetl above and shall ~ot Ig repr~_,__,c~_ ia full vtilhout vn'ilt~ approval of H~C Fmgiamiug, [ac. DAILY ROOFING INSTALLATION INSPECTION IIII Date of Service: Client No.: Client: 06/02/00 85229000 Transwestern Property COmpany 12221 Merit Drive, Suite 450 Dallas, Texas 75251 ~0 ! C_~rp~Sar Fr~. S~ite 1O0 Texas 7~247 Report No.: 0017102 Project. No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Page No.: 2 of 2 DEFICIENCIES NOTED: ROOF SKETCH ATTACHED: DEBRIS REMOVED FROM ROOF SURFACE: Yes Yes REPORTED TO: PHOTOGRAPH~ TAKEN: No 'ADDITIONAL COMMENTS Technician: C. Williams Report Dist~bution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technistructures. Inc, (1) Butl~ Construction StartS: 6:00 a.m. (1) city of coppe, O) city of copp~ stopr~: 1:00 p.m. Eugene I~rbour Vice Preaident This report is exclusively for the use of the client indicated above and shall not bc reproduced in full wilhout writ~.n approval air }IBC En~ineedn~,