Northlake 635(5)-LR000601REPORT OF STRUCTL L STEEL INSPECTI
8~01 ~ Fr~. hire #100
Date of Service: 05/26/2000
Client No.: 85229000
Client: Transwestern Property Company
Attn: James Gaspard
12221 Merit Drive,//450
Dallas TX 75251
Report No.: 0014014
Project No.: 94991457
Report Dat~
06/01/20~
Project: Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Structural steel inspection.
On this date, an HBC Engineering representative arrived at the above referenced
jobsite as scheduled for structural steel inspection. A visual inspection was
conducted on Building B, Roof Level Framing as noted below.
Between lines G to M and 1 to 5, metal deck
installation, puddle welds and side lap screws
were determined to be compliant.
Between lines H.5 to M and 5 to 11.5, metal deck
installation
a. Side lap screws were determined to be compliant.
b. Puddle welds, eight (8) noncompliant locations
were found throughout this area. Locations were
marked with an orange paint spot.
Technician: Randy Walcker
Report Distfllmtlon:
(i) Tr~w~m ~ Company
(!) O'Briea & Associates
(!) Tcchnistruclmes, ln~.
(!) Butler Consuuction
(1) C/ty of Coppcl!
(1) City of Coppell
Eugene Harbour
Vi~ President
This repot is exclusively for thc use of Ihe client indicated above and shall not be reproduced except in full wilhout ~h~ ~ apllloval of HBC ~ Inc.
REPORT OF STRUCTU AL STEEL INSPECTI
Date of Service: 05/30/2000
Client No.: 85229000
Client: Transwestem Property Company
Attn: James Oaspard
12221 Merit Drive, g450
Dallas TX 75251
Report No.: 0014135
8901 Carpenter Frwy. Suite #100
~ T~ms 7S247
Report Date
06/01/2000
Project No.: 94991457
Project: Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppcll, Texas
Services: Structural steel inspection.
On this date, an HBC Engineering representative arrived at the above referenced
jobsite as scheduled for structural steel inspection. A visual inspection was
conducted on Building B, Roof Level Framing as noted below.
Reinspection item, metal deck installation
between lines H.5 to M and 5 to 11.5, puddle
weld corrections have still not been completed.
Technician: Randy Walcker
Report Distribution:
(1) Transwestem Property Company
(!) o'ari~n & Associates
(1) Techaiswacmr~, Inc.
(1) Butler Construction
(!) City of Coppeil
(1) City of Coppell
Engineering, Inc.
Eugene Harbour
vice President
This report is exclusively for thc use of the client i.~a~d ~bovc and ~ no~ be reproduced except in full without ~ wdttm ~ o~ HB~ ~ lac.
99~DS
Page I of 1
DALLY ROOFING INSTALLATION INSPECTION
Date of Service:
Client No.:
Client:
06/01/00
85229000
Transwestern Property Company
12221 Merit Drive Suite 450
Dallas, Texas 75251
ROORNG CONTRACTOR:
ROOFING MATERIAL STORED AT SITE:
MATERIALS SHEET AVAILABLE AT SITE:
MATERIALS REJECTED:
IF YES, REASON FOR REJECTION:
CREW SIZE:
Page No.:
8901 ~ Frwy., Suite !~0
Report No.: 0017101
Project No.: 94991457
Project: Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
1 of 2
SITE INFORMATION
HEC Roofing FOREMAN: Juan Dominquez
Yes LABELS ATTACHED: Yes
Yes MATERIALS STORED PROPERLY: Yes
No WEATHER CONDITIONS: Clear
AMBIENT TEMPERATURES: 72°F to 93°F
10 ,OURSWORK£O: 7:00 a.m. to 10:00 a.m.
MATERIAL TEMPERATURES
SPECIFIED TEMPERATURES ~°~ , DALLY TEMPERATURES {°1~ ,POINT OF 0EPO~I' (°1~
Asphalt Kettle: 500 ± 25 Temperature: 510 Tempenltum: 460
Point of Deposit: 450 ± 25 Time: 8:00 am Time: 8:15 am
MANUFACTURER OF SYSTEM: Johns/Manville
DECK INSPECTION: Yes, metal deck
CRICKETS INSTALLED: No
LOCATION OF PLACEMENT THIS DATE: Building B, drain area, north horseshoe
On this date,
specifications.
OPERATIONS INSPECTED
approximately 30 squares were placed. Placement was in
Insulation and cant strips were installed. Felts were applied.
general accordance
with
project
This report is exclusively for the use of r~e client indicated above and shall mX be reproduced in full without written approval OfHBC Eagineerin~, Inc.
DALLY ROOFING INSTALLATION INSPECTION
Date of Service:
Client No.:
Client:
06/01/00
85229000
Transwestern Property Company
12221 Merit Drive, Suite 450
Dallas, Texas 75251
) I
Report No.:
Project No.:
Project:
Page No.:
0017101
94991457
75247
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
2 of 2
DEFICIENCIES NOTED: Yes
ROOF SKETCH ATTACHED: No
DEBRIS REMOVED FROM ROOF SURFACE: Yes
REPORTED TO:
PHOTOGRAPH8 TAKEN: No
ADDITIONAL COMMENTS
Hoist holes in precast wall were not filled.
Technician: C. Williams starts: 6:00 a.m. Stopp, d: 10:00 a.m.
Report Distribution:
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistructures. Inc.
(1) Butler Construction
H~E
(~) my of coppe, a811~ ~,
O) c~/of coppe,
Vice President