Loading...
Northlake 635(5)-LR000601REPORT OF STRUCTL L STEEL INSPECTI 8~01 ~ Fr~. hire #100 Date of Service: 05/26/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive,//450 Dallas TX 75251 Report No.: 0014014 Project No.: 94991457 Report Dat~ 06/01/20~ Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on Building B, Roof Level Framing as noted below. Between lines G to M and 1 to 5, metal deck installation, puddle welds and side lap screws were determined to be compliant. Between lines H.5 to M and 5 to 11.5, metal deck installation a. Side lap screws were determined to be compliant. b. Puddle welds, eight (8) noncompliant locations were found throughout this area. Locations were marked with an orange paint spot. Technician: Randy Walcker Report Distfllmtlon: (i) Tr~w~m ~ Company (!) O'Briea & Associates (!) Tcchnistruclmes, ln~. (!) Butler Consuuction (1) C/ty of Coppcl! (1) City of Coppell Eugene Harbour Vi~ President This repot is exclusively for thc use of Ihe client indicated above and shall not be reproduced except in full wilhout ~h~ ~ apllloval of HBC ~ Inc. REPORT OF STRUCTU AL STEEL INSPECTI Date of Service: 05/30/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Oaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0014135 8901 Carpenter Frwy. Suite #100 ~ T~ms 7S247 Report Date 06/01/2000 Project No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppcll, Texas Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on Building B, Roof Level Framing as noted below. Reinspection item, metal deck installation between lines H.5 to M and 5 to 11.5, puddle weld corrections have still not been completed. Technician: Randy Walcker Report Distribution: (1) Transwestem Property Company (!) o'ari~n & Associates (1) Techaiswacmr~, Inc. (1) Butler Construction (!) City of Coppeil (1) City of Coppell Engineering, Inc. Eugene Harbour vice President This report is exclusively for thc use of the client i.~a~d ~bovc and ~ no~ be reproduced except in full without ~ wdttm ~ o~ HB~ ~ lac. 99~DS Page I of 1 DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: 06/01/00 85229000 Transwestern Property Company 12221 Merit Drive Suite 450 Dallas, Texas 75251 ROORNG CONTRACTOR: ROOFING MATERIAL STORED AT SITE: MATERIALS SHEET AVAILABLE AT SITE: MATERIALS REJECTED: IF YES, REASON FOR REJECTION: CREW SIZE: Page No.: 8901 ~ Frwy., Suite !~0 Report No.: 0017101 Project No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas 1 of 2 SITE INFORMATION HEC Roofing FOREMAN: Juan Dominquez Yes LABELS ATTACHED: Yes Yes MATERIALS STORED PROPERLY: Yes No WEATHER CONDITIONS: Clear AMBIENT TEMPERATURES: 72°F to 93°F 10 ,OURSWORK£O: 7:00 a.m. to 10:00 a.m. MATERIAL TEMPERATURES SPECIFIED TEMPERATURES ~°~ , DALLY TEMPERATURES {°1~ ,POINT OF 0EPO~I' (°1~ Asphalt Kettle: 500 ± 25 Temperature: 510 Tempenltum: 460 Point of Deposit: 450 ± 25 Time: 8:00 am Time: 8:15 am MANUFACTURER OF SYSTEM: Johns/Manville DECK INSPECTION: Yes, metal deck CRICKETS INSTALLED: No LOCATION OF PLACEMENT THIS DATE: Building B, drain area, north horseshoe On this date, specifications. OPERATIONS INSPECTED approximately 30 squares were placed. Placement was in Insulation and cant strips were installed. Felts were applied. general accordance with project This report is exclusively for the use of r~e client indicated above and shall mX be reproduced in full without written approval OfHBC Eagineerin~, Inc. DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: 06/01/00 85229000 Transwestern Property Company 12221 Merit Drive, Suite 450 Dallas, Texas 75251 ) I Report No.: Project No.: Project: Page No.: 0017101 94991457 75247 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas 2 of 2 DEFICIENCIES NOTED: Yes ROOF SKETCH ATTACHED: No DEBRIS REMOVED FROM ROOF SURFACE: Yes REPORTED TO: PHOTOGRAPH8 TAKEN: No ADDITIONAL COMMENTS Hoist holes in precast wall were not filled. Technician: C. Williams starts: 6:00 a.m. Stopp, d: 10:00 a.m. Report Distribution: (1) Transwestem Property Company (1) O'Brien & Associates (1) Technistructures. Inc. (1) Butler Construction H~E (~) my of coppe, a811~ ~, O) c~/of coppe, Vice President This rel~t is exclusively for ~e use of the client indicated above and slutll not be reproduced in ~ wiltxmt wri#en ai~al ~ HBC l~gineerJ~ Inc.