Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(5)-LR000525
DAILY ROOFING INSTALLATION INSPECTION Date of Service: 05/25/00 Report No.: Client No.: 85229000 Project No.: Client: Transwestem Property Company ProJe~: 12221 Merit Drive Suite 450 Dallas, Texas 75251 ROOFING CONTRACTOR: ROOFING MATERIAL STORED AT SITE: MATERIALS SHEET AVAILABLE AT SITE: MATERIALS REJECTED: IF YES, REASON FOR REJECTION: CREW ~ SITE INFORMATION HEC Roofing Yes Yes No Page No.: 10 ili /i "~7 .... 7' 0013918 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas lof2 FOR~: Juan Dominquez LABELS A'I'rACH~D: Yes MATERIALS STORED PROPERLY: Yes W~THER CoN=moNa; Sunny AHm,=~r TEm,~xun;s: 71 o F to 92° F HOUriS WO~nC~. 7:00 a.m. 5OO±25 MATERIAL TEMPERATURES MANUFACTURER OF SYSTEM: Johns/Manville DECK INSPECTION: Yes, metal deck CRIGKET8 INSTALLED: No t.OCA'rK~N ~ PL~C~E~r TH~S DATE: Center roof, Building B OPERATIONS INSPECTED On this date, approximately I43 squares were placed. Placement and applications were in general accordance with project specifications. This mp~x is exclusively fo~ the use of th~ client ~ above and si~ll not be re~ in full ~ ~ ~ ~ ~ ~ ~. © DALLY ROOFING INSTALLATION INSPECTION Date of Service: Client No.: Client: 05/25/00 85229000 Transwestern Property Company 12221 Merit Drive, Suite 450 Dallas, Texas 75251 il Ill · illJlll IIIIIJl I I I il II I'll Report No.: 0013918 Project No.: 94991457 Project: Coppell Commerce Center ]234 Lakcshorc (Bldg. B) Coppell, Texas Page No.: 2 of 2 DEFICIENCIES NOTED: Yes ROOF SKETCH ATTACHED: NO DEBRIS REMOVED FROM ROOF SURFACE: Yes REPORTED TO: PHOTOGRAPHS TAKEN: NO ADDITIONAL COMMENTS Roof skylights had not arrived as of this date and will be installed upon arrival. Technician: C. Williams Report Diatribution: (1) Tmnswestem Propmty Company (1) O'Brien &Associates (1) Technistructures, Inc. (1) Butler Construction (1) City of Coppall (1) c,~of coppe. Technician T~me: 4 hours ~ Engineer~, Inc. ~u~ne ~ vice Preside~ This repo~ is exclusively fo~ fl~e use of file client ind~ated ab~we and s~tll not be ~- ---~- - tn ~ ~ ~ ~ ~ ~ ~~' REPORT OF STRUCT AL STEEL INSPECT N EN~ql~HN3,1NC 8901 Carpenter Frwy., Suite #1~0 Date of Service: 05/23/2000 Client No.: 85229000 Client: Transwestem Property Company Atto: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0013614 Project No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Sel'vices: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual ~nSpection was conducted on Building B, Roof Level Framing as noted below. Between lines A to D.5 and 5 to 11.5, metal deck installation, puddle welds and side lap screws were determined to be compliant. Technician: Randy Walcker Report Distribution: (l) Tn~wesmu Prope~ Comfy (I) O'Bfiml & Associat~ (I)T~, ~. (1) City of Coppcll (1) City of Coppell