Loading...
Northlake 635(5)-LR000531 © DAILY ROOFING INSTALLATION INSPECTION II Date of Service: Client No.: Client: I II 05/31/00 85229000 Transwestern Property Company 12221 Merit Drive Suite 450 Dallas, Texas 75251 ROOFING CONTRACTOR: ROOFING MATERIAL STORED AT SITE: MATERIALS SHEET AVAILABLE AT SITE: MATERIALS REJECTED: IF YES, REASON FOR REJECTION: CREW ~IZE: SITE INFORMATION HEC Roofing Yes Yes No 10 Report No,: Project No.: Project: Page No.: 0013919 94991457 ~,INC IL I ~[ IL t Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas 1 of 2 FOREMAN: LABELS, ATI'ACHED: MATERIALS STORED PROPERLY: WEATHER CONDmON~: AMBIENT ~TURE$: HOUR8 WORKED: Juan Dominquez Yes Yes Sunny 71° F to 92° F 7:00 a.m. MATERIAL TEMPERATURES 470 MANUFACTURER OF SYSTEM: Johns/Manville ORCK mssn:cnOR: Yes, ~ ~k ~~ I~O: No ~~ OF P~C~E~ ~ OA~ West wall, R~f B OPERATIONS INSPECTED On this date, approximately 80 squares were placed. Placement and application was in general accordance with project specifications. Tl~s report is exclusively for Ibc use of the client indicaled above md droll eot be re~ h ~ ~ ~ ~ ~ ~ ~ ~' DAILY ROOFING INSTALLA( ON INSPECTION Date of Service: Client No.: Client: 05/31/00 85229000 Transwestern Property Company 12221 Merit Drive, Suite 450 Dallas, Texas 75251 o Project No.: Project: Page No.: 0013919 94991457 Coppell Commerce Center 1234 Lakeshorc (Bldg. B) Coppell, Texas 2of2 DEFICIENCIES NOTED: Yes ROOF SKETCH ATTACHED: NO DEBRIS REMOVED FROM ROOF SURFACE: Yes REPORTED TO: PHOTOGRAPI,~ TAKEN: No ADDITIONAL COMMENTS The drain west of the roof divider on Roof B was too high due to the deck was too low. TeGhni~Mn: C. Williams Report Distribution: (1) Tmnsweste(n Propen~ Company (1) O~rien & Associates (1) TechnistnJctures, Inc. (1) Butler Construction (1) City of Coppell (1) ci~ ~ ~ Technician Time: 4 hou~ Eugene Harbom' Vice PrediCt This rqxxt is exclusively for ibc use ~ ~'te client indicat~l s, bove and droll n~X be n~xlu~d in full ~ ~ ~ ~ ~ ~ ~- REPORT OF STRUCTL( .AL STEEL INSPECTION Date of Service: 05/24/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: 0013726 Project No.: 94991457 Report Date 0513112000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Se£vices: Structural steel inspection. On this date, an HBC EnGineerinG representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on Building B, Roof Level Framing as noted below. Metal deck installation between lines A to G and 1 to 5, puddle welds and side lap screws were determined to be compliant. Tedmicha: Randy Walcker Report Distribution: (!) Tramwemtexa Property Conkuauy (I) O'Briea & Associates (i) Techai.~uctures, Inc. (1) Buffer Co~uucfio~ (1) Cit~ of Cop[mil (1) City of Coppdl ~ ~gineering, Inc. Vice Preaident ~ repot is exclusively for the usc of the client indicated above and shall not be ~ except in fuji wi~bo~ ~ ~ ~6~! of HBC F,a~l~ris~ [~ Paae I of I