Northlake 635(5)-LR000519REPORT OF STRUCTI .AL STEEL INSPECTIC Date of Service: 05/15/2000 Report No.: 0012803 Report Date 05/19/2000 Client No.: 85229000 Project No.: 94991457 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on Building B, Roof Level Framing between lines A to D.5 and 5 to 11.5 as noted below. 1. Column anchor bolts were determined to be compliant. 2. Bolted connections were determined to be compliant. 3. Joist and girder seat welds were determined to be compliant. 4. -Joist bridging was determined to be compliant with an exception at the en~-~, line 11.~ not attac~. 5. Joist seat fix was now in progress at line D.5-5, need engineer approval~ Perimeter metal deck support angle was determined to be compliant. (1) City of Coppcll (1) City of Coppcll Pa~D. Smith, P.E. Senior Project Engineer This repofl is exclusively for lhe use of the client indicated above and shah not be reproduced except in full without ~he written approvM o~ HBC ~ [nc. REPORT OF STRUCTL L STEEL INSPECTI{ 8901 Carpenter Fr~., S~ite #100 ~ Tern 7S247 Date of Service: 05/1712000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Report No.: 0013058 Project No.: 94991457 Report Date 0511912000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Structural steel inspection. On this date, an HBC Engineering representative arrived at the above referenced jobsite as scheduled for structural steel inspection. A visual inspection was conducted on Building B, Roof Level Framing as noted below. Reinspection, between lines A to D.5 and 5 to 11.5: 1. Column anchor bolts were now determined to be compliant. 2. Joist bridging attachments to end walls were now determined to be compliant. 3. Joist seat field fix at line D.5-5 was now determined to be compliant. Between lines A to M and 1 to 4 and lines H.5 to M and 5 to 11.5: 1. Column anchor bolts were determined to be compliant. 2. Joist and girder seat welds were determined to be compliant. 3. Joist bridging was not complete. 4. Girder moment connection strap plate welds were determined to be compliant. Bolted connections were determined to be compliant. (i) City of Coppdl (1) City of Coppcll Te~_hnidlm: Randy Wakker Report Dharibution: (1) Tramw~tem Propmy Company (!) O'B6m & Aasoc~ (1) Technism~ctures, Inc. (1) Butler Consm~ion Semor Project Engineer This report is exclusively for ~he use of ~he client indicated above and shall no~ be re~ except in full without lhe wrRlen a[~ ofHBC En~ng, Inc.