Loading...
Northlake 635(5)-LR000512CONCRETE COMPR IVE STRENGTH TESO Date of Service: Client No.: Client: 04/13/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 8901 Carpenter Fr~., Suite #100 Dalim, Tram 75247 Report Date Report No.: 0009874 05/12/2000 Project No.: 94991457 Project: Coppell Commerce Center. 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: co~raxc'roa: Butler Construction CONCRETE SU~PLmR: Pioneer PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 4-6" 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA ~ro.: 9349 PLA~ DATE: ~ SA~O'LV.~: 8:10am co.moss: TEMI'~ (1~. Am ~UC~ ~O: 18~ Am CO~ (~): 4.1 04113/2000 BaTCa TE~: 7:30am BY: Kevin Poston Cloudy 55 F CONCg~m: 66 V T~c~r NO: 505912 tnvrr w~laa'r (pc0: N/A I'I~CEMF, NT LOCATION: Pauels- Building "B' 254, 253, P-13, 249, 248, 247, P312, 243, 242, 241,240,239 SAMPLE IX)CATION: Panel ~241 REPORT OF TESTS ACCUMULATIVE YARD~: 10 SET NO. MEASURED MAXIMUM COM~~RI~IVE SLUMP DATE AGE LOAD 5TRI~IGTH FRACTUR~ 0nctm) ~ (days) (lbs. force) (psi) ~ 1 I 4.50 04120/2000 7 120600 4260 1 2 4.50 04/20/2000 7 120140 4250 Average 4260 1 3 4.50 0511112000 28 146980 5200 1 4 4.50 05/1112000 28 153780 5440 Average 5320 0ILL This report is exclusively fo~ the usc of the client indicated above and shall not bc repn~l._~__~_ except in full withc~ lhe writlen apl~oval of HBC ~ Inc. Page I of 3 CONCRETE COMPRE IVE STRENGTH TES Date of Service: 04/13/2000 Client No.: 85229000 Report No.: Project No.: 0009874 94991457 Report Date 05/1212000 Client: Transwestem Property Company Project: Atto: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Copper Commerce Center 1234 l. akeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TI~T METHOD: COm~ACTOm Butler Construction CONCRgrg ~UPI'LIER: Pion~r ~,~NT: 27 STmma~: 4000 psi @ 28 Days 4-6" 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Panel 248 PROJECT DATA ~.: 9349 PLACEMEWr DATE: 04/13/2000 aA~ ~n~m: 8:30am TIMESAMlqAgD: 9:15am aY: KevinPoston WEATHER CONDmONS: TEMI'~~ OD - Am ~UCKNO: 836 Am coh'rg~r (~0:4.9 PLACEMEWr LOCATION: Cloudy 55 v CONCa.~-aX: 64 F XlCr~-r~o: 505921 u~r V~lG~rr C~f~: N/A Sampled from tmci~ REPORT OF TESTS ACCUMULATIV~ YARB~: 10 MEASURED MAXIMUM COM~RF3SIVE SLUMP DATE AGE LOAD STRENGTH FRACTUBE (inches) TESTEO (days) 0b~. force) (pal) TYPE 2 1 6.00 04/20/2000 7 107750 3810 2 2 6.00 04/20/2000 7 108830 3850 Average 3830 2 3 6.00 05/1112000 28 126690 4480 2 4 6.00 05/1112000 28 122400 4330 Average 4410 0ILL This report is exclusively for the use of the client indicated above and shall no~ bc rcproduccd except in full without the writ~n approval of I-IBC Engi~ Inc. Page 2 of 3 CONCRETE COMPRE IVE STRENGTH) I I I Date of Service: 04/13/2000 Report No.: 0009874 Client No.: 85229000 Project No.: 94991457 8901 Carinat~r Frwy. Suit~ ~1~ ~ T~ 7~a7 IIII II II III Re~ Date 05/1~ Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, 8450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. AIR: T~T MI~HOD: CONT~crom Butler Construction CONCILKT~ SUPPLIF~: Pioneer rt.n~rr: 27 SPECWICATION REQUIREMENTS STreak'm: 4000 psi @ 28 Days 4-6" 3-5% ASTM C-143 ASTM C-172 ASTM C-39 LOCATION: Panel 8254 PROJECT DATA ~xl~.: 9349 PLAC~VF DATE: 04113/2000 anxc~ ~: 10:00am ~ SAM~U~: 12:15pm nY: Kevin Poston w~xu~acom~mom: Cloudy Ti~tl~RATtrag O3- Am 62 F CONCg~T~: 71 F 'n~UCKNO: 103 X~CZX'rNO: 501501 Am coto~vr (%): 4.1 tnvrr w~IG~rr ~: N/A P~~ ~N: Sampled from Uucla REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER M~.KED NO. 3 I 4.50 3 2 4.50 3 3 4.50 3 4 4.50 DATg 04/20/2000 04120/2000 05/11/2000 05/11/2000 MAXIMUM COMPRESSIVE AGE LOAD STBENG~ (days) Ot~ f~rce) C~) 7 111740 3950 7 113080 4000 Average 3980 28 143110 5060 28 144450 5110 Average 5090 TYPE T~ehnlch~ Kevin Poston Report Distributiom (0 T-~ ~VWz~ty Company ( ! ) O'l~i~ & A~ociates (l) Teclmi~ructu~, Inc. (1) Butl~ C_~mmcfion Started: 7:00am City of Coppell City of Copl~n Finished: l:00pm I-~ E~g, Inc. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the writlga apl~oval of HBC _l~neeting, lac. OILL Pa~e 3 of 3