Loading...
Northlake 635(5)-LR000413· CONCRETE COMPR SIVE STI NGTH 8901 Carl~m' l~'wy., ~ #1~ Date of Service: 03/14/2000 Report No.: 0007018 Client No.: 85229000 Project No.: 94991457 Client: Services: Report Date 04/13/2000 Transwestem Property Company ACm: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP:. An~: TEST METHOD: CONTRACTOR: Buffer Construction CONCRETE SUPPLIER: Pioneer m..n~vr: 22 SPECIFICATION REQUIREM~..NTS S~NaTn: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location PROJECT DATA M~XI~.: 9351 ~,t~cmviEt~rr OATE: 03/14/2000 SAWn ~: 3:56am TIM~SAMPLED: 4:20am aY: Eddie Elrod WEATIIER CONDITIONS: TEMPERATURE (1~ - Am 'rauc~t~o: 1883 am co~rrnvr (.~): N/A PLACEMENT LOCATION: Paving- See atlached sketch Cloudy 61 r coNca~'r~: 71 Tics~r~o: 502955 trt~rr~gr(~): N/A REPORT OF TESTS ACCUMULATIV~YARI~: 30 CYLINDER SET NO. MEASURED MAXIMUbl COMPRF..~S~ SLUMP DATE AGE LOAD $Yi~.i~GTH ln~dkCTURE (inch.) TESTED (days) Obs. for~) (!mi) TYPE I 1 6.00 03/21/2000 7 110870 3920 I 2 6.00 03/21/2000 7 113080 4000 Average 3960 1 3 6.00 04/11/2000 28 123910 4380 1 4 6.00 04/11/2000 28 125810 4450 Average 4420 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval ofHBC F,n~.efing. Inc. 0ILL Page 1 of 3 -CONCRETE II Date of Service: 03114/2000 Client No.: 85229000 II Report No.: 0007018 Project No.: 94991457 89Ol Carpmter FrwT. Suite #100 Report Date 04/13/2000 Client: Transwestem property Company Project: Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell,'Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP:, AIR: TEST METHOD: CONT~CTOR: Butler Construction CONCRETE SIJIq*LIER: Pioneer PLANT: 22 SPEcnncnTXON REQ~NTS STIU~NOTH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See page I PROJECT DATA M~X LD.: 9351 PLACEMENT DATE: 0311412000 BATCH Tn~: 5:01am TIME SAMPLED: 5:40am BY: Eddie Elrod WE~Tmmco~moNs: Cloudy T~O'ER~TU~ ~-nm 62 F coNcRrr~: 73 F T~UCKNO: 1883 T~CKrr NO: 502968 Am CONTF2qT ('/~): N/A UmT ~ (p~: N/A PLA~ LOCATION: REPORT OF TESTS ACCUMULATIVE YARDS: 160 CYLINDER MARKED SET NO. MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD (inches) TESTED (days) Obs. force) (psi) TYPE 2 1 5.75 03~2112000 7 98980 3500 2 2 5.75 0312112000 7 96110 3400 Average 34S0 2 3 5.75 0411112000 28 112290 3970 2 4 5.75 04111/2000 28 118410 4190 Average 4080 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Eagineering, Inc. Page 2 of 3 ' CONCRETE COMPR SIVE STRF. NGTH TE f Date of Service: 03/14/2000 Report No.: 0007018 Client No.: 85229000 Project No.: 94991457 $901 Carpmm' Frwy., Sult~ Report Date 04/13/2000 Client: Transwestem Property Company Project: Attn: James Oaspard 12221 Merit Drive, 0450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST blETllOD: co~c'ro~ Butler Construction CONCRETE SUPPLIER: Pioneer r~vr: 22 s~cnncATION REQ~,rrs STREW;Tn: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See page 1 PROJECT DATA ~*,nx ~o.: 9351 PLACEMENT DATE: 03/14/2000 BATCH TIME: 5:17am xn~sasn, c~: 6:15am aY: Eddie Elrod WEATHER CONDmONS: TEMPERATURE (F) - AIR TI~UC~NO: 852 AIR CObrrgNx (%): N/A PLA~ LOCATION: See pag~ 1 Cloudy 62 r CONCarr~: 71 TIC~mTNO: 502972 tavrr wraon'r ~t): N/A REPORT OF TESTS ACCUMULATIVEYARBS: 200 SET NO. (inches) 3 1 5.75 3 2 5.75 3 3 5.75 3 4 5.75 DATE 03/21/2000 03/21/2000 04111/2000 04/I 112000 AGE LOAD ~~ (days) (lbs. force) (l~i) 7 94980 3360 7 964OO ~10 Average 3390 28 139460 4930 28 141350 5000 Average 4970 Technician: Eddie Elrod Report Dimtbuflom (1) Transwestem Property Company (1) O'Brien & Associates (1) Technistmcmres, Inc. (1) Butler Construction Started: 2:30am (1) city of Co, pen (1) City of Coppell Finished: 8:30am Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 3