Northlake 635(5)-LR000413· CONCRETE COMPR SIVE STI NGTH
8901 Carl~m' l~'wy., ~ #1~
Date of Service: 03/14/2000 Report No.: 0007018
Client No.: 85229000 Project No.: 94991457
Client:
Services:
Report Date
04/13/2000
Transwestem Property Company
ACm: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Project:
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:.
An~:
TEST METHOD:
CONTRACTOR: Buffer Construction
CONCRETE SUPPLIER: Pioneer
m..n~vr: 22
SPECIFICATION REQUIREM~..NTS
S~NaTn: 4000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See placement location
PROJECT DATA
M~XI~.: 9351
~,t~cmviEt~rr OATE: 03/14/2000 SAWn ~: 3:56am
TIM~SAMPLED: 4:20am aY: Eddie Elrod
WEATIIER CONDITIONS:
TEMPERATURE (1~ - Am
'rauc~t~o: 1883
am co~rrnvr (.~): N/A
PLACEMENT LOCATION:
Paving- See atlached sketch
Cloudy
61 r coNca~'r~: 71
Tics~r~o: 502955
trt~rr~gr(~): N/A
REPORT OF TESTS
ACCUMULATIV~YARI~: 30
CYLINDER
SET NO.
MEASURED MAXIMUbl COMPRF..~S~
SLUMP DATE AGE LOAD $Yi~.i~GTH ln~dkCTURE
(inch.) TESTED (days) Obs. for~) (!mi) TYPE
I 1 6.00 03/21/2000 7 110870 3920
I 2 6.00 03/21/2000 7 113080 4000
Average 3960
1 3 6.00 04/11/2000 28 123910 4380
1 4 6.00 04/11/2000 28 125810 4450
Average 4420
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval ofHBC F,n~.efing. Inc.
0ILL Page 1 of 3
-CONCRETE
II
Date of Service: 03114/2000
Client No.: 85229000
II
Report No.: 0007018
Project No.: 94991457
89Ol Carpmter FrwT. Suite #100
Report Date
04/13/2000
Client: Transwestem property Company Project:
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell,'Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:,
AIR:
TEST METHOD:
CONT~CTOR: Butler Construction
CONCRETE SIJIq*LIER: Pioneer
PLANT: 22
SPEcnncnTXON REQ~NTS
STIU~NOTH: 4000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See page I
PROJECT DATA
M~X LD.: 9351
PLACEMENT DATE: 0311412000 BATCH Tn~: 5:01am
TIME SAMPLED: 5:40am BY: Eddie Elrod
WE~Tmmco~moNs: Cloudy
T~O'ER~TU~ ~-nm 62 F coNcRrr~: 73 F
T~UCKNO: 1883 T~CKrr NO: 502968
Am CONTF2qT ('/~): N/A UmT ~ (p~: N/A
PLA~ LOCATION:
REPORT OF TESTS
ACCUMULATIVE YARDS: 160
CYLINDER
MARKED
SET NO.
MEASURED MAXIMUM COMPRESSIVE
SLUMP DATE AGE LOAD
(inches) TESTED (days) Obs. force) (psi) TYPE
2 1 5.75 03~2112000 7 98980 3500
2 2 5.75 0312112000 7 96110 3400
Average 34S0
2 3 5.75 0411112000 28 112290 3970
2 4 5.75 04111/2000 28 118410 4190
Average 4080
0ILL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Eagineering, Inc.
Page 2 of 3
' CONCRETE COMPR SIVE STRF. NGTH TE f
Date of Service: 03/14/2000 Report No.: 0007018
Client No.: 85229000 Project No.: 94991457
$901 Carpmm' Frwy., Sult~
Report Date
04/13/2000
Client: Transwestem Property Company Project:
Attn: James Oaspard
12221 Merit Drive, 0450
Dallas TX 75251
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:
AIR:
TEST blETllOD:
co~c'ro~ Butler Construction
CONCRETE SUPPLIER: Pioneer
r~vr: 22
s~cnncATION REQ~,rrs
STREW;Tn: 4000 psi @ 28 Days
5.0" Max
N/A
ASTM C-143
ASTM C- 172
ASTM C-39
SAMPLE LOCATION:
See page 1
PROJECT DATA
~*,nx ~o.: 9351
PLACEMENT DATE: 03/14/2000 BATCH TIME: 5:17am
xn~sasn, c~: 6:15am aY: Eddie Elrod
WEATHER CONDmONS:
TEMPERATURE (F) - AIR
TI~UC~NO: 852
AIR CObrrgNx (%): N/A
PLA~ LOCATION:
See pag~ 1
Cloudy
62 r CONCarr~: 71
TIC~mTNO: 502972
tavrr wraon'r ~t): N/A
REPORT OF TESTS
ACCUMULATIVEYARBS: 200
SET NO. (inches)
3 1 5.75
3 2 5.75
3 3 5.75
3 4 5.75
DATE
03/21/2000
03/21/2000
04111/2000
04/I 112000
AGE LOAD ~~
(days) (lbs. force) (l~i)
7 94980 3360
7 964OO ~10
Average 3390
28 139460 4930
28 141350 5000
Average 4970
Technician: Eddie Elrod
Report Dimtbuflom
(1) Transwestem Property Company
(1) O'Brien & Associates
(1) Technistmcmres, Inc.
(1) Butler Construction
Started: 2:30am
(1) city of Co, pen
(1) City of Coppell
Finished: 8:30am
Paul D. Smith, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 3