Loading...
Northlake 635(5)-LR000420CONCRETE COMPR IVE STRENGTH TES ) 8901 Carpenter Frwy. Suit~ #100 Date of Service: 03/21/2000 Report No.: 0007655 Client No.: 85229000 Project No.: 94991457 Client: Services: Report Date 04120/2000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONT~CTOa: Butler Construction CONCRETg SUPPLIER: Pioneer ~,A~rr: 22 S~ECW~CnTION ~QtnmavmN'rs 4000 psi @ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA M~X U).: 9349 tn~~ DA~: 03/2112000 BAXCH T~vm: 4:40am ~ s~mn.m): 5:15am sv: Steve Campbell WY. ATHER CONDITIONS: TEMPERATURg (F) - Am TaUCKNO: 32 Am CO~rr~rr (~): NIA PLA CEMENT LOCATION: Cloudy 64 r CONCh: 72 F x~cr~rNo: 529247 t~rr Wgl~iT C,,m: N/A Sample taken from Iruck. SAMPLE LOCATION: 30' W from NE comer of slab REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRE~IVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (lzwA~) TESTED (days) Obs. foree) (psi) TYPE I 1 7.00 03/28/2000 7 112230 3970 1 2 7.00 03/28/2000 7' 110340 3900 Average 3940 1 3 7.00 04118/2000 28 151940 5370 I 4 7.00 04/18/2000 28 148770 5260 Average 5320 0ILL This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wfitteu approval of HBC Engineering, Inc. Pa~e 1 of 8 CONCRETE COMPR IVE STRENGTH 8901 Carpenter Frwy., Suit~ #1,~ Report Date Date of Service: 0312112000 Report No.: 0007655 04/20/2000 Client No.: 85229000 Project No.: 94991457 Client: Transwestem Property Company Attn: James Craspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: Am: TEST METHOD: cowr~croR: Butler Construction CONCRETE SUPPLIER: Pioneer PL~Wr: 22 SPECI~CATION REQUIREMENTS STRENGTU: 4000 psi @ 28 Days 5.0" Max N/A ASTlVl C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA M~X ux: 9349 ln..nc~m' on'r~: 03/2112000 BATCH TIME: 5:15am xnsms~.gn:. 6:00am sY: Steve Campbell WEATm~R CoNDmONS: TI~iPERATURE (Ir). AIR TRUCK NO: 1882 AIR CONTENT (~): N/A PLACEMENT LOCATION: Cloudy 65 v CONClt~a~: 71 v TIOmT~O: 529255 tnOX wv_~G~r C,:eO: N/A Sample taken from ffuck. REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TE~TED (days) 0b~ force) (mi) TYPE 2 I 7.00 03128/2000 7 122600 4340 2 2 7.00 03128/2000 7 115000 4070 Average 4210 2 3 7.00 0411812000 28 143350 5070 2 4 7.00 0411812000 28 147050 5200 Average 5140 Sample location: 50' N x 30' W from SE corner of slab 01LL This report is exclusively fo~ the use of the client indicated above and shall not be re~ except in full without the writ~n ~0v~i of HBC Engine, Inc. Page 2 of 8 CONCRETE COMPRESSIVE STRENGTH TES ) Date of Service: 03/21/2000 Client No.: 85229000 I Report No.: 0007655 Project No,: 94991457 75247 Report Date 04/20/2000 Client: Transwestem Property Company Arm: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST blETHOD: cowraacroa: Butler Construction CONCII_~ SUPPLIER: Pioneer II,ANT: 22 SPECI~CATION REQUIREMENTS s'rmmG~: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAblPLE LOCATION: See below PROJECT DATA ~uxu~.: 9349 PLACEMI2qT DATE: 03/21/2000 BATCH TIME: 7:13am TIM~SAMI~.I~J~: 8:00am BY: Steve Campbell WEATHER CONDmONS: TEM~ERATURF. (FI - AIR TRUCK~O: 1842 Am co~vr (~): N/A PLACEMIRqT LOCATION: Seepage 1 Cloudy 65 v CONCa~"m: 75 F ~C~m'rNo: 536270 tmrr wzm~rr C,~: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER biEASUBED MAXIlVlUM CObIPRESSIVE MARKED SLUlVlP DATE AGE LOAD ~TH FRACTURE SET NO. (incl~s) TESTED (days) (lbs. force) (IM) TYPE 3 I 7.00 0312812000 7 132030 4670 3 2 7.00 0312812000 7 125770 4450 Average 4560 3 3 7.00 04/18/2000 28 155360 5490 3 4 7.00 04/18/2000 28 150090 5310 Average 5400 Sample location: 100' W x 15' S from northeast corner of slab 0ILL This report is exclusively for the use of the cflent indicated above and shall not be reproduced except in full wiltmut I1~ written approval of HBC Engin~-~ing, Inc. Page3 of 8 CONCRETE COMPRE( IVE STRENGTH TES I I Date of Service: 03/21/2000 Report No.: 0007655 Client No.: 85229000 Project No.: 94991457 a d~,~on of ~ 8901 Carpent~ Fray., SMt~ ~1~ Illlll ~Tm 7~7 Re~ Da~ ~0/2~ Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: co~ranc'xoa: Butler Construction CONCB~I~ SUPPLIER: Pioneer ~,~,wr: 22 S~'ECnnCATION ~~ ST~2~t: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA M~X LU.: 9349 ~n~ac~vnan'r DAT~: 03/21/2000 BATCH TIME: 8:00am T~S~: 8:30am BY: Steve Campbell W~R commoNs: Cloudy TEMPERATURE (l~. AIR 66 g CONCRETE: 74 g TaUCXhO: 727 T~CX~TNO: 529282 Am CONTENT ('~): N/A t~rr W~GaT ~:~: N/A PLA~ LOCATION: Sample taken from mack. REPORT OF TF TS ACCUMULATIVE YARDS: 10 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STPJ~IGTH (inches) TESTED (days) Ob~ force) (psi) 4 1 6.50 03/2812000 7 125110 4420 4 2 6.50 03/2812000 7 119380 4220 Average 4320 4 3 6.50 04118/2000 28 158390 5600 4 4 6.50 04118/2000 28 155540 5500 Average 5550 Sample location: 130'W x 30' south from northeast corner of slab OILL This report is exclusively for the use of the client indicated above and shah not be reproduced except in full wilhout the written approval of HBC Engineering, Inc. Page 4 og8 I CONCRETE COMPRE IVE STRENGTH TES Date of Service: 03/21/2000 Report No.: 0007655 Client No.: 85229000 Project No.: 94991457 a tNv~lon of'~ Report Date 04/20/2000 Client: Transwestern'Property Company Project: Arm: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Conunerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTraCTOR: Butler Construction CONCBETE SUPPLIER: Pioneer l~cwr: 22 SPECIFICATION REQ~ STIw.~: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below PROJECT DATA M~XUX: 9349 PI, AC~ DATE: 03/21/2000 Sn~li ~: 9:00am ~S~: 9:30am nV: Steve Campbell WEATHER CoNDmoNS: TEMPERATURE (F) - Am TaUCK~O: 727 Am coNY~r (~): N/A PLA~ LOCATION: Cloudy 66 r CONCRZTE: 76 F TicKrr~o: 529294 uNrr w~gmT (Vc~: N/A Sample taken from uuck. REPORT OF TESTS ACCUMULATIVE YARDS: lO CYLINDER MARKED SET NO. MF, AS~D MAXIMIYM COMPI~,~S~ SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) 0ha. force) (l~i) TYPE 5 1 7.50 03/28/2000 7 112150 3970 5 2 7.50 03/28/2000 7 109600 3880 Average 3930 5 3 7.50 04/18/2000 28 137420 4860 5 4 7.50 0411812000 28 143680 5080 Average 4970 Sample location: 120' East x 50' south from northwest corner 01LL This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full withom the written approval of HBC Engineering, Inc. Page 5 or8 CONCRETE COMPRE IVE STRENGTH TES Date of Service: 03/2112000 Report No.: 0007655 Client No.: 85229000 Project No.: 94991457 89Ol C~penter Itr~y., Suita I I I ~]ll I~ I I~ I Re~rt Da~ ~0/2~ Client: Transwestern Property Company Project: Atto: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: Aim IF, ST METHOD: co~rrRACrOR: Butler Construction CONCRETE SUPPLIER: Pioneer i)LAIVr: 22 SI'EcnncAT~ON n.V, Qt~n~m~ STRim(~TH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C-143 ASTM C-172 ASTM C-39 SAMIq.,E LOCATION: 90' E x 40' S from NW comer PROJECT DATA M~XLD.: 9349 l'La~ OaTE: 0312112000 ~ATCa xmiE: 9:20am TU~ SAMPLED: 10:15am ~J¥: Steve Campbell WEATa~ CONDmONS: TEMPERATURE (F) - Am xguc~lx~o: 842 am COto~r (~): N/A PLACEMENT LOCATION: Cloudy 66 F CONcmrrg: 75 ~c~m-rNo: 529299 uNrr WEiGlrr (pe0: N/A Sample taken f~nn tmcL REPORT OF TESTS ACCRJMULA~ YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRF.~IVE ~ SLUMP DATE AGE LOAD b~FI~NGTH FRACTURE SET NO. (me~s) TF~FED (a*r~) (Ib~ force) (pd) TYPE 6 1 7.00 03/28/2000 7 114230 4040 6 2 7.00 03/28/2000 7 118600 4190 Average 4120 6 3 7.00 04/18/2000 28 142980 5060 6 4 7.00 04/1812000 28 151070 5340 Average 5200 0ILL This report is exclusively fix the use of the client indicated above and shall not be ~c~A--oduccd cXCel~ in full without the written aplwoval of HBC En~necrins, Inc. Paze~ ors CONCRETE COMPR IVE STRENGTH TES Date of Service: 03/21/2000 Report No.: Client No.: 85229000 Project No.: 0007655 94991457 Client: Transwestem Property Company Project: Atto: James Oaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRnCFOR: Butler Construction CONCRgTE SUPPLIER: Pioneer PLANT: 22 SVWCnnCaTION m~Qt~~ s'rlum~TH: 4000 psi @ 28 Days 5.0" Max N/A ASTM C- 143 ASTM C-172 ASTM C-39 SAMIn.~ LOCATION: 40' E x 50' S from NW comer PROJECT DATA ~u~.: 9349 ~A~ 9A~: 03/2112000 BATClt ~: 10:45am ~l~S~lm: 12:00pm aY: Steve Campbell WEATHER CONDmONS: TEMPERATURE (l~ - Am TaUCK NO: 1819 Am CONTENT (~): N/A PLACEMENT LOCATION: Cloudy 68 F concavity: 76 TIom'r No: 514606 utoT W~mHT (om: N/A Sample taken from trueL REPORT OF TESTS ACCUMULATIVEYARDS: 10 CYLINDER MFakSURED ~ COMPRESSIVE MABKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lb~ force) (psi) TYPE 7 1 6.50 03/2812000 7 134630 4760 7 2 6.50 03128/2000 7 128710 4550 Average 4660 7 3 6.50 04/18/2000 28 150820 5330 7 4 6.50 04/18/2000 28 154660 5470 Average 5400 0ILL This report is exclusively for the use of the cfient indicated above and shall not be reproduced except in full without the written tOpronl of HBC Engineering, Inc. Page 7 of 8 CONCRETE COMPREI IVE STRENGTH TES0 Date of Service: 03/2112000 Client No.: 85229000 Report No.: Project No.: 0007655 94991457 a ttivuton of'lFmmmn 8901 Cari~a~ gr~., SMm #100 DaOa~ T~ 7~7 ~0/2~ Client: Transwestem Property Company Project: Atto: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. : SLUMP: AIR: TEST METHOD: co~rrgAc'rom Butler Construction CONCRgFE SUPPLIER: Pioneer 22 srwcnnc~'noN ~v~ ~a~: ~ psi ~ 28 Days 5.0" M~ N/A AS~ C- 143 AS~ C-172 AS~ C-39 PROJECT DATA MIX gO.: 9349 PLn~ OXY: 03f21f2000 saTclt T~: 12:25pm xnugS~: hlSpm ~v: Steve Campbell WEATHER CONDITIONS: TEMPERATURE (g). Am TaUCKt~0: 1882 nm COnTn~ ('~): N/A PLA~ LOCATION: Cloudy 68 v CONCh: 77 F TIc~m'r NO: 529326 uio'r w~owr ~: N/A SAMPLE LOCATION: 15' E x 30' S form NW comer REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLRqDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 8 I 6.00 03/28/2000 8 2 6.00 03128/2000 AGE (day~) 134740 136310 Average 4760 4820 4790 8 3 6.00 04/1812000 8 4 6.00 04/18/2000 28 156320 148940 Average 5530 5270 Technician: Steve Campbell Report Distribution: (1) Transwestern Property Company (1) O'Brien & Associates (1) Technistmctures, Inc. (1) Butler Consmsction Started: 3:00am (1) City of Coppell (1) City of CoppeH ~ E~ng, Inc. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full wilhout lhe written approval of l-IBC Engineering, I~. OILL Page 8 or 8 REPORT OF DRILLED BELLED PIERS DalI~, Te~m Project: Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. B), Coppell, Texas 94991457 a~t No.: 0009373A O~ of S.rv~.e: 04/07/00 Technician: J. Smith' page: 1 of 1 ~ Pier Idenflflc-_fion A.6/11.5, Pier Diameter (in.) 24 Ball Diameter (in.) 54 Top of Pier Elevation (fi) 98.0 Req. Depth from E:~!=-.'_ Grade Ift) 18.0 Initial Depth of Pier from Existing Gm-de (It) 18.8 , Final Depth of Pier from Existing o~._~- <It) ~9.0 De~-'_.h from Top of Concrete (ft) 17.0 Condition of 8ottom (wet or dry) Dry C~ Plumb Within Tolerance (yes or no) Yes Casing Diameter (in) N/A ~"~..,,4 Depth (it) N/A Number of Vertical Barn (ea.) 6 Re;nforcing Bar Size (#) 6 Length of Ver:J_.c~_~ Bars (ft.) 16.5 Time Drilling was Completed 10:45 a.m. Time Concrete ~ Placed 11:12 a.m ....