Northlake 635(5)-LR000424CONCRETE COMPRI IVE STRENGTH TES
Date of Service: 04/13/2000
Client No.: 85229000
Report No.:
Project No.:
0009874
94991457
Report Date
04/24/2000
Client: Transwestem Property Company Project:
Atto: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Coppell Conunerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLIJMP:
AIR:
TEST METHOD:
cotqr~crom Butler Construction
CONCRETE SUPPLIER: Pioneer
P~r: 27
STmmaTm 4000 psi @ 28 Days
4-6"
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Panel g241
PROJECT DATA
M~X ~.: 9349
PLA~ DATE: 04/13/2000 sa~t T~E: 7:30am
Ta~ S~fln.~m: 8:10am s¥: Kevin Poston
WEATHER COND/TIONS:
TI~n~RATUi~ (1~ - Am
~UCKnO: 1807
Am CONTENT (~): 4.1
Cloudy
55 r coNc~-'m: 66 r
TIc~.-"r NO: 505912
vNrr w~mm' (~: N/A
PLA~ LOCATION:
Panels- Building "B" 254, 253, P-13, 249, 248, 247, P312, 243, 242, 241,240,239
Samp~d from truck.
REPORT OF TESTS
ACCUMULATIVEYARD8:10
CYLINDER M~ASURED MAXIMUM COMPRESSIVE
~ SLUMP DATE AGE LOAD ~TI~N~Tn FRACTURE
sgr NO. 0ne4~) TF, STED (days) 0b~ force) (psi) TYP~
1 1 4.50 04/20/2000 7 120600 4260
1 2 4.50 04/20/2000 7 120140 4250
Average 4260
I 3 4.50 05/11/2000 28
I 4 4.50 05/11/2000 28
0ILL
This ~=n:n't is exclusively for the use of the client indicated above and shall not be ~l~0duced excel~ in full without the written apploval of HBC En~L__~_' g+ Inc.
Pa~e I of 3
CONCRETE COMPR I STRENGTH TES
Date of Service: 04/13/2000
Client No.: 85229000
Client: Transwestem Property Company
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
a dt~on o. f'l~rr~um
Report No.: 0009874
Project No.: 94991457
!~ T~xas 7.,~A7
Report Date
04/2~
Project: Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
STRENGTH:
SLUMP:
Am:
TEST METHOD:
co~-ancroa: Buffer Construction
CONCRETE SUPPLIER: Pioneer
~t~t~r: 27
SPECIFICATION REQUmEMEN~
4000 psi @ 28 Days
4-6"
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
PROJECT DATA
~nXl.U.: 9349
PLACEMENT DATE:
T~m S~: 9:lSam
WEATl~R CONDmONS:
'mucz~o: 836
am co~r~r (~: 4.9
PL~~ LOCk.ON:
Seo l~ge I
04/1312000 nATCU T~M~: 8:30am
nv: Kevin Poston
Cloudy
55 F CONCa~T~: 64 v
~C~NO: 505~1
~ ~ ~: N/A
Sampled from track.
SAMPLE LOCATION: Panel 248
REPORT OF TESTS
ACCUMULATIV~ YARDS: 10
CYLINDER
MARKED
SET NO.
MEASURED MAXIMUM COMI~REsSIVE
SLUMP DATE AGE LOAD STRENGTH FRACTURE
(~e~) T~ST~D (days) ~ foree) (1~) TYP~
2 1 6.00 04/20/2000 7 107750 3810
2 2 6.00 04/20/2000 7 108830 3850
Average 3830
2 3 6.00 0511112000 28
2 4 6.00 05111/2000 28
01LL
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC F_~ngi.'~eerin~ Inc.
Pa~e 2 of 3
CONCRETE COMPRI IVE STRENGTH TES
Date of Service: 04/13/2000 Report No.: 0009874
Client No.: 85229000 Project No.: 94991457
89Ol Carpmter ltr~y., s~ #1~
II
II I
Report Date
Client: Transwestem Property Company Project:
Attn: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Coppell. Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SLUMP:
AIR:
TEST METHOD:
cotcrancroa: Butler Construction
CONCRETE SUPPLIER: Pioneer
PLn~fr: 27
SPECIFICATION REQUIREMFaN~
STm~C;TH: 4000 psi @ 28 Days
4-6"
3-5%
ASTM C-143
ASTM C-172
ASTM C-39
SAMPLE LOCATION:
Panel 8254
PROJECT DATA
M~X~.: 9349
ln,a~ DAT~: 04/1312000 BATCa ~: 10:00am
Tn~S~: 12:lSpm BY: Kevin Poston
WEATIIER CONDmON~: Cloudy
TEM~RATURE fi). Am 62 F CONCRETE: 71 F
TaUC~CnO: 103 T~C~mTNO: 501501
Am coh~r~rr (~): 4.1 UmT W~G~ ~: N/A
PLACEMENT LOCATION:
Seepage I
REPORT OF TESTS
ACCUMULkTIVE YARDS: 10
CYLINDER
MABKED
SET NO.
3 1 4.50
3 2 4.50
3 3 4.50
3 4 4.50
DATE
O4/20/20OO
04120/2000
05111/2000
05111/2000
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTll
(d~j~) ~ ~) (pa)
7 111740 3950
7 113080 4000
Average 3980
28
28
FRACTIJaE
TechnicS: Kevin Poston
Report Distribation:
(1) Tnmswe~tern Property Company
(1) O'Bri~ & Assocm~
(D TeclmisUuctures, Inc.
(1) Butler Comlmction
Started: 7:00am
(1) city of Coppell
(1) City of Coppell
Finished: l:OOpm
Paul D. Smith, P.E.
Senior Proj~t Engineer
0ILL
This w. pott is eXClusively for the use of the client indicated a/~ove and shall not be ~p~c~luced except in full without th~ wfitt~ approval of HBC Ea~ea'in~ Inc.
Page3 of 3