CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 92
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 10-11-99
ATTN: Mr. John Walsh TECHNICIAN: V. McManis
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number I Location i Ouantity Represented
1 Paving: 75'N. 140'E of NW Corner of Bldg. #3 70/420
2 Paving: 80'N. 200'E of NW Corner of Bldg. #3 150/420
3 Paving: 50'N. 140'W of NE Corner of Bldg. #3 250/420
4 Paving: 80'N. 70'W of NE Corner of Bldg. #3 350/420
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
. Lattimore 42 4000
Test Results
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8675 10-18-99 7 108250 3830
8675 11-08-99 28
8675 11-08-99 28
8675 Hold
2 8676 10-18-99 7 133690 4730
8676 11-08-99 28
8676 11-08-99 28
8676 Hold
3 8677 10-18-99 7 118070 4180
8677 11-08-99 28
8677 11-08-99 28
8677 Hold
4 8678 10-18-99 7 109190 3860
8678 11-08-99 28
8678 11-08-99 28
8678 Hold
Cylinder Data
Set iCytinder Time of Concrete ....Air ' Ticket
No. .ID ' '. Slump . Sample Air Temp. Temp. Entrainment Number
1 8675 6.50 3:50 AM 74 82 3.9 092852
2 8676 5.50 4:40 AM 74 83 3.6 7078314
3 8677 6.00 5:20 AM 74 85 4.4 7078324
4 7678 6.50 6:05 AM 75 84 4.5 7078334
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(I) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Englneering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
GEOTECHNICAL AND I:~ R I'--I i i F~
ENVlRONHENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 92
P.O. Box 802047 REG PROJECT NO. 5607
Dallas. Texas 75380-2047 SAMPLE DATE: 10-11-99
ATTN: Mr. John Walsh TECHNICIAN: V. McManis
CONTRACTOR: Westcliffe, Inc.
Location of Sample
Set Number I Location I Ouantit¥ Represented
1 Paving: 75'N. 140'E of NW Corner of Bldg. #3 70/420
2 Paving: 80'N, 200'E of NW Corner of Bldg. #3 150/420
3 Paving: 50'N. 140'W of NE Corner of Bldg. #3 250/420
! 4 Paving: 80'N, 70'W of NE Corner of Bldg. #3 350/420
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
Lattimore 42 4000
Test Results
Set ICylinderI Age@ I TotalLoad Compressive IAverageStrength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8675 10-18-99 7 108250 3830
8675 11-08-99 28 140550 4970
8675 11-08-99 28 148070 5240 5110
8675 Hold
2 8676 10-18-99 7 133690 4730
8676 11-08-99 28 146830 5190
8676 i 1-08-99 28 151440 5360 5280
8676 Hold
3 8677 10-18-99 7 118070 4180
8677 11-08-99 28 137900 4880
8677 11-08-99 28 148670 5260 5070
8677 Hold
4 8678 10-18-99 7 109190 3860
8678 11-08-99 28 157340 5570
8678 11-08-99 28 145980 5160 5370
8678 Hold
:;4;'4 STLJT2 DR Sd -E -'CC' · DA__AS -X 7-_;235 · -EL ~2'~'] 2fi:: .=.'.-.'=: · FAX :21.4': 352
Cylinder Data
Set I :Cylinder :l:' .l. Time°f '-J'cbncrete, :--Air-:- Ticket
NO- -' lid i.i: Slump..1 ....Sample AirTemp. Temp. E:.rttrainment Number
1 8675 6.50 3:50 AM 74 82 3.9 092852
2 8676 5.50 4:40 AM 74 83 3.6 7078314
3 8677 6.00 5:20 AM 74 85 4.4 7078324
4 7678 6.50 6:05 AM 75 84 4.5 7078334
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
F:=I I~: !~: ~'~
GEOTECI-NICAL AND I~i ~ 0 I I F=
E:q'-/IROI%,~=_~,TAL CO,%SU~TANTS ~
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 80
P.O. Box 802047 REPORT DATE: 10-11-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 09-17-99
TECHNICIAN: T. Be!ew
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: I Building 2 (751 Canyon Drive) Panels: P-38, P-39, P-42,
P-2, P-4, P-5, P-7, P-8, P-10, P-11, P-15 and P-13.
Reference Plans or Notes Used: I Structural drawings
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1)The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure dames F. Phipps, P.E.
(1) Campbell Associates/ JFP/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger