Loading...
121 BP Phase 1-LR 991011 GEO':'ECHNICA- .:,NE: ~ F=l ~ I I F= ENV ~.ONMENTAL CC%ISbL~-CNTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 92 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-11-99 ATTN: Mr. John Walsh TECHNICIAN: V. McManis CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location i Ouantity Represented 1 Paving: 75'N. 140'E of NW Corner of Bldg. #3 70/420 2 Paving: 80'N. 200'E of NW Corner of Bldg. #3 150/420 3 Paving: 50'N. 140'W of NE Corner of Bldg. #3 250/420 4 Paving: 80'N. 70'W of NE Corner of Bldg. #3 350/420 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. . Lattimore 42 4000 Test Results No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8675 10-18-99 7 108250 3830 8675 11-08-99 28 8675 11-08-99 28 8675 Hold 2 8676 10-18-99 7 133690 4730 8676 11-08-99 28 8676 11-08-99 28 8676 Hold 3 8677 10-18-99 7 118070 4180 8677 11-08-99 28 8677 11-08-99 28 8677 Hold 4 8678 10-18-99 7 109190 3860 8678 11-08-99 28 8678 11-08-99 28 8678 Hold Cylinder Data Set iCytinder Time of Concrete ....Air ' Ticket No. .ID ' '. Slump . Sample Air Temp. Temp. Entrainment Number 1 8675 6.50 3:50 AM 74 82 3.9 092852 2 8676 5.50 4:40 AM 74 83 3.6 7078314 3 8677 6.00 5:20 AM 74 85 4.4 7078324 4 7678 6.50 6:05 AM 75 84 4.5 7078334 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (I) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Englneering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger GEOTECHNICAL AND I:~ R I'--I i i F~ ENVlRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 92 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 10-11-99 ATTN: Mr. John Walsh TECHNICIAN: V. McManis CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Ouantit¥ Represented 1 Paving: 75'N. 140'E of NW Corner of Bldg. #3 70/420 2 Paving: 80'N, 200'E of NW Corner of Bldg. #3 150/420 3 Paving: 50'N. 140'W of NE Corner of Bldg. #3 250/420 ! 4 Paving: 80'N, 70'W of NE Corner of Bldg. #3 350/420 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 42 4000 Test Results Set ICylinderI Age@ I TotalLoad Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8675 10-18-99 7 108250 3830 8675 11-08-99 28 140550 4970 8675 11-08-99 28 148070 5240 5110 8675 Hold 2 8676 10-18-99 7 133690 4730 8676 11-08-99 28 146830 5190 8676 i 1-08-99 28 151440 5360 5280 8676 Hold 3 8677 10-18-99 7 118070 4180 8677 11-08-99 28 137900 4880 8677 11-08-99 28 148670 5260 5070 8677 Hold 4 8678 10-18-99 7 109190 3860 8678 11-08-99 28 157340 5570 8678 11-08-99 28 145980 5160 5370 8678 Hold :;4;'4 STLJT2 DR Sd -E -'CC' · DA__AS -X 7-_;235 · -EL ~2'~'] 2fi:: .=.'.-.'=: · FAX :21.4': 352 Cylinder Data Set I :Cylinder :l:' .l. Time°f '-J'cbncrete, :--Air-:- Ticket NO- -' lid i.i: Slump..1 ....Sample AirTemp. Temp. E:.rttrainment Number 1 8675 6.50 3:50 AM 74 82 3.9 092852 2 8676 5.50 4:40 AM 74 83 3.6 7078314 3 8677 6.00 5:20 AM 74 85 4.4 7078324 4 7678 6.50 6:05 AM 75 84 4.5 7078334 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger F:=I I~: !~: ~'~ GEOTECI-NICAL AND I~i ~ 0 I I F= E:q'-/IROI%,~=_~,TAL CO,%SU~TANTS ~ REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 80 P.O. Box 802047 REPORT DATE: 10-11-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-17-99 TECHNICIAN: T. Be!ew PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Building 2 (751 Canyon Drive) Panels: P-38, P-39, P-42, P-2, P-4, P-5, P-7, P-8, P-10, P-11, P-15 and P-13. Reference Plans or Notes Used: I Structural drawings X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure dames F. Phipps, P.E. (1) Campbell Associates/ JFP/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2'-24 S-J"rZ DA Sb'-E 4CC · DALLAS. TX 75235 * TE- ~2'.:] 350 56~' · F-'X [£~41 25.' ,-:Cig.