121 BP Phase 1-LR 991008 GEOTECHN!CAL.-'ND I~ ~ r-'l U F:m
F'xlv RONMFNTAL CONSULT.-' NTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 91
P.O. Box 802047 REG PROJECT NO. 5607
Dallas. Texas 75380-~2047 SAMPLE DATE: 10-08-99
ATTN: Mr. John Walsh TECHNICIAN: T. Stockdick
CONTRACTOR: Westcliffe. Inc.
Location of Sample
[ Set Number I Location I Quantity Represented
~ 1 Panels: #6. #9. #20. #24. Bldg. #2 10/60
I '
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
Lattimore 17 3500
Test Results
Set I CylinderI Age@ Total Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8619 10-15-99 7 104280 3690
8619 ! 1-05-99 28 132650 4690
8619 11-05-99 28 137090 4850 4770
8619 Hold
Cylinder Data
Set Cylinder Time of I Concrete I Air I Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 8619 5.50 7:10 AM 67 76 N/A 8093154
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
1) Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
1) City of Coppell/Building Inspections
1) City of Coppell/Engineering Dept.
1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
Z,:'.;4 STI.,TZ DR SU TE ,:33 · DALLAS -X -f:Z3f · TEL :214' 2.--.:~