Northlake 635(5)-LR000404CONCRETE COMPRE IVE STRENGTH TES )
Date of Service: 03/0612000 Report No.: 0006233
Client No.: 85229000 Project No.: 94991457
Report Date
04/04/2000
Client: Transwestem Property Company Project:
Atto: James Gaspard
12221 Merit Drive, g450
Dallas TX 75251
Coppell Commerce Center
1234 Lakeshore (Bldg. B)
Coppell, Texas'
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
SL~:
Am:
TEST METHOD:
CONTRACTOR: Butler Construction
CONCna'r~ sm'rLm~ Pioneer
t,~ter: 22
SPECIFICATION REQUIREblENTS
s~,~'m: 3000 psi @ 28 Days
5-7"
N/A
ASTM C- 143
ASTM C-172
ASTM C-39
SAMPLE LOCATXON: Piers M. 1/3.9, M/5 and M/4
PROJECT DATA
s~x to.: 9337
PLA~ DATE: 03/06]2000 BA'I'CH Tlb~: N/A
xn~s,o~t~: 3:18pm Isv: Roy Mol~t. gomery
w~'lltg~ CoNDmoNs: Clear
rg.M~g, aA~-am 78 it CONCagr~: 80 it
~tucs:No: 739 TICr, gTNO: 502566
amcoh-rv_a'vr(~,): N/A uNrrw~trr(pm: N/A
Iq,ACEM~ LOCATION:
Technician Tune: See RepoiX ~g}006232.
PdgPORT OF TESTS ACCtmVLATIVZ VAanS: 50
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inch.) TESTED
1 I 5.00 03113/2000
I 2 5.00 0311312000
I 3 5.00 04/03/2000
1 4 5.00 04/0312000
MAXIMUM COMPRESSIVE
AGE LOAD STRENGTH
(da~) 0In. f~rc~) (.mi)
7 91340 3230
7 102750 3630
Average 3430
28 166780 5900
28 167070 5910
Average 5910
Teclmiciam Roy Montgomery
Report Dim-iimfloa:
(I) Tnmw~m Propmy Company
(1) (Yafiea & A~cUm
(!) Technistructures, inc.
(D city of coppen
(t) city of cop~u
H~ Eng~ Inc.
Paul D. Smith, P.E.
Senior Project Engineer
(1) Butler Conslmction
This t~-,p~ is exclusively for Ihe use of Ihe client indicatedal~ove and shall not be t'el~:~haced ~~w~~~~~~'
01SS Page 1 of I