Loading...
121 BP Phase 1-LR 991007 GEOTECFINIC.:,L Ah, 3 ~ ~ []] U ~=m ENWqONMENTAL C~NSUL~'~ NTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 90 P.O. Box 80:2047 REG PROJECT NO. 5(307 Dailas. Texas 75380-2047 SAMPLE DATE: 10-07-99 ATTN: Mr. John Welsh TECHNICIAN: E. Rico CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 120'S. 800'W of NE Property Corner 10/580 2 Paving: 80'S. 760'W of NE Property Corner 110/580 3 Paving: 70'S. 650'W of NE Property Corner 210/580 4 Paving: 70'S. 590'W of NE Property Corner 320/580 5 Paving: 70'S. 500'W of NE Property Corner 420/580 6 Pawng: 90'S, 450'W of NE Property Corner 540/580 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 42 4000 Test Results Set I CylinderI Age(~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8533 ! 0-14-99 7 93150 3290 8533 I 1-04-99 28 114190 4040 8533 11-04-99 28 115860 4100 4070 8533 Hold 2 8534 10-14-99 7 89750 3170 8534 11-04-99 28 121230 4290 8534 11-04-99 28 124030 4390 4340 8534 Hold 3 8535 10-14-99 7 98040 3470 8535 11-04-99 28 122780 4340 8535 11-04-99 28 129650 4590 4470 8535 Hold 4 8536 10-14-99 7 90790 3210 8536 11-04-99 28 121420 4290 8536 11-04-99 28 114880 4060 4! 80 8536 Hold 2.4'2z ST~=TZ DR S~..If.L .:'ZZ · Z;,.LL'-S ;*, -~]~E - TFI. ]£'-:'. Z(;L L~.]:]. · :--'->. JV',:' 3L-- Set-cylinder-Ii ..... -- I Age@---ITotal:Loadl Cqmpressi~e l.AVerage. Strength No. ,-i.. tD :- Date Tested :''! .... Test lbs. ' Strength p.$;i, i p.s.i. 5 8537 10-14-99 7 118460 4190 8537 11-04-99 28 142750 5050 8537 11-04-99 28 141410 5000 5030 8537 Hold 6 8538 10-14-99 7 116000 4100 8538 11-04-99 28 145840 5160 8538 11-04-99 28 149180 5280 5220 8538 Hold Cylinder Data Set:ii[ 'Cylinder I :.;:.:.i::::.':i ii:.:?!me of -::-' Concrete::." Ail;: . '"1.:. Ticket No. "f -:-ID'::: Slump ......;Sample AirTemp. ' Temp. Entrainment-I ..Number. 1 8533 4.00 3:10 AM 63 68 N/A 3093044 2 8534 4.50 3:50 AM 64 68 N/A 3093052 3 8535 4.00 4:40 AM 63 69 N/A 3093061 4 8536 5.25 6:00 AM 64 69 N/A 3093067 5 8537 4.25 6:40 AM 65 70 N/A 7078185 6 8538 3.50 7:45 AM 66 70 N/A 7078192 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger GEOTECH%ICA- AND ~ I:==l r-'l I I ~ EN','!RON~ ENTA_ CONSULTAr,,TS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 77 P.O. Box 802047 REPORT DATE: 10-07-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-14-99 TECHNICIAN: B.Ray PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Foundation slab, building 5 (601 Canyon Drive) Reference Plans or Notes Used: I Structural drawings. i X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ JFP/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-"24 STU-Z DR SJ.TE .:.',S · D~.LLAS -x 75235 · -EL ]2'4] 353 58S2 · FAX [2'4] 352 0Olg-