Loading...
121 BP Phase 1-LR 991005 GEOTECHNIC^L AND i ~ [=1 I--1 I I p ENVI¢ONP1ENTAL CONSULTANTS i CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 89 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-05-99 ATTN: Mr. John Walsh TECHNICIAN: T. Stockdick CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 130'N. 65'E of NW Corner of Bldg. #3 30/585 2 Paving: 140'N. 210'E of NW Corner of Bldg. #3 120/585 3 Pawng: 145'N. 130'W of NE Corner of Bldg. #3 230/585 4 Pawng: 130'N. 45'E of NW Corner of Bldg. #4 340/585 5 Paving: i45'N. 255'E of NW Corner of Bldg. #4 420/585 6 Paving: 140'N. 120'W of NE Corner of Bldg. #4 530/585 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 42 4000 Test Results Set I CylinderI Agel~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8459 10-12-99 7 113040 4000 845§ 11-02-99 28 8459 ! 1-02-99 28 8459 Hold 2 8460 10-12-99 7 121900 4310 8460 11-02-99 28 8460 11-02-99 28 8460 Hold 3 8461 10-12-99 7 125250 4430 8461 11-02-99 28 8461 11-02-99 28 8461 Hold 4 8462 10-12-99 7 113810 4030 8462 11-02-99 28 8462 11-02-99 28 8462 Hold 5 8463 10-12-99 7 146220 5170 8463 11-02-99 28 8463 11-02-99 28 8463 Hold 2-~2.4 STUTZ DR SUITE 47.7. · .~ALLAS TX -E23£ · TEL [£'.;' 35. C ~-.-.-3~ · FAX ~2.'4~ 35.'--.' 5£,'.c., 6 8464 10-12-99 7 127080 4500 8464 11-02-99 28 8464 11-02-99 28 8464 Hold Cylinder Data ;:i-Set :I :'Cy!!nde~!::!:'l:' '';'':; .... l:"?ime°f ] ':' :i!;t::i;'c°n~ete ]':;;i;IA]!~::;i::i' '::;] ::Ticket :.iii~qo. ii :::::ID' ::!.: ] SlumP~ ::1 ].sample- AirTemp. 1]:. Temp. .Entrainment]:. '"Number:. 1 8459 5.50 3:10 AM 56 80 N/A 3092888 2 8460 5.00 4:05 AM 56 78 N/A 3092897 3 8461 5.00 5:10 AM 54 74 N/A 3092912 4 8462 5.50 6:10 AM 58 74 N/A 3092920 5 8463 5.00 7:00 AM 54 74 N/A 3092928 6 8464 5.50 8:25 AM 61 74 N/A 3092943 Distribution: (1) The industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger GEOTECHNICAL AL]. ~ ~ I--'1 ENV RONMENTALCONSU-T~NTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 89 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 10-05-99 ATTN: Mr. John Walsh TECHNICIAN: T. Stockdick CONTRACTOR: Westcliffe. !nc. Location of Sample Set Number I Location I Quantity Represented 1 Paving: 130'N. 65'E of NW Corner of Bldg. #3 30/585 2 Paving: 140'N. 210'E of NW Corner of Bldg. #3 120/585 3 Paving: 145'N. 130'W of NE Corner of Bldg. #3 230/585 4 Paving: 130'N. 45'E of NW Corner of Bldg. #4 340/585 5 Paving: 145'N. 255'E of NW Corner of Bldg. #4 420/585 6 Paving: 140'N. 120'W of NE Corner of Bldg. #4 530/585 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 42 4000 Test Results Set ICylinder1 Age@ TotalLoad Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 8459 10-12-99 7 113040 4000 8459 11-02-99 28 133090 4710 8459 11-02-99 28 133730 4730 4720 8459 Hold 2 8460 10-12-99 7 121900 4310 3460 ! 1-02-99 28 !53280 5420 8460 11-02-99 28 158920 5620 5520 8460 Hold 3 8461 10-12-99 7 125250 4430 8461 11-02-99 28 150980 5340 8461 11-02-99 28 155600 5500 5420 8461 Hold 4 8462 10-12-99 7 113810 4030 8462 11-02-99 28 131290 4640 8462 11-02-99 28 135370 4790 4720 8462 Hold 5 8463 10-12-99 7 146220 5170 8463 11-02-99 28 170490 6030 8463 11-02-99 28 173070 6120 6080 8463 Hold EcZ'c' S'J?Z ~R SU'--- 4_'2_'2 No. tD Tested.. Test lbs. . Strength P.Sii. p.s.i. 6 8464 10-12-99 7 127080 4500 8464 11-02-99 28 148270 5240 8464 11-02-99 28 151110 5340 5290 8464 Hold Cylinder Data set: ;Cylinder : Time of --: :- I Concrete' -Air .. Ticket No. :.' iD -:.i 'Slump Sample Air TemP;: ': Temp. En'~tainm'e'nti .Number 1 8459 5.50 3:10 AM 56 80 N/A 3092888 2 8460 5.00 4:05 AM 56 78 N/A 3092897 3 8461 5.00 5:10 AM 54 74 N/A 3092912 4 8462 5.50 6:10 AM 58 74 N/A 3092920 5 8463 5.00 7:00 AM 54 74 N/A 3092928 6 8464 5.50 8:25 AM 61 74 N/A 3092943 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1 Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1 The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1 Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger