121 BP Phase 1-LR 991005 GEOTECHNIC^L AND i ~ [=1 I--1 I I p
ENVI¢ONP1ENTAL CONSULTANTS i
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 89
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 10-05-99
ATTN: Mr. John Walsh TECHNICIAN: T. Stockdick
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 130'N. 65'E of NW Corner of Bldg. #3 30/585
2 Paving: 140'N. 210'E of NW Corner of Bldg. #3 120/585
3 Pawng: 145'N. 130'W of NE Corner of Bldg. #3 230/585
4 Pawng: 130'N. 45'E of NW Corner of Bldg. #4 340/585
5 Paving: i45'N. 255'E of NW Corner of Bldg. #4 420/585
6 Paving: 140'N. 120'W of NE Corner of Bldg. #4 530/585
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
Lattimore 42 4000
Test Results
Set I CylinderI Agel~ Total Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8459 10-12-99 7 113040 4000
845§ 11-02-99 28
8459 ! 1-02-99 28
8459 Hold
2 8460 10-12-99 7 121900 4310
8460 11-02-99 28
8460 11-02-99 28
8460 Hold
3 8461 10-12-99 7 125250 4430
8461 11-02-99 28
8461 11-02-99 28
8461 Hold
4 8462 10-12-99 7 113810 4030
8462 11-02-99 28
8462 11-02-99 28
8462 Hold
5 8463 10-12-99 7 146220 5170
8463 11-02-99 28
8463 11-02-99 28
8463 Hold
2-~2.4 STUTZ DR SUITE 47.7. · .~ALLAS TX -E23£ · TEL [£'.;' 35. C ~-.-.-3~ · FAX ~2.'4~ 35.'--.' 5£,'.c.,
6 8464 10-12-99 7 127080 4500
8464 11-02-99 28
8464 11-02-99 28
8464 Hold
Cylinder Data
;:i-Set :I :'Cy!!nde~!::!:'l:' '';'':; .... l:"?ime°f ] ':' :i!;t::i;'c°n~ete ]':;;i;IA]!~::;i::i' '::;] ::Ticket
:.iii~qo. ii :::::ID' ::!.: ] SlumP~ ::1 ].sample- AirTemp. 1]:. Temp. .Entrainment]:. '"Number:.
1 8459 5.50 3:10 AM 56 80 N/A 3092888
2 8460 5.00 4:05 AM 56 78 N/A 3092897
3 8461 5.00 5:10 AM 54 74 N/A 3092912
4 8462 5.50 6:10 AM 58 74 N/A 3092920
5 8463 5.00 7:00 AM 54 74 N/A 3092928
6 8464 5.50 8:25 AM 61 74 N/A 3092943
Distribution: (1) The industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
GEOTECHNICAL AL]. ~ ~ I--'1
ENV RONMENTALCONSU-T~NTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 89
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 10-05-99
ATTN: Mr. John Walsh TECHNICIAN: T. Stockdick
CONTRACTOR: Westcliffe. !nc.
Location of Sample
Set Number I Location I Quantity Represented
1 Paving: 130'N. 65'E of NW Corner of Bldg. #3 30/585
2 Paving: 140'N. 210'E of NW Corner of Bldg. #3 120/585
3 Paving: 145'N. 130'W of NE Corner of Bldg. #3 230/585
4 Paving: 130'N. 45'E of NW Corner of Bldg. #4 340/585
5 Paving: 145'N. 255'E of NW Corner of Bldg. #4 420/585
6 Paving: 140'N. 120'W of NE Corner of Bldg. #4 530/585
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
Lattimore 42 4000
Test Results
Set ICylinder1 Age@ TotalLoad Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8459 10-12-99 7 113040 4000
8459 11-02-99 28 133090 4710
8459 11-02-99 28 133730 4730 4720
8459 Hold
2 8460 10-12-99 7 121900 4310
3460 ! 1-02-99 28 !53280 5420
8460 11-02-99 28 158920 5620 5520
8460 Hold
3 8461 10-12-99 7 125250 4430
8461 11-02-99 28 150980 5340
8461 11-02-99 28 155600 5500 5420
8461 Hold
4 8462 10-12-99 7 113810 4030
8462 11-02-99 28 131290 4640
8462 11-02-99 28 135370 4790 4720
8462 Hold
5 8463 10-12-99 7 146220 5170
8463 11-02-99 28 170490 6030
8463 11-02-99 28 173070 6120 6080
8463 Hold
EcZ'c' S'J?Z ~R SU'--- 4_'2_'2
No. tD Tested.. Test lbs. . Strength P.Sii. p.s.i.
6 8464 10-12-99 7 127080 4500
8464 11-02-99 28 148270 5240
8464 11-02-99 28 151110 5340 5290
8464 Hold
Cylinder Data
set: ;Cylinder : Time of --: :- I Concrete' -Air .. Ticket
No. :.' iD -:.i 'Slump Sample Air TemP;: ': Temp. En'~tainm'e'nti .Number
1 8459 5.50 3:10 AM 56 80 N/A 3092888
2 8460 5.00 4:05 AM 56 78 N/A 3092897
3 8461 5.00 5:10 AM 54 74 N/A 3092912
4 8462 5.50 6:10 AM 58 74 N/A 3092920
5 8463 5.00 7:00 AM 54 74 N/A 3092928
6 8464 5.50 8:25 AM 61 74 N/A 3092943
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1 Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1 The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1 Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger