Loading...
121 BP Phase 1-LR 991001 GEOTECHNiC~L A",,D ~ F~ r'-i I I F=~ ENV RONMENTAL CONSULT-' 'xlTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 86 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 10-01-99 ATTN: Mr. John Walsh TECHNICIAN: T. Stockdick CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Panel #20. Bldg. #3 30/120 2 Panel #37, Bldg. #3 110!120 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 17 3500 Test Results Set I Cy,,nderI IAgo@Test Total Loadi Compressive Average Strength No. ID Date Tested lbs. Strength p.s.i, p.s.i. I 8291 10-08-99 7 112490 3980 8291 10-29-99 28 132080 4670 8291 10-29-99 28 134530 4760 4720 8291 Hold 2 8292 10-08-99 7 108780 3850 8292 10-29-99 28 134990 4770 8292 10-29-99 28 134170 4750 4760 8292 Hold Cylinder Data Set i Cyiinder i Timeof i i Concrete [ Air i Ticket No. ID Slump Sample Air Temp. Temp. Entrainment ~ Number 1 8291 5.00 5:25 AM 48 79 N/A 3092734 2 8292 5.00 6:40 AM 52 74 N/A 3092743 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ Mr. Bennett Foster REED ENGINEERING GROUP, INC. (1) Westcliffe. Inc./Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr. Randy Pliler (1) City of Coppell/Building Inspections KEA/sa/rt (1) City of Coppell/Engineermg Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger Z-'Z4 STI_-Z DR S[.' -E ':3"