Loading...
121 BP Phase 1-LR 990929 GEOTECHNiCAL AND ENV.RONHENTAL CONSULTANTS REPORT OF FOOTING OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 44 P.O. Box 802047 REPORT DATE: 09-29-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. JohnWalsh TECHNICIAN: B. Ray PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Required Footing Actual Footing Footing Footing Size Thickness Thickness ' Date Pier No. Type (inches)- (inches) 08-10-99 A-17.5 F-4 48x48 24 26 B-17.5 F-4 48x48 24 27 B.2-19 F-4 48x48 24 28 B.2-20 F-4 48x48 24 28 D.8-19 F-4 48x48 24 26 D.8-20 F-4 48x48 24 26 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STbTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [214~ 350 5600 · FAX [2;4] 350 0019