121 BP Phase 1-LR 990928 GEOTECHNICAL AND J~ ~ r-'l i i F=
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 85
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 09-28-99
ATTN: Mr. John Walsh TECHNICIAN: D. Rico
CONTRACTOR: Westcliffe, Inc.
Location of Sample
Set Number t Location I Quantity Represented
1 Bldg. #3, Panel P-52 10/150
2 Bldg. #3, Panel P-5 100/150
3 Bldg.#3, Panel P-10 150/150
Design Information
Source of Concrete J Mix Identification J Specified Strength p.s.i.
Lattimore 30495-1 3500
Test Results
set J Cy,inder1 Age{~ Total Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8139 10-05-99 7 104190 3690
i 8139 10-26-99 28
! 8139 10-26-99 28
8139 Hold
8139 Hold
2 8140 10-05-99 7 97210 3440
8140 10-26-99 28
8140 10-Z6-99 28
8140 Hold
8140 Hold
3 8141 10-05-99 7 103900 3680
8141 10-26-99 28
8141 10-26-99 28
8141 Hold
8141 Hold
2z24 STU-Z DR · SU--E 433 · DALLAS -X 7'~23-: * ~EL ]214
Cylinder Data
NO~ .~:i' iD: :;;il:"StumP::~ .:~Sample AirTemp. 1" Temp. :-Eh~rainment'. ;' Number
1 8139 4.00 6:00 AM 75 80 N/A 7077688
2 8140 5.00 7:00 AM 74 76 N/A 7077694
3 8141 4.00 8:15 AM 76 83 N/A 7077703
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac "" ......
,v,~,,u,~ Keith E. Atkins
(1) Campbell Associates/ KEA/sa
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
Cylinder Data
Set:::: '
No.-I-;CYtinder:~::::: iD:~:;;, t' ....... ::sidmp... ] Time:of;i::iti:i:::i: ......... Concrete;::l: :Air :-- . Ticket-
- '-:sainpje;!:':'l::Ai~riTemp- I Temp.:::-:l:iEntrainmen~: Number:
1 6859 6.00 03:25 AM 83 90 N/A 3090221
2 6860 5.75 04:20 AM 79 89 N/A 3090231
3 6861 5.75 05:30 AM 79 89 N/A 3090241
4 6862 6.00 06:20 AM 80 90 N/A 3090252
5 6863 6.00 07:40 AM 81 91 N/A 3090267
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/meb/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
GEOTECHNICAL A%T; I~ ~ r-'l I I F::
Elx, v~ R ON M EN'~A L CO'~ISUL-~ NTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 85
P.O. Box 802047 REG PROJECT NO. 5607
Dallas. Texas 75380-2047 SAMPLE DATE: 09-28-99
ATTN: Mr. John Walsh TECHNICIAN: D. Rico
CONTRACTOR: Westciiffe. Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Bldg. #3. Panel P-52 10/150
2 Bldg. #3. Panel P-5 100/150
3 Bldg.#3. Panel P-10 150/150
Design Information
Source of Concrete I Mix Identification Specified Strength p.s.i.
~ Lattimore 30495-1 3500
Test Results
Set CylinderI I Age @ I Total Load Compressive Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8139 10-05-99 7 104190 3690
8139 10-26-99 28 123950 4380
8139 10-26-99 28 118710 4200 4290
8139 Hold
8139 Hold
2 8140 10-05-99 7 97210 3440
8140 10-26-99 28 119560 4230
8140 10-26-99 28 111400 3940 4090
8140 Hold
8140 Hold
3 8141 10-05-99 7 103900 3680
8141 10-26-99 28 110590 3910
8141 10-26-99 28 115200 4070 399,0
8141 Hold
8141 Hold
Cylinder Data
Set 'I Cylinder i i Time:of ' Concrete '"i Air i ' Ticket
No. ID ': I Slump Sample i AirTemp. Temp. i'Entrainment i Number
1 8139 4.00 6:00 AM 75 80 N/A 7077688
2 8140 5.00 7:00 AM 74 76 N/A 7077694
3 8141 4.00 8:15 AM 76 83 N/A 7077703
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westc!iffe. Inc./Mr. Charfie Johnson Origina! Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspecbons
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger