121 BP Phase 1-LR 990927 (~EOTECHNICALAND I J~ F~ I'-1 I I F=~
ENV.',KONMENTAL CONSULTANTS
I
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 74
P.O. Box 802047 REPORT DATE: 09-27-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 09-01-99
TECHNICIAN: F. Steadman
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Items Observed: I Footings: B-3.5, B-5.5 and B-6.5, building 5.
Reference Plans or Notes Used: I Sheet $1.02
I X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/je
Mr. Randy Piiler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
;424 STUTZ DR. · SJITE 400 · DALLAS TX 75235 · VEL [214] 350 5600 · =AX [214] 350 0019
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 75
P.O. Box 802047 REPORT DATE: 09-27-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 09-03-99
TECHNICIAN: F. Steadman
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: J Building 5 grade beam: line B between 2 and 10, line
10 between B and E and line E between 8 and 10.
J Reference Plans or Notes Used: J Sheets S3.01 and S3.02
X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KAJje
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STUTZ DR. · SGITE 400 · DALLAS. TX 75235 · TEL .'214] 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND i I~ F;I ~ LJ P
ENYH~ONMENTAL CONSULTANTS I
REPORT Of REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 73
P.O. Box 802047 REPORT DATE: 09-27-99
Dailas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 08-31-99
TECHNICIAN: V. McManis
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
I Items Observed: J Building 5: Footings, Line E to E.9 between 5.5 and 6.5.
and line B.2 from 1 to 2.
J Reference Plans or Notes Used: J Structural drawings.
X Jthere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2-'24 STUtZ DR. · SUITE 400 · DALLAS. -X 75235 · TE- [214.] 350 5600 · FAX '.214.1 350 0019 :
GEOTECHNICALAND J G F;J r-1 U F=
ENVIRONMENTAL CONSULTANTS',
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 70
P.O. Box 802047 REPORT DATE: 09-27-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 08-23-99
TECHNICIAN: F. Steadman
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: J Grade beam line 2 to 12.5, building 4.
J Reference Plans or Notes Used: J Sheet S3.01
J X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2'~24 STUTZ DR. · SUITE 400 · DALL/,.S TX 75235 · -EL [214] 350 5600 · FAX [214] 350 0019
GEOTECHNICAL AND J~J F;;J I"-I I I F~
ENVh~ONP1ENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 71
P.O. Box 802047 REPORT DATE: 09-27-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 08-25-99
TECHNICIAN: H. Johnson
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: J Building 4 (651 Canyon Drive) Grade beam: line B
from 12 to 19 and line E from 12 to 13.
Building 4 floor slab: line B to E between 1 and 10.
J Reference Plans or Notes Used: J Sheet S3.01
J X JThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
24':,4 STUTZ DR. · SUITE 400 · DALLAS TX 75235· -PLo [214] 350 ~0C. · FAX [2t4] 350 00J9
GEOTECHNiCAL AND ~ F:;J I'-1 L.J P
ENVIRONMENTAL CONSULTANTS ,
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 72
P.O. Box 80204? REPORT DATE: 09-27-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 08-30-99
TECHNICIAN: F. Gomez
PAGE: I of 1
CONTRACTOR: Westcliffe, Inc.
J Items Observed: I Building 4 grade beam line 19 between B and E.
J Reference Plans or Notes Used: J Sheet S1.04
J List Deviations Noted: J Wood blocks were being used as chairs.
The noted deviations were reported to: General Contractor
I X IThe noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Welsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Chadie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 * TEL [214] 350 5600 · FAX [2J4] 350 0019