Loading...
121 BP Phase 1-LR 990927 (~EOTECHNICALAND I J~ F~ I'-1 I I F=~ ENV.',KONMENTAL CONSULTANTS I REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 74 P.O. Box 802047 REPORT DATE: 09-27-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-01-99 TECHNICIAN: F. Steadman PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Footings: B-3.5, B-5.5 and B-6.5, building 5. Reference Plans or Notes Used: I Sheet $1.02 I X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Piiler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ;424 STUTZ DR. · SJITE 400 · DALLAS TX 75235 · VEL [214] 350 5600 · =AX [214] 350 0019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 75 P.O. Box 802047 REPORT DATE: 09-27-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 09-03-99 TECHNICIAN: F. Steadman PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Building 5 grade beam: line B between 2 and 10, line 10 between B and E and line E between 8 and 10. J Reference Plans or Notes Used: J Sheets S3.01 and S3.02 X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KAJje Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SGITE 400 · DALLAS. TX 75235 · TEL .'214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND i I~ F;I ~ LJ P ENYH~ONMENTAL CONSULTANTS I REPORT Of REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 73 P.O. Box 802047 REPORT DATE: 09-27-99 Dailas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-31-99 TECHNICIAN: V. McManis PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. I Items Observed: J Building 5: Footings, Line E to E.9 between 5.5 and 6.5. and line B.2 from 1 to 2. J Reference Plans or Notes Used: J Structural drawings. X Jthere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-'24 STUtZ DR. · SUITE 400 · DALLAS. -X 75235 · TE- [214.] 350 5600 · FAX '.214.1 350 0019 : GEOTECHNICALAND J G F;J r-1 U F= ENVIRONMENTAL CONSULTANTS', REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 70 P.O. Box 802047 REPORT DATE: 09-27-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-23-99 TECHNICIAN: F. Steadman PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Grade beam line 2 to 12.5, building 4. J Reference Plans or Notes Used: J Sheet S3.01 J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2'~24 STUTZ DR. · SUITE 400 · DALL/,.S TX 75235 · -EL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND J~J F;;J I"-I I I F~ ENVh~ONP1ENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 71 P.O. Box 802047 REPORT DATE: 09-27-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-25-99 TECHNICIAN: H. Johnson PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Building 4 (651 Canyon Drive) Grade beam: line B from 12 to 19 and line E from 12 to 13. Building 4 floor slab: line B to E between 1 and 10. J Reference Plans or Notes Used: J Sheet S3.01 J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 24':,4 STUTZ DR. · SUITE 400 · DALLAS TX 75235· -PLo [214] 350 ~0C. · FAX [2t4] 350 00J9 GEOTECHNiCAL AND ~ F:;J I'-1 L.J P ENVIRONMENTAL CONSULTANTS , REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 72 P.O. Box 80204? REPORT DATE: 09-27-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-30-99 TECHNICIAN: F. Gomez PAGE: I of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: I Building 4 grade beam line 19 between B and E. J Reference Plans or Notes Used: J Sheet S1.04 J List Deviations Noted: J Wood blocks were being used as chairs. The noted deviations were reported to: General Contractor I X IThe noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Welsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Chadie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 * TEL [214] 350 5600 · FAX [2J4] 350 0019