121 BP Phase 1-LR 990925 GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS ,
REPORT OF FOOTING OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 56
P.O. Box 802047 REPORT DATE: 09-25-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh TECHNICIAN: E. Rico
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Building 4 (651 Canyon Drive)
Footing Footing Footing Size Required Actual Footing
Date Line. Type (inches) Footing Thickness
Thickness (inches)
(inches)
08-17-99 E-3.5 F-4 48x48 24 26.0
E.9-3.6 F-4 48x48 24 26.0
E-7.5 F-4 48x48 24 25.5
E.9-7.4 F-4 48x48 24 24.5
E-9 F-4 48x48 24 24.0
E.9-9.1 F-4 48x48 24 24.5
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/]e
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2424 STL;TZ DR · SUITE 400 · DALLAS. TX 752]5 · TEL [2'4] 350 5600 · FAX [214] 350 0019