121 BP Phase 1-LR 990924 GEOTECH N~C.-' ~. AND
ENVIrONMENTaL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 81
P.O. Box 802047 REG PROJECT NO. 5607
Dallas. Texas 75380-2047 SAMPLE DATE: 09-24-99
A-FTN: Mr. John Welsh TECHNICIAN: T. Stockdick
CONTRACTOR: Westcliffe, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Panel #19 Bldg. #2 40/110
2 Panel #35. Bldg. #2 110/110
Design Information
Source of Concrete I Mix Identification I
Specified
Strength
p.s.i.
Lattimroe 17 3500
Test Results
Set ICylinderI Age@ TotalLoadt Compressive Average Strength
No. , ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8017 10-01-99 7 97790 3460
8017 10-22-99 28 113370 4010
8017 10-22-99 28 126790 4480 4250
8017 Hold
2 8018 10-01-99 7 117790 4170
8018 10-22-99 28 142870 5050
8018 10-22-99 28 140000 4950 5000
8018 Hold
Cylinder Data
Set I Cylinder Time of I Concrete I Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 8017 5.00 5:30 AM 62 79 N/A 3092318
2 8018 5.00 6:50 AM 62 79 N/A 7077556
Distribution: ~1'i The Industrial Gro,~,~.' Submitted by:
Mr John Walsh
(1 i Gromatzky Dupree & Associa:es:
Mr. Bennett Fester REED ENGINEERING GROUP, INC.
(1 '~ ~,^Jestcliffe. Inc./Mr. Charlie Jo-nson
(li The Iqdustrial Group:
Mr Mac McClure Original Signed By
( ' 'i Campbell Associates,'
M'. Randy Pliler Keith E. Atkins
~1: C~ty os Coppe!::Building Inspections
(1: City os Coppei;:Engineering Dept. KEA/sa/rt
( 1 ') Bear Creek Construction..'
Mr. Brian Holdgate
(1~ Mr. Hank Metzger
":::,: ST-L.-Z DR SJITE -:2': · -~,",--..~ TX 7~£'."~ · '"EL [£'z1 3~=L ~.!!1:2 · FAX ~:~'-'~ 2C.£' ?F')
GEOTECHNICAL AND ~ F:~ ~ U P
ENV?,ONP1ENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 81
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 09-24-99
ATTN: Mr. John Welsh TECHNICIAN: T. Stockdick
CONTRACTOR: Westcliffe, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Panel #19, Bldg. #2 40/110
2 Panel #35, Bldg. #2 110/110
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Lattimroe 17 3500
Test Results
set t Cyii"derI I ^ge~ I Tote'Load Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 8017 10-01-99 7 97790 3460
8017 10-22-99 28
8017 10-22-99 28
8017 Hold
I 2 8018 10-01-99 7 117790 4170
8018 10-22-99 28
8018 10-22-99 28
8018 Hold
CyliP, der Data
~e,I Cylinder I Time ofI I Concrete Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 8017 5.00 5:30 AM 62 79 N/A 3092318
2 8018 5.00 6:50 AM 62 79 N/A 7077556
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Welsh
(1) Gromatzky Dupree & Associates/
Mr. Bennett Foster REED ENGINEERING GROUP, INC.
(1) Westcliffe, Inc./Mr. Charlie Johnson
(1) The Industrial Group/
Mr. Mac UcClure Original Signed By
(1) Campbell Associates/
Mr. Randy Pliler Keith E. Atkins
(1) City of CoppelllBuilding Inspections
fl l City of Coppell/Engineering Dept. KEA/sa
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1'.) Mr. Hank Metzger
2424 STUTZ DR · Sd -r= 4CC · DALLAS -X 75235 · TEL ]2'4] 35" 55--.-. · FAX ]214; 35Z :.~.'~