Loading...
Northlake 635(5)-LR000317DEPORT OF DRILLEI~ELLED PIER INSPEG~ON Date of Service: 03/09/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 SerViCeB: Drilled belled pier inspection. ,>1~ a div[sion ojl~irraoon 8901 Carpenter' Fl'w7-,Suite 8100 Report No.: 0006584 Project No.: 94991457 Report Date 03/17/2000 Project: Coppeil Coaunercx Center 1234 Lakeshore (Bldg. B) Coppell, Texas On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. NOTE: Existing grade was excavated before piers were drilled. Technician Time: 6:30 a.m. to 5:00 p.m. Technician: Roy Montgomery ~ En ' InC. ILeport Distribution: tt> Transvvestpa Y Company (t) city of Coppeu Paul D. Smith, P.E. (I) O'Brien 8c Associates (1) City of Coppell Senior Proja~ Engroeer (t) Technistruetures, Inc. (1) ButlerCoastruction This ropcxt is exclusively for the use of dw cheat indicated above and shall act be reproduced except in full W'it6twt die writoea ap@ro~1 ~ I{BC af• ~' 99S~ Palle 1 of 1 W a W J W D W J LL O 0 W 8 a~ 0 ~ g ~ ~ o o a: a W Z t ~' ~~ x 0 ~b~.yyA i~ ~~ ~ ~ ~~ U a ~ U .~ o U ,~ ~ ~~ ~a ~ U Z O a ,~' d N ~ 3 S p S p O p S ~ ~ ~ ~ ~ °Q' E E } T g ~ a N N ~n T ,~ ~ a ~ m z ~ In ~ ~A 8 ~A r ~ m } a ~ a ~ ~ ~ ~ ~ E ~ ~ E a ~ ~e N ~ r .- r r- ~- U m ~ i+i ~ `- N ~ a ~ °' Z m r~~, N ~ ~ } a ~ a ~ ~ ~ ~ ~ ~° E r ~ r r r ~ M N m (n C c~i ~n ~ ~ a m z m ° S ~ ~ ~ a ~ a ~ ~ ~ ~ £ ~° E N ~ ~ r r ~ } T ~ ~ m (~ ~ ~ T N ~ a ~ Z g C v 0 g G ~ ~ } a ~ a ~ ~ m ~ ~ W a ~r f r t r < T ~ r N a r ~, ~ a ~ Z g °~i, $ ~ ~ ~ ~ ~ ~ E W ~ bpd ~ a N ~ r r r } r ~ N ~ ~ ~ ~ g' 0 c 0 m a .o ~ ~ ~ ~ ~ o ~ ~ c ~ °~ ~ ~ ~ a c a ~ , , v L° c ~ o~ V a ~° _ c v _ c v p ~ o a. Y.. ~ a ~ ~ m m o ~ ~ V ~ ~ ~ ~ ~ ~ ; ~ o ~ ~ C ~ ~ ~ c ~ p m m w m ~ m a ~. ~ a~ ~ ~ ~ C ~ w ~ O ~ ~ ~ o p p C w a a ~ ~ ~ E • o a a m p ~ ~~ a ~ a 3 z o~'c O F F ~ c~ CONCRETE COMPRE~'~IVE STRENGTH TEST ENGINEERING', INC. a division of ~~frBC017 8901 Carpenter Frwy., Suite #100 Daltas, Texas 75247 Re ort No.: 0004448 Report Date Date of Service: 02/15/2000 p 03/17/2000 Client No.: 85229000 Client: 'Transwestern Property Company Attn: James Gaspard 12221 Merit. Drive, #450 Dallas TX 75251 Project No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS sTRENGTII: 4000 psi @ 28 Days SLUMP: S.O~~ M3X AIR: 3-5°I~ TEST METHOD: ASTM 0-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location 1,llx I.D.: 9351 PLACEMENT DATE: O2I1S/2000 BATCH TrnIE: 4:45am TIME sAMPLED: S:15am BY: Steve Campbell wEATIIER CONDITIONS: TEMPERATURE (F) -AIR TRUCK NO: 842 AIR CONTENT (%): 8.O YLACENIENT LOCATION: Paving/ south of slab See attached sketch. REPORT OF TESTS CYLINDER MEASURED D'IARKED SLUMP SET NO. (inches) 1 1 1 1 1 6.00 2 6.00 3 6.00 4 6.00 Clear 4S F CONCRETE: S6 F TICKET NO: 503428 UNIT WEIGHT (pcf): l~l/A ACCUMULATIVE YARDS: lO MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (Ibs. force) (psi) TYPE 02/22/2000 7 81070 2870 02/22/2000 7 84810 3000 Average 2940 03/14/2000 28 102530 3630 03/14/2000 28 101480 3590 Average 3610 a~ ~~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HI3C Engineering, Inc. GILL Yage I of 3 CONCRETE COMPRE~'~IVE STRENGTH TES''' ENGINEERING, INC. a division ojl(erfacort 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Re ort No.: 0004448 Report Date Date of Service: 02/1S/2000 p 03/17/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #4S0 Dallas TX 7S2S1 PROJECT DATA CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: S.O~~ M1X AIR: 3-S% "PEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: CYLINDER MARKED SET NO. 2 1 2 2 2 2 3 4 See page 1 MEASUKED SLUMP (inches) 7.00 7.00 7.00 7.00 PLACEMENT DATE: O2/1S/2000 BATCH TIME: 4:SSam 1'mIE SAMPLED: 6:OOam BY: Steve Campbell WEATHER CONDITIONS: Clear TEMPERATURE (F) -AIR 4S F CONCRETE: SS F TRUCK NO: 847 TICKET NO: SO3434 AIR CONTENT (°Io): 7.75 UNIT WEIGHT (pcf): l~l/A PLACEMENT LOCATION: See page 1 REPORT OF TESTS DATE TESTED 02/22/2000 02/22/2000 03/14/2000 03/14/2000 AGE (days) Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas ACCUMULATIVE YARDS: 1O MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 7 84690 2990 7 87910 3110 Average 3050 28 96590 3420 28 100350 3SS0 Average 3490 .^~` This report is exclusively (or the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. MIX I.D.: 93S 1 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. Project No.: 94991457 O1LL Page 2 of 3 CONCRETE COMPRE`'SIVE STRENGTH TEST I~INE>~,~. a division oj~~lYaCOfl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 752A7 Re ort No.: 0004448 Report Date Date of Service: 02/1S/2000 p 03/17/2000 Client No.: 85229000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project No.: 94991457 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE SUPPLIEK: Pioneer PLAN: 22 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP: S.0" Max AIR: 3-S% TEST METHOD: ASTMC-143 ASTM C-172 ASTM C-39 MIX I.D.: 9381 PLACEMENT DATE: O2/1S/2000 BATCH TIME: 6:3Oam 'IIDIESAMPLED: 7:1Sam BY: Steve Campbell WEATHER CONDITIONS: Clear TEMPERATURE (F) -AIR S6 F CONCRETE: 66 F TRUCK NO: 842 TICKET NO: SO3442 AIR CONTENT (%): 4.75 UNIT WEIGHT (pcf): l~l/A PLACEMENT LOCATION: See page 1 SAMPLE LOCATION: See page 1 REPORT OF TESTS ACCUMULATIVE YARDS: lO CYLINllER MEASURED b1AXIMUM COMPRESSIVE MARKEll SLUMP DATE AGE LOAD STRENGTH SET NO. {inches) TESTED (days) (Ibs. force) (psi) 3 1 7.50 02/22/2000 7 86540 3060 3 2 7.50 02/22!2000 7 87910 3110 Average 3090 3 3 7.50 03/14/2000 28 108330 3830 3 4 7.50 03/14/2000 28 113080 4000 Average 3920 ~~ ~~ FRACTURE TYPE Technician: Steve Campbell Started: 3:OOam Finished: 9:OOam ~~ me in InC. g g~ Report Distribution: (1) Transwestern Property Company (l) City of Coppell (1) O'Brien & Associates (l) City of Coppell Paul D. Sm1th, P.E. (1) Technistructures, Inc. Senior Project Engineer (l) Butler Construction This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering [nc. O1LL Page 3 of 3 CONCRETE COMPRE~IVE STRENGTH TES'Q Date of Service: 03/06/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Report No.: 0006233 Report Date 03/17/2000 Project No.: 94991457 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CoNTRA('TOR: Butler Construction CONCRETE SUPPLIER: Pioneer PLANT: 22 SPECIFICATION REQUIREMENTS sTRENGTH: 3000 psi @ 28 Days SLUMP: 5-7~~ Ant: N/A TEST METHOD: ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Piers M.1/3.9, M/5 and M/4 DATE TESTED 03/13/2000 03/13/2000 REPORT OF TESTS CYLIINDER MARKED SET NO. 1 1 1 2 1 3 1 4 MEASURED SLUMP (Inches) 5.00 5.00 5.00 5.00 Technician: Roy Montgomery Report Distribution: (1) Transwestern Property Company (l) O'Brien 8c Associates (1) Technistructures, lnc. (1) Butler Construction 04/03/2000 04/03/2000 Ma I.D.: 9337 PLACEMENT DATE: 03/06/2000 BATCH TIINlE: N/A TII1~ sAMPLED: 3:18pm sY: Roy Montgomery WEATHER CONDITIONS: Clear TEMPERATURE (I~ -AIR 78 F CONCRETE: 8O F TRUCK NO: 739 TICKET NO: 502566 ATR CONTENT (96): N/A UNIT WEIGHT (pd): N/A PLACEMENT LOCATION: Drilled Pies Technician Time: See Report 1!0006232. AGE (da7s) 7 7 28 28 started: (1) City of Coppell (1) City of Copped MAXII~IUM LOAD (lba farce) 91340 102750 Average ,~ a dlvistar ojlferraoon 89@1 Carpenter Frwyy $tllte 8100 ACCUMULATIVE YARDS: SO coMPRESSr~E STR@iGTH FRACTURE TYPE 3230 3630 3430 rl7l. n ing, Inc. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall Wert be reproduced except in fnll without the written approval of HHC Eagiaeuis8. hic. O1SS Page 1 of 1