Loading...
Northlake 635(5)-LR000307REPORT OF DRILLED BELLED PIERS ~ T,~n~ 7~247 Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. B), Coppell, Texas 94991457 Pier Identification J.7/11.5 J .3/11.5 L.7/11.5 Pier Diameter 24 24 24 Bell Diameter (in.) 54 54 54 , of Pier Elevation N/A N/A N/A t from Exist. Grade, See Note See Note 18.00 Initlel Depth of Pier from Existing 15.42 15.00 18.00 Final Del~t of Pier from Existing 16.00 15.42 18.16 16.08 15.75 16.42 from To.p. of Concrete, Condition of Bottom Plumb Within Tolerance I Dbmteter t Oiled Number of Vertical Barn Bar Size of Verti~l Barn w~e Com Time Concrete was Pl~oed Yes Yes Yes N/A N/A N/A N/A N/A N/A 6 6 6 6 6 6 15.08 15.25 16.00 8:35a.m. 8:53n.m. g:15a.m. M/7.1 30 6O N/A 18.00 18.16 18.50 14.50 Yes N/A N/A 8 6 17.50 10:30 n.m. 191/9.7 3O 60 N/A 18.00 18.00 18.50 14.00 Yes N/A N/A 8 6 17.00 8.111. 12:16 p.m. R~ort No.: 0006340 Dm of ~n~: 03/07/00 T~hniolan: R. Montgomery 1 of 2 M/10.1 IVV6.5 M/4.7 L.5/1.5 E.3/1 A/6.7 30 30 30 30 30 30 N/A N/A N/A N/A N/A N/A 18.00 18.00 18.00 18.00 8~e Note See Note 18.00 18.00 18.42 18.42 16.16 16.42 18.33 18.00 lg.25 19.00 16.50 16.67 1~3.~3 1~3.83 15.25 14.50 12.42 12.67 Dry Yes Yes Yes Yes Yes Yes N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 8 8 8 8 8 8 16.8,'3 16.88 18.25 17.50 15.42 15.67 10:53 a.m. 11:08 e.m. :25 s.m. 12:22 REPORT OF DRILLED BELLED PIERS Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. B), Coppell, Texas 94991457 ~ T, mc~ 7S247 ~,pon No.: 0006340 C~ o~ S~vic~: 03/07/00 T~chniclan: R. Montgomery P.a~: 2 of 2 Pier Identifier'_on ^.3/3.9 A.3/0.8 L.6/3.9 AA/3.9 Pier Diameter (in.) 24 24 24 24 Bell Diameter (in.) 54 54 54 54 Top of Pier EleviUon (ft) N/A N/A N/A N/A p_~; Depth from E.x.,-_~_ Gmd_e (ft) See Note See Note 18.00 See Note Initial Depth of Pier from Existing Gm_,~_ (ft) 16.00 16.08 18.50 16.42 Final Depth of Pier from Exbting Gm--,~- (It) 16.42 16.25 18.92 16.67 Depth from Top of C_.~rtorete Irt) 15.00 15.83 17.42 10.00 Condition of Bottom (wet or dlT) Dry Dry Dry Dry Plumb Within Toleranoe (}ees or no) Yes Yes Yes Yes C-~-_tn9 Diameter lin) N/A N/A N/A N/A Number of Vertical B~m (ea.) 6 6 6 6 Rllnforcln~l Bar -~,, (~ 6 6 6 6 Len~h of VerU~i. Ber, irc) 14.50 15.33 17.00 16.50 Time Drlllin~l wa~ Completed 2:06 p.m. 2;24 p.m. 2:40 p.m. 3:00 p.m. Time Concrete was Placed 2:14 p.m. 2:35 p.m. 2:50 p.m. 3:20 p.m. I