Loading...
121 BP Phase 1-LR 990913 GEOTECHNICAL AND ~ F=:I r--1 I I p ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 53 P.O. Box 802047 REPORT DATE: 09-13-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-18-99 TECHNICIAN: D. Collier PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Footings, building 4: A-12, A-13.5, A-17.5. Reference Plans or Notes Used: 1 Structural drawings. I X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/meb Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-'24 STUTZ DR. · S~ITE 400 · DALLAS. TX 75:35 · TEL .'21'*.' 350 56012 · =AX [214] 3.~0 3019 GEOTECHNICAL AND ~ F=J r-'l I I F:~ ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 54 P.O. Box 602047 REPORT DATE: 09-13-99 Dallas, Texas 75360-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-19-99 TECHNICIAN: O. Thornton PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Items Observed: I Grade Beam: Building 4; 651 Canyon Drive Column Line 2 between B and E and line B between 2 and 11.5. Reference Plans or Notes Used: I Structural drawings. J X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure dames F. Phipps, P.E. (1) Campbell Associates/ BW/meb Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR. · SL. -E 450 · DALLAS. TX 75235 · TEL ~214:350 55,~3 * :AX [2'4] 350 CCI9 GEOTECNNICAL AN:) [~ J::=J r"l I I j=~ ENV?,ONI~IENTAL CONSULTANTS · REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 1:21 Business Park 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 52 P.O. Box 802047 REPORT DATE: 09-13-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-20-99 TECHNICIAN: F. Steadman PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. J Items Observed: J Building 4, (651 Canyon Drive) footings: E-12, E-13.5 and E-17. J Reference Plans or Notes Used: J Sheet S3.01, Detail F-4. X JThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ BP/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger _'.'~4 STJTZ DR. · SL,~T£ 400 · DALLAS -X 75235 · TEL [2'.4~ 350 5630 · FAX [214] 350 0019 GEOTECHNICAL AND C~ F::;J r"l I I p ENVIROnMENtal CONSUIT^nt$ REPORT Of FIELD DENSITY TESTS 121 Business Park 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 41 P.O. Box 802047 REPORT DATE: 09-13-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh TECHNICIAN: R. Bullion PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Proctor ASTM Optimum I Maximum No. Standard Description Moisture, % I Density, PCF ! D-698 Reddish brown sandy clay w/gravel 9.0 127.0 2 D-698 Dark brown clay w/organics 14.0 107.5 3 D-698 Light brown sand w/trace clay and organics 9.5 117.5 4 D-698 Reddish brown sand w/gravel 10.5 115.0 Depth Below Field Field Test Final S.G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID Level (%) 133 08-06-99 Sanitary line: 40'N, 30'W(1) 0.0 110.6 10.9 4 96.2 134 Sanitary line: 40'N, 75'W(1 ) 0.0 109.6 11.3 4 95.3 135 Sanitary line: 40'N, 100'W(1) 0.0 110.4 11.0 4 96.0 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from S.E. corner of building 3. Distribution: (1) The industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Ronald F. Reed, P.E. (1) Campbell Associates/ BW/je Mr. Randy Pillar (1 City of Coppell/Building Inspections (1 City of Coppell/Engineering Dept. (1 Bear Creek Construction/ Mr. Brian Holdgate (1 Mr. Hank Metzger 242~-~--UtZ DR. · -"SUITE ,~00 · DALLAS. TX 75235 · TEL [21-'] 350 5600 .' FAX [2i4] 350 0019 .......