121 BP Phase 1-LR 990910 GEOTECHNICAL AND I~ F=;;I I'--1 U F=~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
CiCi's Corporate Headquarters
Bethel Road
Coppell, Texas
REPORTED TO: JMC Restaurant Distribution REPORT NO. 36
1620 Rafe Street. Suite 114 REG PROJECT NO. 5608
Carrollton, Texas 75006 SAMPLE DATE: 09-10-99
ATTN: Mr. Bob Kulick TECHNICIAN: B. Woolwine
CONTRACTOR: Builard Construction
Location of Sample
t Set Number I Location I Quantity Represented
. 1 Slab Leave Out: 10'N, 2'E of SW Bldg. Corner 10/20
Design Information
! Source of Concrete I Mix Identification I Specified Strength p.s.i.
i TXI 9506 3500
Test Results
Set ICylinder[ [ Age(~ ITotalLoad Compressive I Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 7521 09-17-9g 7 86230 3050
7521 09-17-99 7 91310 3230 3140
7521 10-08-99 28 126260 4470
i 7521 10-08-99 28 124420 4400 4440
Cylinder Data
Set[ Cylinder Time of I I Concrete Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 7521 4.00 10:50 AM 89 89 2.8 1409390
Distribution: (1) JMC Restaurant Distribution/ Submitted by:
Mr. Bob Kulick
(1) Weeks Corporation/Mr. Paul Brown REED ENGINEERING GROUP, INC.
(1) Bullard Corporation/
Mr. Keith McMahon Original Signed By
(1) Corgan Associates/
Mr. Jorge Gonzalez Keith E. Atkins
(1) L.A. Fuess Partners/ KEA/sa/rt
Mr. Thomas Scott
(1) Pacheco Koch/Mr. Chris Jones
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
242-'- STUTZ DR SUITE 42Z · DALLAS TX 75235 · TEL ;2'4' 2E.2 5533 * FAX Z2"cZ 3E,2 _'.':-:cE-