Loading...
121 BP Phase 1-LR 990910 GEOTECHNICAL AND I~ F=;;I I'--1 U F=~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT CiCi's Corporate Headquarters Bethel Road Coppell, Texas REPORTED TO: JMC Restaurant Distribution REPORT NO. 36 1620 Rafe Street. Suite 114 REG PROJECT NO. 5608 Carrollton, Texas 75006 SAMPLE DATE: 09-10-99 ATTN: Mr. Bob Kulick TECHNICIAN: B. Woolwine CONTRACTOR: Builard Construction Location of Sample t Set Number I Location I Quantity Represented . 1 Slab Leave Out: 10'N, 2'E of SW Bldg. Corner 10/20 Design Information ! Source of Concrete I Mix Identification I Specified Strength p.s.i. i TXI 9506 3500 Test Results Set ICylinder[ [ Age(~ ITotalLoad Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 7521 09-17-9g 7 86230 3050 7521 09-17-99 7 91310 3230 3140 7521 10-08-99 28 126260 4470 i 7521 10-08-99 28 124420 4400 4440 Cylinder Data Set[ Cylinder Time of I I Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 7521 4.00 10:50 AM 89 89 2.8 1409390 Distribution: (1) JMC Restaurant Distribution/ Submitted by: Mr. Bob Kulick (1) Weeks Corporation/Mr. Paul Brown REED ENGINEERING GROUP, INC. (1) Bullard Corporation/ Mr. Keith McMahon Original Signed By (1) Corgan Associates/ Mr. Jorge Gonzalez Keith E. Atkins (1) L.A. Fuess Partners/ KEA/sa/rt Mr. Thomas Scott (1) Pacheco Koch/Mr. Chris Jones (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 242-'- STUTZ DR SUITE 42Z · DALLAS TX 75235 · TEL ;2'4' 2E.2 5533 * FAX Z2"cZ 3E,2 _'.':-:cE-