Loading...
121 BP Phase 1-LR 990909 GEOTECHNICAL AND ~ I~ 0 LJ ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park- Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 76 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 09-09-99 ATTN: Mr. John Walsh TECHNICIAN: J. Bardziej CONTRACTOR: Westcliffe. Inc. Location of Sample I Set Number I Location I Quantity Represented 1 Grade Beam: 30'N. I'E of SW Corner of Bldg. #5 10/40 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. ! Lattimore 18 4000 Test Results ! Set ICylinderI Age@ TotalLoad Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 7572 09-16-99 7 108600 3840 7572 10-07-99 28 131490 4650 7572 10-07-99 28 135170 4780 4720 7572 Hold Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number I 7572 5.00 2:00 PM 93 93 N/A 7076868 Distribution: (!) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 242-' ST:JTZ DR SUITE .:23 · DALLAS TX 75235 · -EL ~214~ 2.=.2 5.~CC · F.~X [2:4' 2~2 ,2. C1~