Loading...
121 BP Phase 1-LR 990831 GEOTECHNICAL ~'.%D I~] I~ I'--1 I I p ENV'RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 67 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 08-31-99 ATTN: Mr. John Walsh TECHNICIAN: V. McManis CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Bldg. #5 Footing, Line E.5-5.5 10/10 Design Information ! Source of Concrete I Mix Identification I Specified Strength p.s.i. i Lattimore 38 3000 Test Results Set ICylinderI Age(~ TotalLoad[ Compressive Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. I 7228 09-07-99 7 76480 2710 7228 09-07-99 7 75410 2670 2690 7228 09-28-99 28 97000 3430 7228 09-28-99 28 96450 3410 3420 Cylinder Data Set I Cylinder I Timeof [ ConcreteI Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 7228 5.50 1:40 PM 100 94 5.8 3091143 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger Z:.:24 STLTZ DR SUITE -:'ZZ · D~LLAS TX 7=.Z~5 · TEL [Z:'-" 353 5EZZ · FAX ~?'-:'] 2.5;-.'