Loading...
121 BP Phase 1-LR 990830 GEOTECHNICAL AND ~ R I-1 I I p ENV,RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 66 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 08-30-99 ATTN: Mr. John Walsh TECHNICIAN: F. Gomez CONTRACTOR: Westcliffe, Inc· Location of Sample Set Number I Location I Quantity Represented 1 Grade Beam. Line C-E x 19. Bldg. "4" 10/15 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. I Lattimore 18 4000 Test Results Set ICylinderj Age@ ITotalLoadI Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 7211 08-06-99 7 102850 3640 7211 08-27-99 28 117580 4160 7211 08-27-99 28 120470 4300 4230 7211 Hold Cylinder Data ~o. ID Slump Sample Air Temp. letup, fintrainment ~umber 1 7211 4.50 2:20 PM 100 97 N/A 3091033 Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr· Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Greek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2,224 STUTZ DR · SU -E 433 · DALLAS -X r5235 · -EL ~214~ 35'- '3666 · PAX [2'4~ 2~Z CCI~'