Loading...
121 BP Phase 1-LR 990825 GEOTECNNIC."L AK} ~ F=:I I'--1 ENVIRONMENTAL CO",,ISU L=A NTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 63 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 08-25-99 A'I-I-N: Mr. John Welsh TECHNICIAN: H. Johnson CONTRACTOR: Westcliffe. inc. Location of Sample Set Number J Location J Quantity Represented 1 Grade Beam: Gridline B x 12-16.5. Bldg. #4 10/30 Design Information J Source of Concrete J Mix Identification J Specified Strength p.s./. Lattimore 18 4000 Test Results Set I CylinderI Age@ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p,s,i, p.s./. 1 7044 09-01-99 7 97640 3450 7044 09-01-99 7 94510 3340 3400 7044 09-22-99 28 118250 4180 j 7044 09-22-99 28 110780 3920 4060 Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment I Number 1 7044 4.50 2:15 PM 100 94 N/A 7076060 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pillar (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STUTZ DR SUITE 433 · DALLAS TX -5225 · TEL ~£1-'~ '_:g: 5EZZ * ---~'X ~£'4~ 35Z L:'~-