121 BP Phase 1-LR 990823 GEO-ECH'-,IICAL A'-,D [~i F=:I r-1 I I ~
ENV,RONMENTAL CONSULTANIT.¢ i
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
CiCi's Corporate Headquarters
Bethel Road
Coppell, Texas
REPORTED TO: JMC Restaurant Distribution REPORT NO. 29
1620 Rafe Street. Suite 114 REPORT DATE: 08-23-99
Carrollton, Texas 75006 REG PROJECT NO. 5608
ATTN: Mr. Bob Kulick DATE OBSERVED: 08-11-99
TECHNICIAN: G. Green
PAGE: i of I
CONTRACTOR: Bullard Construction
I Items Observed: I Building Panels: 3 through 10, 14, 15, 16, 17, 19, 21,25
31, 33, 34, 35 and 36.
I Reference Plans or Notes Used: I Sheet S4.01
List Deviations Noted: I 1) Panel 19: missing chairs and 11 panels need to be
cleaned of dirt and debris.
The noted deviations were reported to: Foreman
X iThe noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) JMC Restaurant Distribution/ Submitted by:
Mr. Bob Ku!ick
(1) Weeks Corporation/Mr. Paul Brown REED ENGINEERING GROUP, INC.
(1) Bullard Corporation/
Mr. Keith McMahon Original Signed By
(1) Corgan Associates/
Mr. Jorge Gonzalez James F. Phipps, P.E.
(1) L.A. Fuess Partners/ JFP/KEA/je
Mr. Thomas Scott
(1) Pacheco Koch/Mr. Chris Jones
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Z-'2-: STU~'Z D~,. · SUIIE 433 · DA_~AS, TX 75235 · -EL 12'4' 35'3 55:-":-" · ;AX 12'4; 352 C'~''~ I
GEOTEC-II',,ICAL AND [~] ~ r-1 U P
EN'~.RONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and '/51 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 3g
P.O. Box 802047 REPORT DATE: 08-23-99
Dallas, Texas 75380-2047 REG PROJECT NO, 5607
ATTN: Mr. John Walsh DATE OBSERVED: 08-11-99
TECHNICIAN: B. Ray
PAGE: 1 of 1
CONTRACTOR: Westcliffe: Inc.
J Items Observed: J Building 3, (701 Canyon Drive) foundation slab
B to E from 2 to 10.5.
J Reference Plans or Notes Used: J Structural drawings.
J X :There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
1 ) Campbell Associates/ JFP/KEA/je
Mr. Randy Pliler
1 City of Coppell/Building Inspections
(1 City of Coppell/Engineering Dept.
(1 Bear Creek Construction/
Mr. Brian Holdgate
(1 Mr. Hank Metzger
2424 S-JTZ [::R SUITE -;CC · C~'~L¢,S TX 75235 · TEL [2'z' 352 56.32 · FA* ;21z. 55; .-Z'2-
GEO-ECr-.NICAL ANID ~ ~ r-'l I I ~
E'~ v I R 0 h..~ F. h. TA L CON~U~TA/'~ TS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Road
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 38
P.O. Box 802047 REPORT DATE: 08-23-99
Dallas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh DATE OBSERVED: 08-10-99
TECHNICIAN: B. Ray
PAGE: 1 of !
CONTRACTOR: Westcliffe, Inc.
Items Observed: I Building 2 (751 Canyon Drive) grade beam at line B,
6 to 11 and E from 14 to 18.
Reference Plans or Notes Used: I Structural drawings.
X IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Ph=,pps, P.E.
(1) Campbell Associates/ JFP/KEA/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
Z-:Z-' STLTZ ID~ 5. U!T-- 400 · 'DALLAS. TX 75235 · TELiLr-'4' 350 5600 · F.:';'~ jf. '.z" -..':c .... _z
GEOTECHNIC.-'L AND ~ ~ r-I U F=~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 61
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 08-23-99
ATTN: Mr. John Walsh TECHNICIAN: F. Steadman
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number I Location J Quantity Represented
I 1 Grade Beam, Line E-4 to E-6. Bldg. #4 30/40
Design Information
! Source of Concrete I Mix Identification Specified Strength p.s.i.
i Lattimore 18 4000
Test Results
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 6995 08-30-99 7 106290 3760
6995 09-20-99 28 135310 4790
6995 09-20-99 28 133740 4730 4760
6995 Hold
Cylinder Data
Set I Cylinder I Time ofI I Concrete Air r Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 6995 4.75 2:55 PM 95 93 N/A 3090582
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
2~2'-: S-J~Z .DR SL'-E 4~2 · D~....~S TX ~.-'.27-- · T£- ~2','-~ 5~,.; 5-£33 · FAX ~2_',I~ 35C 33"?