Loading...
121 BP Phase 1-LR 990823 GEO-ECH'-,IICAL A'-,D [~i F=:I r-1 I I ~ ENV,RONMENTAL CONSULTANIT.¢ i REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION CiCi's Corporate Headquarters Bethel Road Coppell, Texas REPORTED TO: JMC Restaurant Distribution REPORT NO. 29 1620 Rafe Street. Suite 114 REPORT DATE: 08-23-99 Carrollton, Texas 75006 REG PROJECT NO. 5608 ATTN: Mr. Bob Kulick DATE OBSERVED: 08-11-99 TECHNICIAN: G. Green PAGE: i of I CONTRACTOR: Bullard Construction I Items Observed: I Building Panels: 3 through 10, 14, 15, 16, 17, 19, 21,25 31, 33, 34, 35 and 36. I Reference Plans or Notes Used: I Sheet S4.01 List Deviations Noted: I 1) Panel 19: missing chairs and 11 panels need to be cleaned of dirt and debris. The noted deviations were reported to: Foreman X iThe noted deviations were corrected. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) JMC Restaurant Distribution/ Submitted by: Mr. Bob Ku!ick (1) Weeks Corporation/Mr. Paul Brown REED ENGINEERING GROUP, INC. (1) Bullard Corporation/ Mr. Keith McMahon Original Signed By (1) Corgan Associates/ Mr. Jorge Gonzalez James F. Phipps, P.E. (1) L.A. Fuess Partners/ JFP/KEA/je Mr. Thomas Scott (1) Pacheco Koch/Mr. Chris Jones (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Z-'2-: STU~'Z D~,. · SUIIE 433 · DA_~AS, TX 75235 · -EL 12'4' 35'3 55:-":-" · ;AX 12'4; 352 C'~''~ I GEOTEC-II',,ICAL AND [~] ~ r-1 U P EN'~.RONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and '/51 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 3g P.O. Box 802047 REPORT DATE: 08-23-99 Dallas, Texas 75380-2047 REG PROJECT NO, 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-11-99 TECHNICIAN: B. Ray PAGE: 1 of 1 CONTRACTOR: Westcliffe: Inc. J Items Observed: J Building 3, (701 Canyon Drive) foundation slab B to E from 2 to 10.5. J Reference Plans or Notes Used: J Structural drawings. J X :There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster 1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By 1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. 1 ) Campbell Associates/ JFP/KEA/je Mr. Randy Pliler 1 City of Coppell/Building Inspections (1 City of Coppell/Engineering Dept. (1 Bear Creek Construction/ Mr. Brian Holdgate (1 Mr. Hank Metzger 2424 S-JTZ [::R SUITE -;CC · C~'~L¢,S TX 75235 · TEL [2'z' 352 56.32 · FA* ;21z. 55; .-Z'2- GEO-ECr-.NICAL ANID ~ ~ r-'l I I ~ E'~ v I R 0 h..~ F. h. TA L CON~U~TA/'~ TS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Road Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 38 P.O. Box 802047 REPORT DATE: 08-23-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh DATE OBSERVED: 08-10-99 TECHNICIAN: B. Ray PAGE: 1 of ! CONTRACTOR: Westcliffe, Inc. Items Observed: I Building 2 (751 Canyon Drive) grade beam at line B, 6 to 11 and E from 14 to 18. Reference Plans or Notes Used: I Structural drawings. X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Ph=,pps, P.E. (1) Campbell Associates/ JFP/KEA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger Z-:Z-' STLTZ ID~ 5. U!T-- 400 · 'DALLAS. TX 75235 · TELiLr-'4' 350 5600 · F.:';'~ jf. '.z" -..':c .... _z GEOTECHNIC.-'L AND ~ ~ r-I U F=~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 61 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 08-23-99 ATTN: Mr. John Walsh TECHNICIAN: F. Steadman CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location J Quantity Represented I 1 Grade Beam, Line E-4 to E-6. Bldg. #4 30/40 Design Information ! Source of Concrete I Mix Identification Specified Strength p.s.i. i Lattimore 18 4000 Test Results No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6995 08-30-99 7 106290 3760 6995 09-20-99 28 135310 4790 6995 09-20-99 28 133740 4730 4760 6995 Hold Cylinder Data Set I Cylinder I Time ofI I Concrete Air r Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6995 4.75 2:55 PM 95 93 N/A 3090582 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2~2'-: S-J~Z .DR SL'-E 4~2 · D~....~S TX ~.-'.27-- · T£- ~2','-~ 5~,.; 5-£33 · FAX ~2_',I~ 35C 33"?