Loading...
121 BP Phase 1-LR 990820 GEOTECHNICAL .-' N ;, ENV'RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 62 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 08-20-99 ATTN: Mr. John Walsh TECHNICIAN: F. Steadman CONTRACTOR: Westcliffe. Inc. Location of Sample I Set Number I Location I Quantity Represented i 1 Bldg.#4Footing: E-12. E-13.5. E-17 10/10 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 38 3000 Test Results Set ICylinderI I Age@ ITotalLoad I Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6933 08-27-99 7 94200 3330 6933 09-17-99 28 110270 3900 6933 09-17-99 28 104620 3700 3800 ~ 6933 Hold ~ Cylinder Data Set I CylinderI Timeo, [ I Concrete Air Ticket ! No. ID Slump Sample Air Temp. Temp. Entrainment , Number i 1 6933 4.75 1:50 PM 90 94 4,0 3090499 Distribution: (1)The Industrial Group/ Submitted by: Mr, John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure (1) Campbell Associates/ Keith E. Atkins Mr, Randy Pliler KEA/sa/rt (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept, (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2-'2,; S-J-Z ZR S'.ITE z22 · DA_LAS TX 75235 · -E- [2'4:353 ~{'22 · ::AY.