Loading...
121 BP Phase 1-LR 990819 GEOTECHNICAL ~.N3 ~ F~I r-'l U F=~ ENV.RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 60 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 08-19-99 ATTN: Mr. John Walsh TECHNICIAN: O. Thornton CONTRACTOR: Westcliffe. Inc. Location of Sample ! Set Number I Location I Quantity Represented i 1 Bldg.#4 Grade Beam, @ B.8-2 10/40 Design Information Source of Concrete I Mix Identification [ Specified Strength p.s.i. Lattimore 18 4000 Test Results Set [CylinderI I Age@ ITotalLoad Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6927 08-26-99 7 98690 3490 6927 08-26-99 7 100240 3550 3520 6927 09-16-99 28 117520 4160 6927 09-16-99 28 121970 4310 4240 Cylinder Data Set I Cylinder I Timeof I I Concrete I Air I Ticket ' No. ID Slump Sample Air Temp. Temp. Entrainment . Number 1 6927 5.00 2:10 PM 98 95 N/A 7075793 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2424 STt, TZ D~ SUITE 433 · DALLAS TX 75~'35 · TEL ~21z~