Loading...
121 BP Phase 1-LR 990818 GEOTECHN.CAL ;~,.:; E~ F;;I r-'l U F~ ENV. ~.o BI',1 ENTA L CCNSUL~Z~NTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 59 P.O, Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 08-18-99 ATTN: Mr. John Walsh TECHNICIAN: D. Collier CONTRACTOR: Westc!iffe. Inc. Location of Sample ! Set Number I Location I Quantity Represented 1 Footing: A-12, A-13.5. A-17.5 10/10 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 38 3000 Test Results Set I Cylinder Age@ I Total Load Compressive Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. I 6925 08-25-99 7 68620 2430 6925 08-25-99 7 68520 2420 2420 6925 09-15-99 28 86030 3040 6925 09-15-99 28 84060 2970 3010 Cylinder Data No. ID Slump Sample AirTemp. I Temp. Entrainment i Number 1 6925 5.50 2:30 PM 100 94 N/A 7075749 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept, (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger _'.-1£z STUTZ D:;. ~.J -E -:::;C · :,.~---.A.c. -'< 75235 · -E! :;''4: ~'.-': :~-~:: · :/,.~ :21.:'~ ~: :1'-'.- GEOTECHNICAL ~'I',,D I~ ~ ~ I I Fm ENVP~ONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 58 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 08-18-99 ATTN: Mr. John Walsh TECHNICIAN: F. Steadman CONTRACTOR: Westciiffe, Inc. Location of Sample Set Number t Location I Quantity Represented 1 Floor Slab Bldg. #3: 15'S 10'E of Grid E-10 40/440 2 Floor Slab Bldg. #3: 50'N 75'E of Grid B-10 120/430 3 Floor Slab Bldg. #3: 20'S 115'W of NE Bldg. Corner 210/430 ~ 4 Floor Slab Bldg. #3: 10'S 40'W of NE Bldg. Corner 310/430 ! 5 Floor Slab Bldg. #3: 40'S 15'W of NE Bldg. Corner 410/430 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 18 4000 Test Results Set ICylinderI Age~ ITo,,,~o,~l Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6859 08-25-99 7 95810 3390 6859 09-15-99 28 123900 4380 6859 09-15-99 28 124910 4420 4400 6859 Hold 2 6860 08-25-99 7 107660 3810 6860 09-15-99 28 126690 4480 6860 09-15-99 28 126520 4480 4480 6860 Hold 3 6861 08-25-99 7 104270 3690 6861 09-15-99 28 127350 4500 6861 09-15-99 28 124330 4400 4450 6861 Hold 4 6862 08-25-99 7 93550 3310 6862 09-15-99 28 115620 4090 6862 09-15-99 28 116020 4100 4100 6862 Hold 5 6863 08-25-99 7 101900 3600 6863 09-15-99 28 116960 4140 6863 09-15-99 28 119670 4230 4190 6863 Hold 2..4"24 STUTZ DR SUITE 4.33 · DALLAS TX :'523~ · TEL '214. ']57 56"Z.C * :.-"..X ~2'4.~ ].=.~ ,?':;'.~