Loading...
121 BP Phase 1-LR 990817 GEOTECHNICAL -~\D r~ F:~ r-'l U F~ ENW RONi"IENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 57 P.O. Box 802047 REG PROJECT NO. 5007 Dallas, Texas 75380-2047 SAMPLE DATE: 08-17-99 ATTN: Mr. John Walsh TECHNICIAN: E. Rico CONTRACTOR: Westcliffe. Inc. Location of Sample ! Set Number I Location I Quantity Represented i 1 Bldg.#4 Footing: Gridlines E-3.5. E.9-3.6. E-7.5:E-7.4 10/13 Design Information Source of Concrete I Mix Identification [ Specified Strength p.s.i. I Lattimore 38 3000 Test Results Set ICylinderI Age@ TotalLoadI Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6865 08-24-99 7 84640 2990 6865 09-14-99 28 104540 3700 6865 09-14-99 28 105760 3740 3720 6865 Hold Cylinder Data Set I Cy,nder I T,meof I Concrete I Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6865 4.50 1:45 PM 104 99 NA 7075679 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 2:424 STLT7 DR. · SJ -E -'CC' · DA,.-AS -X 75235 · -EL :2'4I 2E-- f-q:: · FA>' ~'_;':-'~ 2.~:: 27';-