Loading...
121 BP Phase 1-LR 990813 GEOTECHNICAL AND ~ F::I r--'l I I FTM ENVIRONMENTAL C~NSULT.ZNTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 51 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 08-13-99 ATTN: Mr. John Walsh TECHNICIAN: V. McManis CONTRACTOR: Westcliffe. Inc. Location of Sample I Set Number I Location I Quantity Represented , 1 Bldg. 3 Grade Beam: 17-E 20/40 Design Information ISource of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 18 4000 Test Results Set J CylinderI Age@ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. ! 6715 08-20-99 7 100630 3560 6715 08-20-99 7 97920 3460 3510 6715 09-10-99 28 123590 4370 6715 09-10-99 28 123950 4380 4380 Cylinder Data Set I Cylinder I Timeof I Concrete I Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6715 5.5 1 '1 OPM 104 94 NA 3090034 Distribution: (1)The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1 City of Coppell/Building Inspections (1 City of Coppell/Engineering Dept. (1 Bear Creek Construction/ Mr. Brian Holdgate (1 Mr. Hank Metzger Z='24 .c.'.]L ;Z Dq 5..U -E ='--,3 · IZ'ALL;-.S -.-< -fFE~ * -EL ]21~:' '-~SZ -Z~':CC; · ;--'X [Z'4] 2~: C']:~.-