Loading...
Northlake 635(5)-LR000301REPORT OF DRILLED BELLED PIERS 890! Cm'pea~' ~., DIllon, T~ 7~247 Projeot: Coppell Commerce Center Report No.: 0005810 1234 Lakeshore (Bldg. B), Coppell, Texas Dat~ of S~rvice: 03/01/00 Technician: R. Montgomery Prol~ct No.: 94991457 Page: 1 of 2 D.5/6 D.5/5.5 D.5/5 D.5/4.5 F_./4.5 E.5/4.5 F/4.5 F.5/4.5 G/4.5 G.514.5 D.5/6.5 Pier Identification '--'--'"' --""--"""' Pie;' Diameter (in.) 24 24 24 24 24 24 24 24 24 24 24 .1 3 Bell Diameter (in.) 54 54 54 54 54 54 54 54 54 54 54 Top of Pier Elevation (it) 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 Req. Dep~i fro,,-i Exist. Grade (it) See Note S~ Note Sec Note See Note See Note See Note See Note See Note See Note See Note See Note Initial Depth of Pier from Existing Grade (fi) 16.25 15.25 15.25 15.42 15.00 15.16 16.16 15.00 15.50 15.42 15.67 Final Depth of Pier from Existing G ~.=_.~ (it) 16.50 15.50 15.50 15.58 15.25 15.50 16.67 15.00 15.50 15.42 15.83 Depth ~om Top of Con¢~e[e (It) 16.16 15.16 15.16 14.33 15.08 15.00 15.92 14.00 14.42 15.33 15.42 Condition of Bo~;,m (wel or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Wi~In Tolerince G'~- or no) Yes Yes Yes .. Yes Yes Yes Yes Yes Yes Yes Yes r'_~__~!ng D'..:..~.;~: (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A .,, C-_-__-d Depth tIt} N/A N/A N/A N/A N/A N/A N/A N/A N/A N~,A N/A ~ Number of Ve~u-.~i ._n=_.;-;, (ea.) 6 6 6 6 6 6 . 6 6 6 6 6 Re;fi;~,-clnl;I Bar $!xe (ill) 6 6 6 6 6 6 , 6 6 6 6 . 6 I.e,-,tl-'u, of Verticel Barn (ft.) 16.67 14~67 14.67 13.83 14.58 14.50 15.42 13.50 13.92 14.83 14.92 TimeDrillin~-~C~;;--.'-~ 10:09a.m. 10:228.m. 10:338.m. 10:468.m. 10:588.m. 11:148.m. 11:288.m. 11:408.m. 1:00p.m. 1:13p.m. 1:30p.m. Time Con¢,,~ wai Placed 12:15 p.m. 12:2q p.m. 12:30 p.m. ~2:40 p.m. 2:30 p.m. 2:36 p.m. 2:43 p.m. 2:48 p.m. 2:54 p.m. 3:30 p.m. 3:35 p.m., I I I REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Commerce Center 1234 Lakeshore (Bldg. B), Coppell, Texas 94991457 Report No.: 0005810 Oate o~Servi~: 03/01/00 Technician: R. Montgomery Page: 2 of 2 Dedl~, Texet 7S247 Pier Identification D.5/7 D.5/7.5 D.5/8 D.5/8.5 D.5/9 D.5/9.5 D.5/10 D.5/10.5 D.5/11 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 Req. Depth from Exist. Grade (It) See Note See Note See Note See Note See Note See Note See Note See Note See Note Initial Depth of Pier from E~eting Grade (It) 17,00 15.16 15.50 15.00 15.33 15.00 16,16 16.83 15.00 Final Depth of Pier fr~m Existing Grade (it) 17.50 16.00 15.75 15.50 15.92 15.00 16.16 17.00 15.00 Depth from Top of Con©rete (It) 17.25 15.67 15.67 15.16 15.58 15.42 14.92 15.83 14.75 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry plumb Within Tolerance (}fei or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes ,,Ca~lng Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A Caeed Depth (It) N/A N/A N/A N/A N/A N/,A N/A N/A N/A Number of Vertical Barn (ea.) 6 6 6 6 6 6 6 6 6 , Reinforcinltl Bar Size (#) 6 6 6 6 6 6 6 6 6 ,~ of Vertical Barn (ft.) 16.75 15.16 15.16 14.67 15.08 15.0 14.33 15.42 14.33 Time Ddllin~l wee Completed 1:43 p.m. 1:56 p.m. 2:10 p.m. 2:29 p.m. 3:00 p.m; 3:10 p.m. 3:20 p.m., 2:53 p.m. 2:36 p.m. Time Concrete wes Placed 3:42 p.m. 4:02 p.m, 4:05 p.m. 4:12 p.m. 4:16 p.m. 4:30 p.m. 4:38 p,m. 4:49 p.m. 5:00 p.m.