Loading...
121 BP Phase 1-LR 990810 GEOTECHNiC~'.L AN~ I~ ~ r-'l U F~ EN¥1 =,O N M ENT.~,L CO NSU LTA ",ITS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 45 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 08-10-99 ATTN: Mr. John Walsh TECHNICIAN: B. Ray CONTRACTOR: Westcliffe. Inc. Location of Sample I Set Number I Location I Quantity Represented i I Bldg.#3 Grade Beam at Line B/8-10 10/46 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. N/R 18 4000 Test Results Set ICylinderI Age@ TotalLoad Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6610 08-17-99 7 103900 3680 6610 09-07-99 28 6610 09-07-99 28 6610 Hold Cylinder Data Set I Cylinder I Time of Concrete Air I Ticket No. ! ID I. Slump . Sample . AirTemp.. Temp. . Entrainment ! Number 1 6610 5.00 2:35 PM 100 98 N/A 7075327 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ~-';:4 S-JTZ DR · SL. ITE zC.:~ · :~'LL.AS. q'X -$23f · TEL ;2'-i; 35;. ~-~:: · ~-AX ;21-'i 35:: Z:;'~.- GEOTECHNICAL ~" 1',, D ENV ~,ONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 45 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 08-10-99 ATTN: Mr. John Walsh TECHNICIAN: B. Ray CONTRACTOR: Westcliffe, Inc. Location of Sample ! Set Number I Location I Quantity Represented i 1 Building 3 grade beam - B/8 to 10 10/46 yds Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. N/A 18 4000 Test Results Set I CylinderI Age~ Total Load Compressive I Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6610 08-17-99 7 103900 3680 09-07-99 28 128160 4540 I 09-07-99 28 129500 4580 4560 ' Hold Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6610 5.00 02:35 PM 100 98 N/A 7075329 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/cdl Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger 242-:' S-d-Z DR · SL -E z:,:, o DALLAS -X -E£3_: · -EL :2i:: 2-.-'2 '_':.~.CC · ---"X [£-,c,: ?E-- CCI~